现代隧道技术 2022, Vol. 59 Issue (5) :237-245    DOI:
规划设计与施工 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
高地应力下顺层偏压隧道开挖变形控制技术研究
(1.中铁十七局集团第四工程有限公司,重庆 401121;2.中南大学土木工程学院,长沙 410075; 3.高速铁路建造技术国家工程研究中心,长沙 410075)
Study on Deformation Control Technology for Unsymmetrically Loaded Tunnels in Bedding Strata under High Geo-stress
(1. China Railway 17th Bureau Group Fourth Engineering Co. Ltd., Chongqing 401121; 2. School of Civil Engineering, Central South University, Changsha 410075; 3. National Engineering Research Center for High-speed Railway Construction Technology,Changsha 410075)
Download: PDF (3841KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  中老昆万铁路甘庄隧道在施工过程中出现高地应力顺层偏压大变形,引起了隧道初期支护开裂、掉块、侵限等问题。针对甘庄隧道大变形问题,基于三台阶开挖法,提出变种短台阶施工控制技术,并采用块体离散元软件3DEC开展不同台阶高度和长度下隧道开挖数值模拟。结果表明,台阶参数对顺层偏压隧道变形影响显著,中台阶高度从4 m减小至2 m,隧道变形收敛急剧减小;当中台阶长度小于15 m时,增大中台阶长度,隧道变形收敛 逐渐减小,当中台阶长度大于15 m,隧道变形收敛趋于稳定,变形收敛稳定在21 cm左右。对于甘庄隧道顺层偏压段中台阶高度应设置在2 m左右,长度应控制在15 m以上,现场监测数据表明该施工控制技术在甘庄隧道取得了良好的变形控制效果。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
于国亮 1 娄义黎 2
3 吴国鹏 1 施成华 2
3 郑可跃 2
3
关键词顺层偏压   大变形   开挖工法   3DEC   控制技术     
Abstract: During the construction of Ganzhuang Tunnel on the China/Kunming-Laos/Vientiane Railway, large de? formation occurred due to high geo-stress and unsymmetrical load in bedding strata, which resulted in the cracking of tunnel primary support, block dropping and clearance invasion. Aiming at the large deformation of Ganzhuang tunnel, based on the three bench excavation method, a modified short bench construction control technology is proposed, and the block discrete element software 3DEC is used to carry out numerical simulation of tunnel excavation under different bench heights and lengths. The results show that the bench parameters have a significant effect on the deformation of the unsymmetrically loaded tunnel in bedding strata. When the height of the middle bench decreases from 4 m to 2 m, the tunnel deformation convergence decreases rapidly; When the length of the middle bench is less than 15 m, the deformation convergence of the tunnel decreases gradually with the increase of the length of the middle bench. When the middle bench length is greater than 15 m, the tunnel deformation convergence tends to be stable, and the tunnel deformation convergence is about 21 cm. The height of the middle bench in the bedding unsymmetrical loading section of Ganzhuang tunnel should be set at about 2 m, and the length of the middle bench should be controlled at more than 15 m. Field monitoring data show that this construction control technology has achieved good deformation control effect in Ganzhuang tunnel.
KeywordsUnsymmetrical load in bedding strata,   Large deformation,   Excavation method,   3DEC ,   Control technology     
基金资助:国家自然科学基金资助项目(5217082631)
作者简介: 于国亮(1982-),男,工程师,主要从事铁路工程建设技术管理工作,E-mail: 47129260@qq.com. 通讯作者:娄义黎(1994-),男,博士研究生,主要从事超大埋深复杂地质环境隧道建造理论研究,E-mail: louyilicsu99@163.com.
引用本文:   
于国亮 1 娄义黎 2, 3 吴国鹏 1 施成华 2, 3 郑可跃 2等 .高地应力下顺层偏压隧道开挖变形控制技术研究[J]  现代隧道技术, 2022,V59(5): 237-245
YU Guoliang1 LOU Yili2, 3 WU Guopeng1 SHI Chenghua2, 3 ZHENG Keyue2 etc .Study on Deformation Control Technology for Unsymmetrically Loaded Tunnels in Bedding Strata under High Geo-stress[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(5): 237-245
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I5/237
 
没有本文参考文献
[1] 徐 宏 1 叶 飞 2 刘 奇 1 田黎明 1 安 欢 1.大断面矩形顶管施工地层变形及顶进参数控制研究[J]. 现代隧道技术, 2022,59(6): 97-105
[2] 王亚琼 1, 2 杨 强 1, 2 潘红伟 3 高启栋 1, 2 张士朝 1, 2 王志丰 1, 2.基于3DEC模拟的高地应力水平层状隧道围岩变形破坏特征分析[J]. 现代隧道技术, 2022,59(4): 127-136
[3] 崔光耀 1 魏杭杭 1 王明胜 2.高地应力强风化炭质板岩隧道大变形控制现场试验研究[J]. 现代隧道技术, 2022,59(3): 183-189
[4] 马 建.盾构隧道穿越对既有管线影响的研究与展望[J]. 现代隧道技术, 2022,59(3): 23-30
[5] 何乐平 1 徐应东 1 胡启军 1 蔡其杰 2.基于博弈论-云模型的软岩隧道大变形风险评估[J]. 现代隧道技术, 2021,58(6): 85-94
[6] 何理礼.FLAC3D中锚杆拉剪断裂的实现与应用[J]. 现代隧道技术, 2021,58(3): 60-69
[7] 王建宇.对形变压力的认识——隧道围岩挤压性变形问题探讨[J]. 现代隧道技术, 2020,57(4): 1-11
[8] 代 聪 1,3 何 川 2,3 刘川昆 2,3 郭文琦 2,3.开挖工法对高地应力场软岩隧道围岩稳定性影响的模型试验研究[J]. 现代隧道技术, 2020,57(4): 141-149
[9] 赵 伟 1,2 雷升祥 1,2,3 肖清华 1,2 刘纪峰 4 陈桥枫 1,2.基于结构特征曲线的软岩隧道钢拱架力学效应研究[J]. 现代隧道技术, 2020,57(2): 96-103
[10] 马时强 1,2.软岩大变形条件下围岩变形与围岩压力的关系研究[J]. 现代隧道技术, 2020,57(1): 44-50
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 刘建国 徐添华 宋程鹏.滨海软土层新建地铁盾构隧道近距离上跨既有地铁隧道修建技术[J]. 现代隧道技术, 2019,56(4): 160-167
[13] 徐福田.可调节配重顶进技术在箱涵上穿地铁隧道施工中的应用[J]. 现代隧道技术, 2019,56(4): 182-187
[14] 杨木高.木寨岭隧道大变形控制技术[J]. 现代隧道技术, 2019,56(2): 175-181
[15] 汪波1, 郭新新1, 何川1, 吴德兴2.当前我国高地应力隧道支护技术特点及发展趋势浅析[J]. 现代隧道技术, 2018,55(5): 1-10