现代隧道技术 2024, Vol. 61 Issue (3) :276-289    DOI:
规划设计与施工 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
大直径盾构隧道近接高架桩基群施工影响分区方法与分区控制技术研究
(中铁十四局集团大盾构工程有限公司,南京 211899)
Study on Impact Zoning Method and Zoning Control Technique for Construction of Large-diameter Shield Tunnel Adjacent to Viaduct Pile Foundation Group
(China Railway 14th Bureau Group Mega Shield Construction Engineering Co., Ltd., Nanjing 211899)
Download: PDF (10489KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为探究大直径盾构隧道施工近接高架桩基群的影响分区并提出有效的综合控制措施,以上海机场联络轨道工程中七宝山站—华井站区间盾构施工近接高架桩基群为工程背景,采用数值模拟以及理论分析提出近接影响分区方法,采用数值模拟与现场测试验证的方法探究分区加固方案的控制效果与有效性,主要得到以下结论:(1)基于水平近接度与垂直近接度建立的近接影响分区方法可以用于桩基群的近接度分析;(2)建议强影响区采用 MJS加固+隔离桩+承台下方袖阀管注浆的组合加固措施,弱影响区采用隔离桩控制的分区控制技术;(3)隔离桩主要起到隔绝土体水平变形的作用,MJS加固和承台下方注浆加固主要起到加固土体,减少土体受开挖扰动产生的松动滑移;(4)分区控制技术可以实现承台整体沉降降低50.4%、水平位移降低69.7%,桥墩柱整体沉降降低47.7%、水平位移降低56.0%,墩柱的倾斜度减小37.1%~46.9%。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
葛照国
关键词大直径盾构隧道   近接施工   高架桩基群   影响分区   加固技术     
Abstract: In order to investigate the impact zoning for large-diameter shield tunnel adjacent to viaduct pile founda? tion group and propose effective comprehensive control measures, the shield construction adjacent to viaduct pile foundation group in the Qibaoshan Station-Huajing Station interval in the Shanghai Airport Link Project is used as an example in this study, and numerical simulation and theoretical analysis are conducted to devise the adjacent impact zoning method. Numerical simulation and field test are conducted to investigate the control result and effectiveness of the zoned reinforcement scheme. The following conclusions are drawn: (1) The adjacent impact zoning method devised based on horizontal adjacent degree and vertical adjacent degree can be used for adjacent degree analysis of pile foundation group. (2) The combined reinforcement method of MJS reinforcement +isolation pile + sleeve valve pipe grouting below pile cap is proposed for strong impact zone, while the zoning control by isolation pile is proposed for weak impact zone. (3) The isolation pile is mainly meant to isolate the horizontal deformation of soil mass, while the MJS reinforcement and grouting below pile cap are mainly meant to reinforce the soil mass and minimize the looseness and slippage of soil mass induced by excavation. (4) The zoning control technique can reduce overall settlement of pile cap by 50.4% and its horizontal displacement by 69.7%, and reduce overall settlement of pier column by 47.7% and its horizontal displacement by 56.0%; the tilt of pier column is kept within 37.1%~46.9%.
KeywordsLarge diameter shield tunnel,   Approaching construction,   Viaduct pile foundation group,   Impact zoning,   Reinforcement technique     
基金资助:高速轨道交通大直径盾构隧道全预制装配智能化精益建造关键技术课题(202214jtky0069).
作者简介: 葛照国(1982-),男,高级工程师,主要从事地下工程施工与管理方面工作,E-mail: GeZG0921@163.com.
引用本文:   
葛照国 .大直径盾构隧道近接高架桩基群施工影响分区方法与分区控制技术研究[J]  现代隧道技术, 2024,V61(3): 276-289
GE Zhaoguo .Study on Impact Zoning Method and Zoning Control Technique for Construction of Large-diameter Shield Tunnel Adjacent to Viaduct Pile Foundation Group[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(3): 276-289
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I3/276
 
没有本文参考文献
[1] 郝鹏飞.预制整体式弧形件施工质量控制指标研究[J]. 现代隧道技术, 2024,61(1): 245-251
[2] 郑镇跡1 黄书华2 陈湘生1 张 良2 刘皓铭1 盛 健2 苏 栋1.超大直径盾构主隧道机械法联络通道特殊衬砌管片受力特性分析[J]. 现代隧道技术, 2024,61(1): 117-124
[3] 郇昊霖1 李培楠2 刘 俊1 宋兴宝3 秦 元3 寇晓勇3 翟一欣3.大直径盾构隧道内部装配式预制结构安装路径优化及应用[J]. 现代隧道技术, 2024,61(1): 236-244
[4] 范文昊 1,2 谢盛昊 1,2 周飞聪 1,2 王志杰 1,2 张 凯 3 骆云建 3.新建双线盾构隧道下穿既有隧道近接影响分区及控制措施案例研究[J]. 现代隧道技术, 2023,60(4): 43-57
[5] 韩晓明 1,2 何 源 1,2 张飞雷 2,3,4.富水粉细砂层大直径盾构隧道联络通道施工关键技术研究——以孟加拉卡纳普里河底隧道为例[J]. 现代隧道技术, 2023,60(3): 227-235
[6] 刘家明 1 张俊儒 1 王智勇 1 敬雅文 1 蒋曼琳 1 谭玉梅 1 陈可刚 2.硬质地层下近接隧道爆破振动影响分区及动力响应研究[J]. 现代隧道技术, 2023,60(2): 125-137
[7] 崔光耀 1 麻建飞 2 宁茂权 3,4 唐再兴 3,4 刘顺水 3,4 田宇航 1.软弱地层超大矩形顶管盾构隧道近接施工加固方案优选研究[J]. 现代隧道技术, 2023,60(2): 178-184
[8] 曹翔鹏 1,2 封 坤 2 薛皓匀 2 毛 升 1 喻 波 2,3.大直径盾构隧道双层衬砌横向抗震性能研究[J]. 现代隧道技术, 2023,60(1): 130-139
[9] 崔庆龙 1 李 金 1 高斌勇 2 熊欣悦 2.大直径盾构隧道管片纵缝三斜螺栓接头力学特性研究[J]. 现代隧道技术, 2022,59(5): 63-71
[10] 魏龙海 1 王 秒 2 吴树元 1.南京建宁西路越江隧道总体设计与关键技术[J]. 现代隧道技术, 2022,59(5): 228-236
[11] 杨 雄 1 孟庆辉 2 李 拼 1 徐灯飞 3 曹 峰 1.铁路车站隧道下穿桩基工程设计与分析[J]. 现代隧道技术, 2022,59(4): 218-225
[12] 张丽丽 1 单 琳 1 郭 飞 1 蔡 振 1 韩瑞林 1 张 旭 2,3,4 王智广 2 许有俊 2,3,4.小曲线半径叠落盾构隧道近接施工安全控制研究[J]. 现代隧道技术, 2022,59(3): 253-264
[13] 梁尔斌.隧道密贴下穿既有车站变形缝沉降控制研究[J]. 现代隧道技术, 2022,59(2): 182-191
[14] 孙双篪 1,2 沈 奕 1 周质炎 2 周 龙 1 朱合华 1.大直径盾构隧道穿越建筑物群变形分析与控制措施[J]. 现代隧道技术, 2022,59(2): 103-110
[15] 王志杰 1 李金宜 1 蒋新政 1 李 振 1 曾 青 2 王 宁 2.浅埋偏压双侧近接隧道影响分区及对策研究[J]. 现代隧道技术, 2021,58(4): 1-11
Copyright 2010 by 现代隧道技术