高压富水深竖井工作面预注浆关键技术参数研究及应用
(1.中国国家铁路集团有限公司工程管理中心,北京 100844;2.中铁隧道局集团有限公司,广州 511457;3.中铁二院工程集团有限责任公司,成都 610031)
Study and Application of Key Technical Parameters of Pre-grouting in High-pressure Water-rich Deep Shaft Face
(1. Engineering Management Center of China State Railway Group Co., Ltd., Beijing 100844; 2. China Railway Tunnel Group Co., Ltd.,Guangzhou 511457; 3. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610031)
Download: PDF (2472KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 高黎贡山隧道竖井施工中,超前地质探孔单孔最大涌水量为126.9 m3/h,对工作面采用预注浆技术进行注浆加固和堵水处理,其中主井工作面预注浆实施12个循环,副井工作面预注浆实施11个循环。应用结果表明:(1)采用工作面预注浆法可以有效解决高压富水深竖井注浆加固及堵水技术难题,能够保证竖井安全正常施工;(2)采用10 m3/h作为竖井正常施工涌水量控制基准值是合适的,当工作面涌水量≥10 m3/h时应采取注浆堵水措施;(3)竖井开挖前超前探孔单孔涌水量宜采用1.4 L/ (min·m)作为控制基准值。当超前探孔循环长度为60 m时,基准值为5.0 m3/h;(4)竖井工作面预注浆施工,检查孔涌水量宜采用1.0 L/ (min·m)作为控制基准值。当注浆循环长度为60 m时,基准值为3.6 m3/h;(5)综合检查孔涌水量、注浆堵水率、竖井开挖时涌水量,以及综合成井效率等因素,竖井工作面预注浆时宜采用60 m作为一个循环注浆段落长度。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张民庆 1 辛维克 1 贾大鹏 1 司景钊 2 王唤龙 3
关键词铁路隧道   深竖井   高压富水   工作面预注浆   关键技术参数     
Abstract: In the shaft construction of the Gaoligongshan Tunnel, the maximum water inrush of a single advanced geologic exploration borehole is 126.9 m3/h, and the pre-grouting technology is used on the faces for grouting reinforcement and water blocking. A total of 12 pre-grouting cycles were conducted for the main shaft face and 11 pregrouting cycles were conducted for the auxiliary shaft face. The results of application show that (1) the face pregrouting method is employed to effectively solve the difficulties in grouting reinforcement and water blocking technologies for high-pressure water-rich deep shafts and ensure safe and normal construction of shafts; (2) it is appropriate to use 10 m3/h as the reference value of water inrush control during the normal construction of shafts. When the face water inrush is equal to or greater than 10 m3/h, grouting and water blocking measures shall be taken; (3) before the excavation of shafts, it is better to use 1.4 L/(min·m) as the reference value of water inrush control of a single advanced exploration borehole. When the length of an advanced exploration borehole cycle is 60 m, the reference value is 5.0 m3/h; (4) for the pre-grouting in the shaft face, it is better to use 1.0 L/(min·m) as the reference value of water inrush control of an inspection hole. When the length of a grouting cycle is 60 m, the reference value is 3.6 m3/h;(5) based on the water inrush of an inspection hole, grouting and water blocking rate, water inrush of a shaft during excavation, and efficiency of well completion, 60 m should be used as the length of a cyclic grouting section when pre-grouting is conducted in the shaft face.
KeywordsRailway tunnel,   Deep shaft,   High pressure and abundant water,   Face pre-grouting,   Key technical pa? rameters     
基金资助:中国国家铁路集团有限公司科技研究开发计划课题(P2019G055).
作者简介: 张民庆(1970-),男,正高级工程师,主要从事隧道及地下工程科研、施工及管理方面的工作,E-mail: zskzmq888@163.com。
引用本文:   
张民庆 1 辛维克 1 贾大鹏 1 司景钊 2 王唤龙 3 .高压富水深竖井工作面预注浆关键技术参数研究及应用[J]  现代隧道技术, 2022,V59(6): 177-186
ZHANG Minqing1 XIN Weike1 JIA Dapeng1 SI Jingzhao2 WANG Huanlong3 .Study and Application of Key Technical Parameters of Pre-grouting in High-pressure Water-rich Deep Shaft Face[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(6): 177-186
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I6/177
 
没有本文参考文献
[1] 张 欢1,2 张世殊3 李天斌1,2 杨 罡1,2 李世森1,2 肖华波3 陈卫东3.基于GAPSO-LightGBM的TBM施工隧道围岩等级智能预测方法[J]. 现代隧道技术, 2025,62(2): 98-109
[2] 匡 亮1 粟 威1 陶伟明1 田四明2 申玉生3 黎 旭2 汪辉武1.跨走滑断层隧道结构影响分区及设防范围研究[J]. 现代隧道技术, 2024,61(6): 45-54
[3] 魏荣华1,2 张康健1,2 张志强1,2.铁路隧道深埋水沟防排水技术参数优化研究[J]. 现代隧道技术, 2024,61(5): 183-192
[4] 宋越鹏1 范晓锋2 梁 禹2,3,4 彭红国5 张晗炜5.城际铁路隧道深大圆形竖井开挖阶段变形监测分析[J]. 现代隧道技术, 2024,61(5): 219-226
[5] 周晓军.基于横断面几何参数的高速铁路隧道预制拼装二次衬砌分块设计方法[J]. 现代隧道技术, 2024,61(4): 232-243
[6] 高树全1,2,3 蒋良文1,2,3 牟元存1,2,3 李 星1,2,3 王树栋1,2.西南复杂艰险山区铁路隧道超前地质预报技术[J]. 现代隧道技术, 2024,61(2): 52-59
[7] 王明年1,2 邓 涛3 于 丽1,2.中国交通隧道运营及防灾通风技术发展与展望[J]. 现代隧道技术, 2024,61(2): 152-166
[8] 曾弘锐1,2 孙文昊3 何 卫3 郭亚林1,2 郭 春1,2.基于机器学习的铁路隧道施工碳排放预测模型研究[J]. 现代隧道技术, 2023,60(6): 29-39
[9] 朱星宇 刘 征 张志强 冯 应.铁路隧道结构设计参数对二次衬砌裂缝影响规律研究[J]. 现代隧道技术, 2023,60(5): 1-10
[10] 陈 伟1,2 张明红2 张 莹2 林 玲2.中老铁路某隧道盐岩工程地质特征研究[J]. 现代隧道技术, 2023,60(5): 234-242
[11] 朵生君.铁路隧道TBM长距离施工通风技术研究[J]. 现代隧道技术, 2023,60(4): 222-228
[12] 赵万强 1 路军富 2 汤 印 1 郑长青 1.铁路隧道底鼓风险等级划分方法及控制措施研究[J]. 现代隧道技术, 2023,60(4): 178-187
[13] 陈锡武 1 卿伟宸 1 刘国强 2.高地应力断层带超大断面隧道施工设计[J]. 现代隧道技术, 2023,60(4): 204-212
[14] 袁传保 1 鲁金林 1 陶玉敬 1 宋 章 1 刘国强 2.复杂强震山区跃龙门隧道重大工程地质问题研究[J]. 现代隧道技术, 2023,60(4): 188-195
[15] 袁红运 1,2 陈礼伟 2 刘志强 2.单线铁路隧道衬砌纵向裂缝病害综合评价方法[J]. 现代隧道技术, 2023,60(3): 208-216
Copyright 2010 by 现代隧道技术