[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2023, Vol. 60 Issue (3) :112-122    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
基于剪切边界的隧道系统锚杆剪力特征离散元数值模拟研究
(1.西南交通大学交通隧道工程教育部重点实验室,成都 610031;2.西南交通大学土木工程学院,成都 610031;3.中铁十七局集团第一工程有限公司,青岛 266555)
Discrete Element Numerical Simulation Study on Shear Characteristics of Tunnel Systematic Bolts Based on Shear Boundary
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2.School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031; 3. China Railway No. 17 Engineering Group No.1Engineering Co., Ltd., Qingdao 266555)
Download: PDF (7370KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 采用块体离散元数值模拟方法,构造出锚杆受剪的边界条件,对隧道系统锚杆剪力的断面分布特征及演化规律开展了数值模拟研究,并探讨了围岩破碎程度、锚杆布置形式等因素对锚杆剪力的影响。结果表明:(1)隧道系统锚杆的剪力与节理剪切位移正相关,锚杆的剪切效应发生于破碎岩体中,在完整岩体中可以被忽略;(2)锚杆剪力总是低于相同位置的轴力,但剪轴比最大可接近75%;(3)在锚杆施作初期,锚杆剪力会因施作部位、锚杆到隧道内轮廓表面距离的不同存在较为显著的差异,施作初期的锚杆剪力峰值可能高于长期稳定值;(4)破碎岩体中的破碎岩块体积越大,或破碎范围越广,锚杆的剪力也越大;(5)系统锚杆越长,越容易受到剪切作用,密集的锚杆布置有助于减小系统锚杆承受的剪力。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
赵东平 1
2 张柏浩 2 李 华 3 赵晓宇 3
关键词隧道   剪切边界   系统锚杆   锚杆剪力   块体离散元     
Abstract: By using the block discrete element numerical simulation method and creating the boundary conditions of bolt shearing, the numerical simulation study on the sectional distribution characteristics and evolution law of shear of tunnel systematic bolts has been conducted, and how the factors such as surrounding rock fracture degree and bolts layout pattern will affect the bolt shear has been investigated. The study results are stated as follows: (1) The shear of the tunnel systematic bolts and joint shear displacement are in positive correlation, and the shearing effect of bolt happens in broken rock mass and is negligible in intact rock mass; (2) The bolt shear is always less than the axial force at the same position, but the maximum shear-axial force ratio is close to 75%; (3) In the initial stage of bolt installation, the bolt shear will differ considerably due to the installation position and the distance between bolt and inner contour surface of tunnel, and the bolt shear peak in the initial stage of installation may be higher than the long-term stable value; (4) Greater broken rock volume or greater breaking range in the broken rock mass means greater bolt shear; (5) Longer bolts are more susceptible to shear, and densely placed bolts can help reduce the shear sustained by the systematic bolts.
KeywordsShear boundary,   Tunnel,   Systematic bolts,   Bolt shear,   Block discrete element     
基金资助:四川省自然科学基金面上项目(2022NSFSC0318);中铁十七局科研课题(KYL202203-0071).
作者简介: 赵东平(1979-),男,博士,副教授,教授级高级工程师,主要从事隧道科研及设计工作,E-mail: 704215958@qq.com.
引用本文:   
赵东平 1, 2 张柏浩 2 李 华 3 赵晓宇 3 .基于剪切边界的隧道系统锚杆剪力特征离散元数值模拟研究[J]  现代隧道技术, 2023,V60(3): 112-122
ZHAO Dongping1, 2 ZHANG Bohao2 LI Hua3 ZHAO Xiaoyu3 .Discrete Element Numerical Simulation Study on Shear Characteristics of Tunnel Systematic Bolts Based on Shear Boundary[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 112-122
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I3/112
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[3] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[4] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[5] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[6] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[7] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[8] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[9] 钟武霖1 韩兴博1 叶 飞1 王 涵1 曹校勇2 奚魏征2.隧道竖井钢波纹板支护风阻及优化设计研究[J]. 现代隧道技术, 2025,62(4): 197-207
[10] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[11] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[12] 刘力英1 魏立新1 喻志远2 杨旭东3 叶婷婷1.如意坊沉管隧道建造关键技术[J]. 现代隧道技术, 2025,62(4): 259-272
[13] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[14] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[15] 巴 金1 唐 刚2.白云质灰岩地层岩溶隧道支护结构受力特征及控制技术[J]. 现代隧道技术, 2025,62(4): 283-290
Copyright 2010 by 现代隧道技术