MODERN TUNNELLING TECHNOLOGY 2021, Vol. 58 Issue (4) :210-217    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis of and Countermeasures against the Assembly Deviations of Prefabricated and Assembled Lane Structure in Double-deck Shield-driven Tunnels
(Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai 200092)
Download: PDF (4454KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract A shield-driven tunnel is a longitudinal flexible structure prone to such issues as dislocation and axis deviation, which are contrary to the requirements for high precision in prefabricated construction. In view of this, the common practice is to correct and eliminate shield tunnel deformation-induced deviations by means of cast-inplace strips and leveling layers in conjunction with the synchronous construction process in shield tunnelling. In other words, it is to form a monolithic prefabricated and assembled structure of "prefabricated main body + small amount of cast-in-place component". However, the space inside the shield-driven tunnel is so limited that excessive cast-in-place strips and over-thick leveling layers are not economical or time-efficient, and would also take up valuable internal space. Therefore, the cast-in-place strips and leveling layers should be set up in a reasonable manner so that they meet the need to eliminate longitudinal uneven deformations in shield-driven tunnels without taking up too much space. In light of this, this paper analyzes the characteristics of longitudinal uneven deformations in shield-driven tunnels based on the measured axis deviations in Shanghai Zhuguang Road tunnel and extant relevant literatures, and combined with the construction process it proposes a reasonable solution to eliminate longitudinal uneven deformations in shield tunnels with prefabricated and assembled lane structures, as well as a reasonable value for the thickness of the leveling layer. The results show that as for the upper prefabricated lane structure, the cast-in-place concrete base with bonded rebars could eliminate most of longitudinal uneven deformations in shielddriven tunnels, while leveling layers could eliminate a small amount of longitudinal uneven deformations and assembly deviations. For the lower prefabricated lane structure, longitudinal uneven deformations and assembly deviations in the shield-driven tunnel could be eliminated with leveling layers. The reasonable thickness of leveling layer for the upper and lower prefabricated lane structures is 100 mm and 130 mm respectively.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Nian
KeywordsShield tunnel   Double-deck lane structure   Prefabrication and assembly   Deviations of structure   Lev? eling layer thickness     
Abstract: A shield-driven tunnel is a longitudinal flexible structure prone to such issues as dislocation and axis deviation, which are contrary to the requirements for high precision in prefabricated construction. In view of this, the common practice is to correct and eliminate shield tunnel deformation-induced deviations by means of cast-inplace strips and leveling layers in conjunction with the synchronous construction process in shield tunnelling. In other words, it is to form a monolithic prefabricated and assembled structure of "prefabricated main body + small amount of cast-in-place component". However, the space inside the shield-driven tunnel is so limited that excessive cast-in-place strips and over-thick leveling layers are not economical or time-efficient, and would also take up valuable internal space. Therefore, the cast-in-place strips and leveling layers should be set up in a reasonable manner so that they meet the need to eliminate longitudinal uneven deformations in shield-driven tunnels without taking up too much space. In light of this, this paper analyzes the characteristics of longitudinal uneven deformations in shield-driven tunnels based on the measured axis deviations in Shanghai Zhuguang Road tunnel and extant relevant literatures, and combined with the construction process it proposes a reasonable solution to eliminate longitudinal uneven deformations in shield tunnels with prefabricated and assembled lane structures, as well as a reasonable value for the thickness of the leveling layer. The results show that as for the upper prefabricated lane structure, the cast-in-place concrete base with bonded rebars could eliminate most of longitudinal uneven deformations in shielddriven tunnels, while leveling layers could eliminate a small amount of longitudinal uneven deformations and assembly deviations. For the lower prefabricated lane structure, longitudinal uneven deformations and assembly deviations in the shield-driven tunnel could be eliminated with leveling layers. The reasonable thickness of leveling layer for the upper and lower prefabricated lane structures is 100 mm and 130 mm respectively.
KeywordsShield tunnel,   Double-deck lane structure,   Prefabrication and assembly,   Deviations of structure,   Lev? eling layer thickness     
Cite this article:   
LIU Nian .Analysis of and Countermeasures against the Assembly Deviations of Prefabricated and Assembled Lane Structure in Double-deck Shield-driven Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2021,V58(4): 210-217
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2021/V58/I4/210
 
No references of article
[1] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[2] WANG Wenjuan GAO Xin.Study on Factors Affecting the Stability of Double-Layer Superimposed Lining#br# in Deep-Buried Tunnels under the Action of High Water Pressure #br#[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 12-20
[3] U Li1,2 SUN Yuan1,2 WANG Mingnian1,2.Research on the Calculation Method for Frost-Resistance Fortification Lengths of Tunnels in Cold Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 21-28
[4] QIN Shangyou1 CHEN Jiayao2 ZHANG Dongming2 YANG Tongjun1 HUANG Hongwei2 ZHAO Shuai2.Automatic Identification of Rock Structure at Tunnel Working Face Based on Deep Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 29-36
[5] LI Pengju1 ZHENG Fangkun2 LV Jianbing3 WU Weijun3 LIU Feng3 CHEN Gongfa3.Automatic Identification Technique for Siltation and Blockage Conditions in Drainage Pipes in Limestone Areas Based on Big Data and Transfer Learning[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 37-47
[6] SONG Fubin1 YANG Jie1 CHENG Lin1 LV Gao1,2 SONG Yang1.Application of GPR Forward Modeling in the Identification of Tunnel Lining Defects[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 48-56
[7] ZHAI Qiang GU Weihong JIN Zhaoqin.Safety Risk Assessment for a Subway Connecting Passage Constructed by Freezing Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 57-66
[8] YE Fei1 HE Biao1 TIAN Chongming1 WANG Siyu1 WANG Jian1 SONG Guifeng2.Research Progresses on Triethanolamine Early-Strength Agents and Its Application Prospects in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 67-78
[9] XIE Jun1,2 NI Yajing2 HU Yingfei2 BAO Shuxian2 LI Yantao1.Research Progress on the Model Box for Shaking Table Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 79-85
[10] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[11] ZHANG Lili1 LANG Songjun1 DENG Lin2 ZANG Cheng3.Study on the Triaxial Compression Mechanical Properties and Damage Constitutive Model of Tunnel Sandstone in Seasonal Frozen Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 95-103
[12] LI Xinxi1 YU Haitao2 LI Chunyuan3 YU Xiaodong4 XU Lei5.3D Large-scale Seismic Response Analysis of Bored Section of an Immersed Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 104-108
[13] FENG Yi.Two-Stage Safety Analysis of Overlapped Shield Tunnels Based on Dynamic Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 109-116
[14] WANG Bo1 ZHENG Pengfei1 HU Jiangyang1 LIU Junyong1 LIU Shuo2.Numerical Simulation of Construction Process and Analysis of Influencing Factors in Parallel Shield Tunnelling with Close Distance[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 117-124
[15] ZHANG Hong1,2 LIU Haiyang1,3.Research on the Impact of Subway Shield Tunnelling on the Stability of Overcrossing Underpass Foundation Pit[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 125-132
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY