内部结构不同施作时机对特大断面盾构隧道管片衬砌受力的影响研究
(1.西南交通大学交通隧道工程教育部重点实验室,成都 610031;2.中铁第四勘察设计院集团有限公司,武汉 430063)
Study on the Impact of Different Construction Timings of Internal Structure on the Stress of Segmental Lining of the Shield Tunnel with an Super-large Section
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063)
Download: PDF (7859KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 以在建荷坳隧道为工程背景,采用有限元方法建立管片-内部结构三维精细化数值计算模型,通过分析内部结构不同施作时机下管片与内部结构的受力及变形,研究内部结构施作时机对特大断面盾构隧道管片衬砌受力性能的影响。结果表明,提前施作内部结构可以有效增加管片环横向刚度,并提升内部结构分担管片应力的占比,以将内部结构施作时机由 5‰ 椭圆度提前至 3‰ 椭圆度为例,管片与内部结构变形极值分别减小 28.47% 与32.83%,管片及其钢筋应力极值分别减小50.0%与14.4%,内部结构及其钢筋应力极值分别上升70.37%与19.55%;内部结构施作时机对管片环及内部结构的变形与应力分布规律基本无影响,但提前施作内部结构可使得管片及钢筋应力分布更加均匀;内部结构对管片环水平变形有较强抑制能力,以施作时机3‰椭圆度工况为例,内部结构施作后,管片竖向位移继续增加约19.0%,而水平位移仅增加0.36%,变形形态由“横鸭蛋状”转为“蝴蝶状”
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
胡振宇 1 封 坤 1 郭文琦 1 彭长胜 2 李姣阳 2
关键词盾构隧道   特大直径   内部结构   施作时机   横向力学性能   数值模拟     
Abstract: In the He'ao Tunnel project which is under construction, finite element method (FEM) is utilized to build a 3D refined numerical calculation model for segments and internal structure, and the impact of construction timing of internal structure on the stress performance of segmental lining of the shield tunnel with a super-large cross section is studied through the analysis of the stress and deformation of segments and internal structure at different construction timings of internal structure. The results show that both the transverse stiffness of segment rings and the proportion of segment stress shared by the internal structure would be raised if the internal structure construction started in advance. For example, if the construction timing is advanced from the time when ovality is 5‰ to the time when ovality is 3‰, the extreme values of the deformation of segment and internal structure will be reduced by 28.47% and 32.83% respectively, the extreme values of the stress of segment and its rebars will decrease by 50.0% and 14.4%, and the extreme values of the stress of internal structure and its rebars separately will increase by 70.37% and 19.55%; the construction timing of internal structure has no impact on the deformation and stress distribution law of segment ring and internal structure , but if the internal structure is constructed in advance, the stress of segments and rebars will be distributed more evenly; the internal structure will have a relatively strong ability to suppress the horizontal deformation of segment rings. Taking the case where the construction timing is the time when ovality is 3‰ as an example, the vertical displacement of segments continue to increase by about 19.0% after the construction of internal structure, while the horizontal displacement increases by 0.36% only, and the deformation shape changes from "horizontal duck egg shape" to "butterfly shape" .
KeywordsShield tunnel,   Super-large diameter,   Internal structure,   Construction timing,   Transverse mechanical property,   Numerical simulation     
基金资助:国家自然科学基金(52078430,51878569).
作者简介: 胡振宇(2001-),男,硕士研究生,主要从事隧道结构设计与施工研究工作,E-mail: 18070020997@163.com. 通讯作者:封 坤(1983-),男,博士,教授,主要从事隧道与地下工程方面的研究与教学工作,E-mail:windfeng813@163.com.
引用本文:   
胡振宇 1 封 坤 1 郭文琦 1 彭长胜 2 李姣阳 2 .内部结构不同施作时机对特大断面盾构隧道管片衬砌受力的影响研究[J]  现代隧道技术, 2023,V60(3): 90-101
HU Zhenyu1 FENG Kun1 GUO Wenqi1 PENG Changsheng2 LI Jiaoyang2 .Study on the Impact of Different Construction Timings of Internal Structure on the Stress of Segmental Lining of the Shield Tunnel with an Super-large Section[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 90-101
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I3/90
 
没有本文参考文献
[1] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[2] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[3] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[4] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[5] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[6] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
[7] 贾永刚1 郝子晗1 鲁卫东1 吴 帆1 阳卫卫2.钢纤维混凝土管片不同接头型式力学性能研究[J]. 现代隧道技术, 2025,62(4): 182-196
[8] 谭鑫雨1 韦 猛1,2 兰灵申1 尚 强1 张海涛1.盾构刀盘结泥饼土体降黏附试验与机理研究[J]. 现代隧道技术, 2025,62(4): 219-229
[9] 刘朋飞1,2 曾德星2 王 霄3 杨 钊2 李 钰2.盾构泥饼分解剂作用效果评价试验及应用研究[J]. 现代隧道技术, 2025,62(4): 230-237
[10] 罗 龙1 朱开宬2 韩瑀萱3 蔡 东4 刘哲奇5 王 俊6.超大断面隧道施工工法优化研究 ——以天邛高速公路梨花山隧道工程为例[J]. 现代隧道技术, 2025,62(4): 273-282
[11] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[12] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[13] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[14] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[15] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
Copyright 2010 by 现代隧道技术