[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2022, Vol. 59 Issue (4) :273-    DOI:
新型材料与设备 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
高水压盾构隧道管片密封垫装配力与防水性能研究
 
(1.中铁二院工程集团有限责任公司,成都 610031;2.西南交通大学 交通隧道工程教育部重点实验室,成都 610031)
Assembly Force and Waterproofing Performance of Segment Sealing Gasket in High Water Pressure Shield Tunnels
 
(1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031; 2. Key Laboratory of Transportation Tunnel Engineering of Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (5352KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
文章导读  
摘要 为探究高水压盾构隧道管片密封垫装配力与防水性能,依托上元门越江隧道工程,通过装配力试验、耐水压试验和数值模拟手段,分析了7种不同截面形式的密封垫在不同压缩阶段内密封垫变形特征、装配力增长规律以及耐水压力的主要影响因素。研究结果表明,密封垫的压缩过程可分为三个阶段:阶段Ⅰ密封垫装配力近似线性增长,阶段Ⅱ装配力增加缓慢,阶段Ⅲ装配力随压缩量增大快速增加至最大值。密封垫最大装配力和最大压缩量 越大,其耐水压力越高,并且其装配力随压缩量增加而增长得越平稳,越有利于密封垫防水。对于不同的截面形式,在同一管片沟槽形式下,密封垫高度越高,其最大压缩量一般越大,盾构隧道管片接缝完全闭合时的装配力越大,且三角形封闭孔型优于其他孔型,底面为整片橡胶连接的密封垫优于底面为梳齿结构的密封垫。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
文彦鑫 1 霍永鹏 2 吴 悦 2 常 鑫 1 张 天 2 晏启祥 2
关键词盾构隧道   接缝防水   弹性密封垫   室内试验   数值模拟     
Abstract: To investigate the assembly force and waterproofing performance of segment sealing gaskets in high water pressure shield tunnels, this paper analyzes the major factors that affect the characteristics of gasket deformation,the growth law of assembly force, and the water-resistant pressure of seven sealing gaskets with different cross-setional forms in different compression stages, based on the Shangyuanmen Cross-river Tunnel Project and through different means such as assembly force test, water pressure test and numerical simulation. The results show that the compression process of the gaskets can be divided into three stages: Stage I when the sealing assembly force increases almost linearly; Stage Ⅱ when the increase of the assembly force slows; and Stage Ⅲ when the compression increases rapidly to the maximum assembly force. The greater the maximum assembly force and maximum compression of the gaskets are, the higher their water-resistant pressure will be, the more steadily their assembly force would increase with the growth rate of compression, and the more conducive it will be for their waterproof performance. For different cross-sectional forms and under the same groove form of the segment, the higher the height of a gasket is, the greater its maximum compression will be in general, and the greater the assembly force will be when the shield segment joint is completely closed. Furthermore, the triangular closed-hole type is better than other hole types, and gaskets with a whole rubber joint on the bottom are better than those with a comb-tooth structure on the bottom.
KeywordsShield tunnel,   Waterproof of segment joint,   Elastic sealing gasket,   Indoor test,   Numerical simulation     
基金资助:国家自然科学基金(51878573).
作者简介: 文彦鑫(1997-),男,工程师,主要从事地铁结构设计方面的研究工作,E-mail:1017185421@qq.com. 通讯作者:晏启祥(1971-),男,博士,教授,博土生导师,主要从事隧道工程方面的教学与科研工作,E-mail:764365015@qq.com.
引用本文:   
文彦鑫 1 霍永鹏 2 吴 悦 2 常 鑫 1 张 天 2 晏启祥 2 .高水压盾构隧道管片密封垫装配力与防水性能研究[J]  现代隧道技术, 2022,V59(4): 273-
WEN Yanxin1 HUO Yongpeng2 WU Yue2 CHANG Xin1 ZHANG Tian2 YAN Qixiang2 .Assembly Force and Waterproofing Performance of Segment Sealing Gasket in High Water Pressure Shield Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(4): 273-
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I4/273
 
没有本文参考文献
[1] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[2] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[3] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[4] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[5] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[6] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[7] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[8] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[9] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[10] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[11] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[12] 葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2.不同形式拱架初期支护变形规律实测与数值研究[J]. 现代隧道技术, 2025,62(3): 40-49
[13] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[14] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[15] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
Copyright 2010 by 现代隧道技术