高地应力下顺层偏压隧道开挖变形控制技术研究
(1.中铁十七局集团第四工程有限公司,重庆 401121;2.中南大学土木工程学院,长沙 410075; 3.高速铁路建造技术国家工程研究中心,长沙 410075)
Study on Deformation Control Technology for Unsymmetrically Loaded Tunnels in Bedding Strata under High Geo-stress
(1. China Railway 17th Bureau Group Fourth Engineering Co. Ltd., Chongqing 401121; 2. School of Civil Engineering, Central South University, Changsha 410075; 3. National Engineering Research Center for High-speed Railway Construction Technology,Changsha 410075)
Download: PDF (3841KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  中老昆万铁路甘庄隧道在施工过程中出现高地应力顺层偏压大变形,引起了隧道初期支护开裂、掉块、侵限等问题。针对甘庄隧道大变形问题,基于三台阶开挖法,提出变种短台阶施工控制技术,并采用块体离散元软件3DEC开展不同台阶高度和长度下隧道开挖数值模拟。结果表明,台阶参数对顺层偏压隧道变形影响显著,中台阶高度从4 m减小至2 m,隧道变形收敛急剧减小;当中台阶长度小于15 m时,增大中台阶长度,隧道变形收敛 逐渐减小,当中台阶长度大于15 m,隧道变形收敛趋于稳定,变形收敛稳定在21 cm左右。对于甘庄隧道顺层偏压段中台阶高度应设置在2 m左右,长度应控制在15 m以上,现场监测数据表明该施工控制技术在甘庄隧道取得了良好的变形控制效果。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
于国亮 1 娄义黎 2
3 吴国鹏 1 施成华 2
3 郑可跃 2
3
关键词顺层偏压   大变形   开挖工法   3DEC   控制技术     
Abstract: During the construction of Ganzhuang Tunnel on the China/Kunming-Laos/Vientiane Railway, large de? formation occurred due to high geo-stress and unsymmetrical load in bedding strata, which resulted in the cracking of tunnel primary support, block dropping and clearance invasion. Aiming at the large deformation of Ganzhuang tunnel, based on the three bench excavation method, a modified short bench construction control technology is proposed, and the block discrete element software 3DEC is used to carry out numerical simulation of tunnel excavation under different bench heights and lengths. The results show that the bench parameters have a significant effect on the deformation of the unsymmetrically loaded tunnel in bedding strata. When the height of the middle bench decreases from 4 m to 2 m, the tunnel deformation convergence decreases rapidly; When the length of the middle bench is less than 15 m, the deformation convergence of the tunnel decreases gradually with the increase of the length of the middle bench. When the middle bench length is greater than 15 m, the tunnel deformation convergence tends to be stable, and the tunnel deformation convergence is about 21 cm. The height of the middle bench in the bedding unsymmetrical loading section of Ganzhuang tunnel should be set at about 2 m, and the length of the middle bench should be controlled at more than 15 m. Field monitoring data show that this construction control technology has achieved good deformation control effect in Ganzhuang tunnel.
KeywordsUnsymmetrical load in bedding strata,   Large deformation,   Excavation method,   3DEC ,   Control technology     
基金资助:国家自然科学基金资助项目(5217082631)
作者简介: 于国亮(1982-),男,工程师,主要从事铁路工程建设技术管理工作,E-mail: 47129260@qq.com. 通讯作者:娄义黎(1994-),男,博士研究生,主要从事超大埋深复杂地质环境隧道建造理论研究,E-mail: louyilicsu99@163.com.
引用本文:   
于国亮 1 娄义黎 2, 3 吴国鹏 1 施成华 2, 3 郑可跃 2等 .高地应力下顺层偏压隧道开挖变形控制技术研究[J]  现代隧道技术, 2022,V59(5): 237-245
YU Guoliang1 LOU Yili2, 3 WU Guopeng1 SHI Chenghua2, 3 ZHENG Keyue2 etc .Study on Deformation Control Technology for Unsymmetrically Loaded Tunnels in Bedding Strata under High Geo-stress[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(5): 237-245
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I5/237
 
没有本文参考文献
[1] 巴 金1 唐 刚2.白云质灰岩地层岩溶隧道支护结构受力特征及控制技术[J]. 现代隧道技术, 2025,62(4): 283-290
[2] 王立川1,2 闫广天1 袁 玮3 高红兵4 李利平2 张春瑜1,5 吴 剑4 张 龙3.TBM搭载式全角法向深锚孔钻机研制与应用[J]. 现代隧道技术, 2025,62(3): 67-74
[3] 杨 益1,2 施成华1,2,3 郑可跃1,2 彭梦龙1,4 娄义黎1,2.高地应力红层软岩隧道大变形分级控制技术研究[J]. 现代隧道技术, 2024,61(5): 252-262
[4] 王建宇.“对抗”还是“屈让”?——围岩挤压性大变形处治的基本理念[J]. 现代隧道技术, 2024,61(3): 1-7
[5] 浣宇翔1 田礼勇2 杨文波1 李昊豫1 刘 勇3 唐 浩3 姚超凡1.软岩大变形隧道支护拆换力学与时空变形行为研究[J]. 现代隧道技术, 2024,61(3): 96-107
[6] 朱建林1 王立川2,3 刘志强1 马利遥2,3 李庆斌2.考虑流变效应的软岩大变形隧道多层支护作用机理分析[J]. 现代隧道技术, 2024,61(3): 18-24
[7] 陈志敏1 王 洪1 龚 军2 李增印2 彭 易1.高地应力软岩隧道双层初期支护围岩变形特征[J]. 现代隧道技术, 2024,61(3): 85-95
[8] 杨赵峰1 汪 波2 杜永全1 黄长宽1 樊 勇1.主动支护技术在海东隧洞软岩大变形中的应用[J]. 现代隧道技术, 2024,61(3): 245-252
[9] 常伟学1,2 梁庆国1 李奇伟1 樊纯坛1,3 魏 健4.富水千枚岩隧道大变形特征及控制措施研究[J]. 现代隧道技术, 2024,61(3): 236-244
[10] 赵海松 魏安辉 邵 江 向 波 邬 凯 李世琦 周仁强 柳 松.浅埋顺层偏压洞口边坡失稳机制及防治研究[J]. 现代隧道技术, 2024,61(3): 253-265
[11] 魏传文1 王相龙1 杨旭旭2 赵玉棣1 邵 行3 满新杰1张长安3 周洋洋1 张作顺2.薄层状岩体隧道冒顶机制及支护方案优化研究[J]. 现代隧道技术, 2024,61(1): 252-259
[12] 袁传保 1 鲁金林 1 陶玉敬 1 宋 章 1 刘国强 2.复杂强震山区跃龙门隧道重大工程地质问题研究[J]. 现代隧道技术, 2023,60(4): 188-195
[13] 陶玉敬 1 袁传保 1 王茂靖 1 宋 章 1 刘国强 2.成兰铁路跃龙门隧道深埋越岭段大变形原因分析研究[J]. 现代隧道技术, 2023,60(4): 229-236
[14] 刘国强.跃龙门隧道软岩大变形两台阶快速成环法施工技术研究[J]. 现代隧道技术, 2023,60(3): 252-258
[15] 徐 宏 1 叶 飞 2 刘 奇 1 田黎明 1 安 欢 1.大断面矩形顶管施工地层变形及顶进参数控制研究[J]. 现代隧道技术, 2022,59(6): 97-105
Copyright 2010 by 现代隧道技术