MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (2) :20-27    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis on Spacing Optimization for Circumferential Blind Drainage Pipes of Tunnels in the Water-rich Area
(1. School of Civil Engineering, Central South University, Changsha 410075; 2. National Engineering Laboratory of High-speed Railway Construction Technology, Central South University, Changsha 410075; 3. Guangdong Nanyue Transportation Investment and Construction Co., Ltd., Guangzhou 510101)
Download: PDF (3978KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract As for the water inflow in water-rich tunnels, it follows the treatment principle that "priority is given to blocking, and waterproof and drainage are combined". The rationality of drainage system is a key factor of the safe construction and good operation of tunnels. First the tunnel drainage system is analyzed to reveal its working principle, and then the finite difference software FLAC 3D is adopted to carry out the 3D fluid-solid coupling simulation for different spacing conditions of circumferential blind drainage pipes in the water-rich fault zone of Hongtu extralong tunnel, and the seepage pressure, rock bolt stress and water inflow are analyzed to reveal the volume and distribution characteristics of the plastic zone. The study result shows that the pore water pressure on the support structure along the tunnel axis is roughly periodically distributed, with the period approximating to the longitudinal spacing between circumferential blind drainage pipes; increasing the density of circumferential blind drainage pipes, it could reduce the stress on the support structure and the volume of plastic zone and also increase the amount of tunnel drainage; with an increase in the spacing between circumferential blind drainage pipes, the plastic zone of grouting reinforcement ring first appears in the area where the surrounding rock is good and appears in the fault area at the latest; the reinforcement effect of anchor bolts in the fault area is poor, so the circumferential spacing between steel ribs can be reduced to improve the structural rigidity and make the axial stress on the grouting reinforcement ring more reasonable. After due consideration of various factors, it is recommended that regarding the studied tunnel project the spacing between circumferential blind drainage pipes in the fault area should be 3 m and the spacing in the areas near the fault should be 4 m.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
FU Helin1
2 AN Pengtao1
2 CHENG Guowen3 LI Jie1
2 YU Xiaohui3 CHEN Long1
2
KeywordsWater-rich fault   circumferential blind drainage pipe   fluid-solid coupling   Seepage field   Plastic zone     
Abstract: As for the water inflow in water-rich tunnels, it follows the treatment principle that "priority is given to blocking, and waterproof and drainage are combined". The rationality of drainage system is a key factor of the safe construction and good operation of tunnels. First the tunnel drainage system is analyzed to reveal its working principle, and then the finite difference software FLAC 3D is adopted to carry out the 3D fluid-solid coupling simulation for different spacing conditions of circumferential blind drainage pipes in the water-rich fault zone of Hongtu extralong tunnel, and the seepage pressure, rock bolt stress and water inflow are analyzed to reveal the volume and distribution characteristics of the plastic zone. The study result shows that the pore water pressure on the support structure along the tunnel axis is roughly periodically distributed, with the period approximating to the longitudinal spacing between circumferential blind drainage pipes; increasing the density of circumferential blind drainage pipes, it could reduce the stress on the support structure and the volume of plastic zone and also increase the amount of tunnel drainage; with an increase in the spacing between circumferential blind drainage pipes, the plastic zone of grouting reinforcement ring first appears in the area where the surrounding rock is good and appears in the fault area at the latest; the reinforcement effect of anchor bolts in the fault area is poor, so the circumferential spacing between steel ribs can be reduced to improve the structural rigidity and make the axial stress on the grouting reinforcement ring more reasonable. After due consideration of various factors, it is recommended that regarding the studied tunnel project the spacing between circumferential blind drainage pipes in the fault area should be 3 m and the spacing in the areas near the fault should be 4 m.
KeywordsWater-rich fault,   circumferential blind drainage pipe,   fluid-solid coupling,   Seepage field,   Plastic zone     
Cite this article:   
FU Helin1, 2 AN Pengtao1, 2 CHENG Guowen3 LI Jie1 etc .Analysis on Spacing Optimization for Circumferential Blind Drainage Pipes of Tunnels in the Water-rich Area[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 20-27
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/20
 
No references of article
[1] ZHANG Fujun1 HU Jun2,3 DUAN Yu4 ZHU Caihui4.Optimization and Application of the Treatment Schemes for Water Inrush in a Water-rich Tunnel in Fault Zones[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 122-131
[2] PAN Xudong1 BAI Yunlong1 BAI Yunfei2 ZHANG Zhiqiang2 LIAO Lin1.Study on the Influence Pattern of Seepage Field on Temperature Field in the Construction of the Metro Cross Passage by Freezing Method in Water-Rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 122-128
[3] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[4] GUO Yonghui1 YANG Junsheng2.Simulation Analysis on Structural Cracking Damages of Railway Tunnels with Construction Joints in Water-rich Condition[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 141-147
[5] SHI Yujing.Study on Structural Stability of Mined Large-Span Tunnels Constructed by Two Arch-Cover Methods in Upper-Soft and Lower-Hard Rock Stratum of Qingdao Area[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(2): 117-126
[6] CHEN Xi1 ZHAO Yong2 YANG Yushun3.Effect of Rock Mechanical Parameters on Stability of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 77-84
[7] CHEN Xin1, 2,3 ZHANG Ze1 LI Dongqing1 ZHOU Panfeng4 ZHANG Hu1.Research on Evolution Law of Freezing Temperature Field in Seepage Formation of Fractured Rock Mass without Filling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 135-142
[8] LI Ming YAN Songhong PAN Chunyang ZHANG Xubin.Analysis of Fluid-Solid Coupling Effect during Excavation of the Water-rich Large-section Loess Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 81-88
[9] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 61-71
[10] LI Qianqian1 YIN Fan2 ZHANG Dingli3.Stability of a Hollow Cavity with Complex Displacement Boundary Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 87-96
[11] .Construction Technology for the Dazhushan Tunnel in a High-Pressure Fault with Abundant Water[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 160-166
[12] .Strata Disturbance Influenced by Soil Mechanical Parameters Varying with Dynamic Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(4): 131-136
[13] .Support Deformation Induced Clearance Invasion and Treatment for a Pelitic Soft-Rock Tunnel Passing through a Water-Rich Fault Zone[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 181-189
[14] LIANG Xiao-Yong- Jin- Jing- Zhang-Chun-Hui.On Characteristics of Displacements Induced by Approaching Metro Tunnel Construction in a Cobble Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(1): 110-115
[15] FU Ya-Peng- 1 Fang- Yong- 2 Cui- Ge- 2 Guo-Jian-Ning- 2.Influence of Small-Scale Underlying Mined-out Areas with Different Dip Angles in Thin Seam on Tunnel Excavation Stability[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 70-76
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY