大直径盾构隧道穿越建筑物群变形分析与控制措施
(1.同济大学土木工程学院地下建筑与工程系,上海 200092;2.上海市政工程设计研究总院(集团)有限公司, 上海 200092)
Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes
(1. Department of Geotechnical Engineering, College of Civil Engineering, Tongji University, Shanghai 200092; 2. Shanghai Municipal Engineering Design Institute (Group) Co., Ltd., Shanghai 200092)
Download: PDF (3030KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 大直径盾构隧道掘进施工对土体造成扰动,导致地表产生沉降或隆起,继而严重威胁上部建筑物群的结构安全。文章依托某大直径盾构隧道穿越老旧小区密集建筑物群工程,首先利用二维有限元软件计算关键断面房屋的沉降变形,再对比三维有限元软件的计算结果,分析两种计算方法的适用范围;然后基于三维模型探究了不同初期荷载释放率对盾构穿越引起的地表和房屋变形的影响,最后利用Peck公式计算的理论地表沉降数据,梳理初期荷载释放率、地表沉降、地层损失率三者的内部联系并提出了控制变形的相关措施。研究结果表明,初期荷载释放率越小,地表及房屋沉降也越小,对应的地层损失也越小;对于控制地表变形,减小荷载释放率等同于减小地层损失率;初期荷载释放率、地表沉降、地层损失率这三者减小的量值呈线性关系。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
孙双篪 1
2 沈 奕 1 周质炎 2 周 龙 1 朱合华 1
关键词大直径盾构隧道   控制措施   数值分析   穿越建筑物群   荷载释放率     
Abstract: The excavation construction of large-diameter shield tunnels would cause disturbance to the soils, result? ing in ground settlement or heave, and thus bringing serious threats to the structural safety of the building complexes above. Based on a large-diameter shield tunnel passing under a dense group of building complexes in an old neighborhood, this paper first calculates the settlement deformation of the houses on key sections through 2D finite element software, and then compares the calculation results with those through 3D finite element software to analyze the applicability of the two calculation methods. Subsequently, on the basis of the 3D model, it studies the effects of different initial load release rates on the ground surface and house deformation caused by the shield tunnel construction. Finally, by using the theoretical ground settlement data calculated by the Peck formula, it sorts out the internal correlation among the initial load release rate, the ground settlement, and the ground loss rate, and puts forward relevant measures to control deformation. The research results show that the smaller the initial load release rate is, the smaller the ground surface and house settlement as well as corresponding ground loss will be. In terms of ground deformation control, the reduction of the load release rate is equivalent to decreasing the ground loss rate, and the decreasing amounts of initial load release rate, ground settlement, and ground loss rate are in a linear correlation.
KeywordsLarge-diameter,   Shield tunnel,   Control measure,   Numerical analysis,   Shield tunnels passing under building complexes,   Load release rate     
基金资助:国家自然科学基金(52090083);上海市青年科技英才扬帆计划(20YF1451400)
作者简介: 孙双篪(1985-),男,硕士,高级工程师,主要从事隧道工程设计与研究工作,E-mail: sscshilaixiu@163.com. 通讯作者:沈 奕(1988-),男,博士,助理研究员,主要从事地下工程建造及运营安全方面的研究工作,E-mail:shenyi@tongji.edu.cn.
引用本文:   
孙双篪 1, 2 沈 奕 1 周质炎 2 周 龙 1 朱合华 1 .大直径盾构隧道穿越建筑物群变形分析与控制措施[J]  现代隧道技术, 2022,V59(2): 103-110
SUN Shuangchi1, 2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1 .Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 103-110
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I2/103
 
没有本文参考文献
[1] 王怀正 1 宋战平 1,2 张学文 3 田小旭 1,2 潘红伟 4.富水弱胶结地层大断面隧道施工方案优化与工程应用研究[J]. 现代隧道技术, 2022,59(2): 210-219
[2] 杨春山 1 魏立新 1 莫海鸿 2.地震作用对盾构隧道管片张开量的影响及预测[J]. 现代隧道技术, 2022,59(1): 133-140
[3] 周晓军 1 郭 建 1 杨昌宇 2 卿伟宸 2 熊国兴 2 旷文涛 2 潘英东 1.钻爆法双线铁路隧道预制拼装二次衬砌分块方式研究[J]. 现代隧道技术, 2021,58(6): 46-58
[4] 黄 鹏 1,2 韦良文 1,2 张学富 1,2.城市轨道交通重叠换乘大拱脚暗挖车站拱脚加固研究[J]. 现代隧道技术, 2021,58(6): 137-147
[5] 冯敬辉 朱 颖.CRD法扩挖盾构隧道地层加固措施及周边环境变形影响分析[J]. 现代隧道技术, 2021,58(5): 204-212
[6] 李思明 1 禹海涛 2 薛光桥 3 徐 磊 4.穿越土-岩变化地层盾构隧道地震响应分析[J]. 现代隧道技术, 2021,58(5): 65-72
[7] 叶欣欣 1 苗 苗 2 钟宇健 2 徐硕硕 2 杜 可 2.浅埋偏压富水隧道地表注浆加固效果分析[J]. 现代隧道技术, 2021,58(4): 229-236
[8] 刘鹤冰.成渝高速公路扩能改造工程对新双碑隧道的影响研究[J]. 现代隧道技术, 2021,58(3): 229-234
[9] 贾艳领 1,2,3 周绍文 2,3 王 刚 2,3 周维政 2,3 杨昆光 2,3.既有隧道扩建为双连拱隧道中隔墙受力特征研究[J]. 现代隧道技术, 2021,58(3): 130-138
[10] 岳洪武 1 苗 苗 2.浅埋暗挖软岩隧道管棚预注浆加固效果分析[J]. 现代隧道技术, 2021,58(2): 111-117
[11] 伍宏宇 1,2 路军富 1 裴起帆 1.球墨铸铁-钢筋混凝土组合隧道壁板加载试验分析[J]. 现代隧道技术, 2021,58(1): 127-133
[12] 陈培帅 1,2 王 伟 1,3 吴忠仕 1,4 袁 青 1,4 江 鸿 1,5 翟世鸿 1,5.浅埋大跨度黄土隧道变形特征及控制措施研究 [J]. 现代隧道技术, 2021,58(1): 203-211
[13] 张丙武 1 张 鹏 1 戴振华 2 吴银河 2 罗 卫 2.河底地铁盾构隧道管片受力特征分析[J]. 现代隧道技术, 2020,57(3): 85-90
[14] 田志宇 1 田尚志 1 杨 枫 1 张兆杰 1 汪 波 2.百丈隧道穿越流塑状富水破碎带施工措施及其安全性评价[J]. 现代隧道技术, 2020,57(2): 176-183
[15] 李 强 1 甘鹏路 2.复合地层盾构刀具磨损控制技术研究[J]. 现代隧道技术, 2020,57(1): 168-174