复杂环境高铁咽喉区隧道下穿机场段结构设计研究
(1.中铁第一勘察设计院集团有限公司,西安 710043;2.陕西省铁道及地下交通工程重点实验室(中铁一院),西安 710043)
Study on the Structural Design for Tunnels Undercrossing Airport Section in High-speed Railway Throat Area under a Complex Environment
(1. China Railway First Survey and Design Institute Group Co., Ltd., Xi'an 710043; 2. Shaanxi Railway and Underground Traffic Engineering Key Laboratory(China Railway First Survey and Design Institute), Xi'an 710043)
Download: PDF (4003KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为确保复杂环境下高铁咽喉区隧道下穿机场航站楼段结构安全,依托津潍高铁济南联络线下穿GTC、遥墙国际机场T2航站楼工程,对隧道结构形式、结构受力、桩基础布置、沉降变形控制及构造加强措施等进行研究,提出直墙平顶圆拱结构形式、大跨直墙拉杆拱结构形式、桩基础均匀布置形式以及整体纵横向暗梁局部加强环梁的构造措施,并对各结构形式进行分析。结果表明:下穿段隧道采用直墙平顶圆拱结构形式、大跨直墙拉杆拱结构形式可满足受力要求;复杂断面隧道结构二维计算结果与三维结果偏差仅为14%,设计时可根据二维计算结果进行配筋,根据三维计算结果进行校核;桩基础均匀布置方案更利于控制隧道结构变形沉降,设置纵横向暗梁的措施能够增加隧道结构刚度及稳定性。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
宋 艺 1
2
关键词高铁隧道   下穿机场   结构设计   变形控制   桩基布置   纵横向暗梁     
Abstract: The purpose of this paper is to determine the structural design method for tunnels undercrossing the air? port terminal section in high-speed railway throat area under a complex environment. Based on the tunnel project undercrossing the GTC and the T2 terminal of the Yaoqiang International Airport, which is on the Jinan connection line of the Tianjin-Weifang High Speed Railway, the structural form, structural stress, pile foundation layout, tunnel settlement and deformation control and structural strengthening measures for the tunnel are studied, so as to propose the straight wall, flat top and circular arch structure form, the long-span straight wall tie-arch structure form, the uniform layout pattern of pile foundation and the structural measures of the overall vertical and horizontal hidden beams plus locally reinforced ring beams, and to analyze the above-mentioned structural forms. The results show that the use of straight wall, flat top and circular arch structure and the large span straight wall tie-arch structure in the undercrossing tunnel can meet the load-bearing requirements. The deviation between the two-dimensional calculation result of complex cross-section tunnel structures and the three-dimensional calculation result is only 14%. During design, reinforcement can be made based on the two-dimensional calculation result and verified based on the three-dimensional calculation result. The uniform layout scheme of pile foundation is more beneficial to controlling deformation and settlement of the tunnel structure, and the measures of setting vertical and horizontal hidden beams can improve rigidity and stability of the tunnel structure.
KeywordsUndercrossing airport,   High-speed railway tunnel,   Structural design,   Settlement deformation,   Pile foun? dation layout,   Vertical and horizontal hidden beams     
作者简介: 宋 艺(1989-),男,硕士,高级工程师,主要从事高铁隧道、城际铁路隧道、城市轨道交通地下工程勘察及设计方面的工作及研究, E-mail:281077865@qq.com.
引用本文:   
宋 艺 1, 2 .复杂环境高铁咽喉区隧道下穿机场段结构设计研究[J]  现代隧道技术, 2023,V60(4): 213-221
SONG Yi1, 2 .Study on the Structural Design for Tunnels Undercrossing Airport Section in High-speed Railway Throat Area under a Complex Environment[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(4): 213-221
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I4/213
 
没有本文参考文献
[1] 魏力峰 1 田 扬 1 朱牧原 1 邹坤秘 2 方 勇 1.大直径双模盾构浅覆土无障碍始发变形控制研究[J]. 现代隧道技术, 2023,60(2): 149-158
[2] 杨振华.浅覆土接收盾构隧道环间压力分布规律研究[J]. 现代隧道技术, 2022,59(5): 18-26
[3] 周晓军 1 宁远思 2 杨昌宇 3.矿山法施工双线铁路隧道二次衬砌拱部预制拼装结构的设计与工程应用[J]. 现代隧道技术, 2022,59(4): 204-217
[4] 陈文尹.高铁隧道底部大型溶洞先通过后处治技术研究[J]. 现代隧道技术, 2022,59(4): 248-255
[5] 刘 凯 1 吴再新 2 杨吉忠 3 关皓瑜 4,5.飞机降落冲击荷载作用下高铁隧道动力响应及疲劳损伤研究[J]. 现代隧道技术, 2022,59(2): 96-102
[6] 唐晓松 1,2 郑颖人 3 王永甫 1.有限元强度折减法在隧道施工稳定分析与控制中的应用[J]. 现代隧道技术, 2020,57(3): 49-55
[7] 张金龙 1 苟长飞 2 叶 飞 3.大断面跨海盾构隧道结构设计与参数分析[J]. 现代隧道技术, 2020,57(2): 61-67
[8] 季 昌 1 王 力 2.软土地区盾构穿越待改建老旧大堤的变形控制研究[J]. 现代隧道技术, 2019,56(3): 108-117
[9] 杨木高.木寨岭隧道大变形控制技术[J]. 现代隧道技术, 2019,56(2): 175-181
[10] 张姣龙1 柳献1 袁勇1 Herbert MANG1, 2.考虑接头真实性能的盾构隧道衬砌结构计算模型与混合分析方法[J]. 现代隧道技术, 2018,55(5): 72-78
[11] 孙连勇 黄永亮 王启民 周浩 代长顺.地铁盾构隧道下穿既有铁路变形控制研究[J]. 现代隧道技术, 2018,55(5): 140-145
[12] 李春辉 李洪洲 吴 勇 李荣华.基于GIS的隧道坍塌救援管理系统的设计与开发[J]. 现代隧道技术, 2018,55(4): 59-63
[13] 魏 纲 1 邢建见 2 苏勤卫 3 陆世杰 2.临时垫块支撑对沉管隧道结构受力影响的研究[J]. 现代隧道技术, 2018,55(4): 139-145
[14] 张传庆 1,2 张 洋 3 周 辉 1,2 杨凡杰 1,2 刘 宁 3.深埋软岩隧洞围岩变形控制方法[J]. 现代隧道技术, 2018,55(2): 28-35
[15] 刘应亮.大直径曲线管幕顶进过程中地层变形控制及监测[J]. 现代隧道技术, 2017,54(6): 210-216
Copyright 2010 by 现代隧道技术