现代隧道技术 2022, Vol. 59 Issue (6) :177-186    DOI:
规划设计与施工 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
高压富水深竖井工作面预注浆关键技术参数研究及应用
(1.中国国家铁路集团有限公司工程管理中心,北京 100844;2.中铁隧道局集团有限公司,广州 511457;3.中铁二院工程集团有限责任公司,成都 610031)
Study and Application of Key Technical Parameters of Pre-grouting in High-pressure Water-rich Deep Shaft Face
(1. Engineering Management Center of China State Railway Group Co., Ltd., Beijing 100844; 2. China Railway Tunnel Group Co., Ltd.,Guangzhou 511457; 3. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031)
Download: PDF (2472KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 高黎贡山隧道竖井施工中,超前地质探孔单孔最大涌水量为126.9 m3/h,对工作面采用预注浆技术进行注浆加固和堵水处理,其中主井工作面预注浆实施12个循环,副井工作面预注浆实施11个循环。应用结果表明:(1)采用工作面预注浆法可以有效解决高压富水深竖井注浆加固及堵水技术难题,能够保证竖井安全正常施工;(2)采用10 m3/h作为竖井正常施工涌水量控制基准值是合适的,当工作面涌水量≥10 m3/h时应采取注浆堵水措施;(3)竖井开挖前超前探孔单孔涌水量宜采用1.4 L/ (min·m)作为控制基准值。当超前探孔循环长度为60 m时,基准值为5.0 m3/h;(4)竖井工作面预注浆施工,检查孔涌水量宜采用1.0 L/ (min·m)作为控制基准值。当注浆循环长度为60 m时,基准值为3.6 m3/h;(5)综合检查孔涌水量、注浆堵水率、竖井开挖时涌水量,以及综合成井效率等因素,竖井工作面预注浆时宜采用60 m作为一个循环注浆段落长度。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张民庆 1 辛维克 1 贾大鹏 1 司景钊 2 王唤龙 3
关键词铁路隧道   深竖井   高压富水   工作面预注浆   关键技术参数     
Abstract: In the shaft construction of the Gaoligongshan Tunnel, the maximum water inrush of a single advanced geologic exploration borehole is 126.9 m3/h, and the pre-grouting technology is used on the faces for grouting reinforcement and water blocking. A total of 12 pre-grouting cycles were conducted for the main shaft face and 11 pregrouting cycles were conducted for the auxiliary shaft face. The results of application show that (1) the face pregrouting method is employed to effectively solve the difficulties in grouting reinforcement and water blocking technologies for high-pressure water-rich deep shafts and ensure safe and normal construction of shafts; (2) it is appropriate to use 10 m3/h as the reference value of water inrush control during the normal construction of shafts. When the face water inrush is equal to or greater than 10 m3/h, grouting and water blocking measures shall be taken; (3) before the excavation of shafts, it is better to use 1.4 L/(min·m) as the reference value of water inrush control of a single advanced exploration borehole. When the length of an advanced exploration borehole cycle is 60 m, the reference value is 5.0 m3/h; (4) for the pre-grouting in the shaft face, it is better to use 1.0 L/(min·m) as the reference value of water inrush control of an inspection hole. When the length of a grouting cycle is 60 m, the reference value is 3.6 m3/h;(5) based on the water inrush of an inspection hole, grouting and water blocking rate, water inrush of a shaft during excavation, and efficiency of well completion, 60 m should be used as the length of a cyclic grouting section when pre-grouting is conducted in the shaft face.
KeywordsRailway tunnel,   Deep shaft,   High pressure and abundant water,   Face pre-grouting,   Key technical pa? rameters     
基金资助:中国国家铁路集团有限公司科技研究开发计划课题(P2019G055).
作者简介: 张民庆(1970-),男,正高级工程师,主要从事隧道及地下工程科研、施工及管理方面的工作,E-mail: zskzmq888@163.com。
引用本文:   
张民庆 1 辛维克 1 贾大鹏 1 司景钊 2 王唤龙 3 .高压富水深竖井工作面预注浆关键技术参数研究及应用[J]  现代隧道技术, 2022,V59(6): 177-186
ZHANG Minqing1 XIN Weike1 JIA Dapeng1 SI Jingzhao2 WANG Huanlong3 .Study and Application of Key Technical Parameters of Pre-grouting in High-pressure Water-rich Deep Shaft Face[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 177-186
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I6/177
 
没有本文参考文献
[1] 段 炼 1 李永恒 2 伍江航 1.硫酸盐环境大面积腐蚀隧道衬砌结构稳定性评价[J]. 现代隧道技术, 2022,59(5): 212-220
[2] 周晓军 1 宁远思 2 杨昌宇 3.矿山法施工双线铁路隧道二次衬砌拱部预制拼装结构的设计与工程应用[J]. 现代隧道技术, 2022,59(4): 204-217
[3] 李伟林 1 章 光 1 朱应伟 1 胡少华 1,2.不同分岔角的卜型隧道施工通风三维数值模拟研究[J]. 现代隧道技术, 2022,59(4): 158-166
[4] 王明年 1,2 郭晓晗 1,2 倪光斌 3 于 丽 1,2 李春荟 1,2.高海拔铁路隧道火灾烟气CO浓度控制标准讨论[J]. 现代隧道技术, 2022,59(3): 40-45
[5] 姚 捷 1,2.高速铁路隧道内列车运行时气动荷载影响因素分析[J]. 现代隧道技术, 2022,59(3): 166-171
[6] 王明年 1,2 杨恒洪 1,2 张艺腾 1,2 刘轲瑞 1,2 于 丽 1,2.水平小净距隧道中夹岩安全系数法研究与应用[J]. 现代隧道技术, 2022,59(2): 11-19
[7] 陈国栋 1 甘目飞 2 刘 科 2.铁路隧道钻爆法机械化修建设计关键技术[J]. 现代隧道技术, 2022,59(2): 200-209
[8] 张 鹏 1 王立川 2,3 李林毅 3 姚 勇 1 张学民 3 郑 波 4 刘茂兵 5.高强度岩溶水致铁路隧道衬砌破损的处治理念与实践[J]. 现代隧道技术, 2022,59(2): 227-241
[9] 袁 伟 1 路军富 2 刘金松 1 吴俊猛 1.复杂地应力红层泥岩隧道持续底鼓原因分析[J]. 现代隧道技术, 2022,59(2): 242-250
[10] 孙 意.成贵铁路四川红层段瓦斯特征分析及勘察阶段划分隧道瓦斯工区类别的建议[J]. 现代隧道技术, 2022,59(1): 195-199
[11] 王 飞.深厚砂卵石地层超深竖井施工降水模型试验研究[J]. 现代隧道技术, 2022,59(1): 176-182
[12] 丁 智 1, 2 冯丛烈 1,2 仇 硕 1 陆 钊 3 范俊聪 4.双线不同盾构机掘进地表变形及施工参数影响分析[J]. 现代隧道技术, 2022,59(1): 183-194
[13] 唐浪洲 1,2 于 丽 1,2 王玉锁 1,2 汪主洪 1,2 王明年 1,2.走滑断层错动量大小对铁路隧道结构安全性影响的数值分析[J]. 现代隧道技术, 2022,59(1): 214-224
[14] 张民庆 1 贾大鹏 1 王水善 2 高存成 3.铁路隧道衬砌施工自动浇筑振捣新技术[J]. 现代隧道技术, 2022,59(1): 29-34
[15] 陈绍华.秦岭马白山隧道新型紧急救援站结构型式研究[J]. 现代隧道技术, 2022,59(1): 35-41
Copyright 2010 by 现代隧道技术