Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (5) :44-50    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Research on Reasonable Design Load Values for a Multi-Arch Tunnel
1 Key Laboratory of Geotechnical and Underground Engineering of Ministry of Education, Department of Geotechnical Engineering, Tongji University 2 Jiangxi Changtai Expressway Co., Ltd 3 China Railway Siyuan Survey and Design Group Co., Ltd
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Considering the absence of a theoretical basis for design loads for multi-arch tunnels, appropriate parameters were selected and reasonable calculation models built based on the load calculation formula for normally separated tunnels. The character of the "loose zone" and appropriate load values for a four-lane multi-arch tunnel were established, and the formula of load calculation was developed from pure empirical deduction to semi-empirical deduction with more definite theoretical basis. Results indicate that the design load basically agrees with the measured one.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: Considering the absence of a theoretical basis for design loads for multi-arch tunnels, appropriate parameters were selected and reasonable calculation models built based on the load calculation formula for normally separated tunnels. The character of the "loose zone" and appropriate load values for a four-lane multi-arch tunnel were established, and the formula of load calculation was developed from pure empirical deduction to semi-empirical deduction with more definite theoretical basis. Results indicate that the design load basically agrees with the measured one.
Keywords:   
Cite this article:   
.Research on Reasonable Design Load Values for a Multi-Arch Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(5): 44-50
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I5/44
 
No references of article
[1] MENG Desheng1,2 PENG Xiaodong3 YANG Guanghua3.Vibration Reduction Technology and Safety Control Standards for Multi-arch Tunnels without Middle Walls[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 251-260
[2] LIU Sijin1 SHI Linken1 WEI Yingjie1 WANG Huawei1 DU Jikai2 WANG Jun1 YU Yunxiang1 ZHU Lin3.Study on Thrust Vector Control Method for Shield Synchronous Propulsion and Assembly Based on Thrust Uniformity[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 10-20
[3] ZHANG Xiao1, 2 WANG Mingnian1, 2 YU Li1, 2 WANG Zhilong1, 4 LIU Dagang1, 3 MA Zhizhong5.Theoretical Calculation Model for Stability of Tunnel Excavation Face with Pre-grouting Reinforcement[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 42-51
[4] LI Jiahao1 XI Mingxing2 SHEN Yi1 LIU An2 ZHU Hehua1.Calculation and Composition Assessment of the Carbon Emission in the Construction Phase of Highway Tunnels Based on SimaPro[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 20-28
[5] Zhang Xiaoying1 Liu Tao2 Shen Yi2 Liu An3.Analysis of the Effect of Lighting on Carbon Emission in the Full Life Cycle of Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 40-47
[6] WANG Guan.Study on Action Mechanism of Double-layer Support for the Parallel Adit of Tunnels in Extremely-squeezed Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 86-94
[7] WANG Mingjiang1 CI Xinhang2 CHEN Junwu3 ZHU Changjiang1 YANG Feng2.Construction Technology for the Shallow Twin-tube Six-lane Multi-arch Tunnel without Middle Drift under Large Unsymmetrical Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 241-248
[8] LU Xiaogang1 GENG Jianyu1 PANG Lei1 FAN Jinhai1 LI Liangyong1 FANG Yabiao2,3 WANG Feng2,3.Analysis of Construction Mechanical Behavior and Parameter Optimization for Subsequent Tunnel Tube of Double-arch Tunnel without Middle Drift[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 80-90
[9] JIA Yanling1,2,3 ZHOU Shaowen2,3 WANG Gang2,3 ZHOU Weizheng2,3 YANG Kunguang2,3.Study on the Stress Characteristics of the Mid-pillar in the Expansion of an Existing Tunnel into a Double-arch Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 130-138
[10] QIAN Zhengfu1 XU Jinfeng2,3 ZHOU Yingxin1,2,3 ZHOU Biao2,3 XIE Xiongyao2,3.Monitoring and Control Technology for Blasting Vibration of the Double-arch Tunnel without Middle Drift in Red-bed Soft Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 167-174
[11] YANG Guolin1 HU Min1 SHEN Zongqiu2 YANG Jie2.Research on Bearing Modes of Compound Middle-wall of Multi-arch Tunnels with Large Spans[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 136-141
[12] LIU Jingliang1 FANG Yuchao2 YE Xiaomu1.A Comparative Study of the Excavation Methods for the Large-span Intersection of Zizhi Tunnel in Hangzhou[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(6): 167-172
[13] LIU Jun1 NAN Zhiling1,2 JIN Xin3.Calculation Model of Earth Chamber Pressure during Non-Barrier Launching of EPB Shield[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 113-118
[14] QIU Junling1 LAI Jinxing1, 2 GUO Chunxia2 FAN Haobo1 XIE Yongli1.In-situ Test and Analysis of Mechanical Behaviors of the Mid-wall of Multi-arch Loess Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 134-
[15] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 72-78
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY