[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2023, Vol. 60 Issue (5) :67-77    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
特大直径双层公路盾构隧道管片-内部结构复合体系横向抗震性能研究
(1.中铁第四勘察设计院集团有限公司,武汉 430063;2.水下隧道技术湖北省工程实验室,武汉 430063; 3.西南交通大学交通隧道工程教育部重点实验室,成都 610031)
Research on Transverse Seismic Resistance of Compound System of Segments and Internal Structure of a Super-large Diameter Double-layer Highway Shield Tunnel
(1. China Railway Siyuan Survey and Design Group Co., Ltd., Wuhan 430063; 2. Hubei Provincial Engineering Laboratory for Underwater Tunnel Technology, Wuhan 430063; 3. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education,Southwest Jiaotong University, Chengdu 610031)
Download: PDF (5989KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究双层公路盾构隧道内部结构对隧道横向抗震性能的影响,以某特大直径双层公路隧道工程为依托,建立施作上层板和不施作上层板2种不同内部结构的双层公路盾构隧道三维精细化有限元模型,采用隐式动力时程法进行盾构隧道管片-内部结构复合体系横向抗震性能研究。结果表明:(1)双层公路隧道内部结构可以增大隧道横向刚度,减小隧道变形,施作上层板的内部结构对横向刚度的增大更为显著;(2)内部结构可以减小隧道局部峰值弯矩和峰值轴力,其中拱脚处轴力最大减小732.16 kN,拱肩、拱脚和拱腰处弯矩最大减小723.59 kN·m;(3)内部结构施作上层板时,管片损伤小幅减小,内部结构损伤增大,不施作上层板时,拱腰处管片外侧出现新损伤,考虑到内部结构并非主要受力结构,施作上层板隧道的震后可修复性优于不施作上层板隧道的震后可修复性;(4)内部结构施作上层板在减小隧道变形、应力和内力方面均优于不施作上层板,但施作上层板后内部结构损伤增大,建议采取对应的加强措施。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
薛光桥1
2 肖明清1
2 封 坤3 王少锋1
2 薛皓匀3 郭文琦3
关键词盾构隧道   管片衬砌   双层内部结构   横向抗震   数值模拟     
Abstract: To study the influence of the internal structure of a double-layer highway shield tunnel on the transverse seismic resistance of the tunnel, the three-dimensional refined finite element models of the double-layer highway shield tunnels with and without an upper layer plate applied are established based on a super-large diameter doublelayer highway tunnel project. The implicit dynamic time history method is used to study the transverse seismic resistance of the compound system of segments and internal structure of the shield tunnel. The results show that: (1) the internal structure of a double-layer highway tunnel can increase the transverse stiffness of the tunnel, reduce tunnel deformation, and the internal structure with the upper layer plate applied can cause a more significant increase in transverse stiffness; (2) The internal structure can reduce the local peak bending moment and the peak axial force of the tunnel, with the axial force reduced by 732.16 kN (max.) at the arch foot and with the bending moment reduced by 723.59 kN·m (max.) at the spandrel, arch foot and hance; (3) When the upper layer plate is applied in the internal structure, the damage to the segment decreases slightly, while the damage to the internal structure increases. When the upper layer plate is not applied, new damage appears on the outer side of the segment at the hance. Considering that the internal structure is not the main load-bearing structure, the post-earthquake repairability of the tunnel with the upper layer plate is better than that of the tunnel without the upper layer plate; (4) The application of the upper layer plate in the internal structure is superior to the internal structure without the upper layer plate in reducing deformation, stress and internal force of the tunnel. However, the damage to the internal structure increases after the application of the upper layer plate. It is recommended to take corresponding strengthening measures.
KeywordsShield tunnel,   Segment lining,   Double-layer internal structure,   Transverse seismic resistance,   Numeri? cal simulation     
基金资助:国家重点研发计划项目(2022YFC3800900);国家自然科学基金项目(52078430).
作者简介: 薛光桥(1979-),男,硕士,正高级工程师,主要从事水下隧道及高速铁路隧道设计方面的研究工作,E-mail:003838@crfsdi.com. 通讯作者:封 坤(1983-),男,博士,教授,主要从事盾构设计技术与结构设计理论研究及教学工作,E-mail:windfeng813@163.com.
引用本文:   
薛光桥1, 2 肖明清1, 2 封 坤3 王少锋1等 .特大直径双层公路盾构隧道管片-内部结构复合体系横向抗震性能研究[J]  现代隧道技术, 2023,V60(5): 67-77
XUE Guangqiao1, 2 XIAO Mingqing1, 2 FENG Kun3 WANG Shaofeng1 etc .Research on Transverse Seismic Resistance of Compound System of Segments and Internal Structure of a Super-large Diameter Double-layer Highway Shield Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(5): 67-77
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I5/67
 
没有本文参考文献
[1] 于建新 刘文金 王金星 刘焕春 周志彬.层状岩体隧道爆破对支护体系的振动影响研究[J]. 现代隧道技术, 2023,60(5): 99-110
[2] 苗回归1 黄 飞1,2 李树清1,2 罗亚飞1,2 苗德华1 焦杨洋1.基于数值模拟-多元线性回归的大断面隧道平均瓦斯浓度检测位置研究[J]. 现代隧道技术, 2023,60(5): 128-135
[3] 马亚丽娜1, 2 陈雅琪1, 2 刘继国1, 2 崔 臻3 周光新4.跨走滑断层铰接式隧洞衬砌错断破坏机制研究[J]. 现代隧道技术, 2023,60(5): 136-147
[4] 陈 龙 封 坤 吴柏翰 郭付康 王 维.大埋深盾构隧道结构受力现场实测分析[J]. 现代隧道技术, 2023,60(5): 148-157
[5] 周 舟1 钟长平2 谢文达1.泥岩地层盾构常压开舱对既有隧道结构变形的影响研究[J]. 现代隧道技术, 2023,60(5): 205-212
[6] 胡威东1,2.超大直径泥水盾构隧道施工通风设计方案研究[J]. 现代隧道技术, 2023,60(5): 186-194
[7] 郭英杰1,2 丁文其1,2 李晓冉1,2 马 畅1,2 张清照1,2.新型不锈钢波纹板抗弯力学特性试验与数值分析[J]. 现代隧道技术, 2023,60(5): 262-268
[8] 范文昊 1,2 谢盛昊 1,2 周飞聪 1,2 王志杰 1,2 张 凯 3 骆云建 3.新建双线盾构隧道下穿既有隧道近接影响分区及控制措施案例研究[J]. 现代隧道技术, 2023,60(4): 43-57
[9] 肖明清 1,2 唐宇恒 3 陈俊伟 1,2 张超勇 3,4.盾构隧道管片接缝气体泄漏模型及影响因素分析[J]. 现代隧道技术, 2023,60(4): 6-13
[10] 吴 刚 1 罗 炜 2,3 王小龙 1 朱晶晶 1 贾 非 2,3 薛亚东 2,3.基于深度学习的盾构隧道衬砌表观病害检测模型研究[J]. 现代隧道技术, 2023,60(4): 67-75
[11] 漆美霖 封 坤 郭文琦 鲁选一 何 川.螺栓失效对盾构隧道管片纵缝接头抗弯性能的影响研究[J]. 现代隧道技术, 2023,60(4): 128-137
[12] 闫鹏飞 蔡永昌 周 龙.基于深层神经网络的管片接头刚度非线性模型及应用[J]. 现代隧道技术, 2023,60(3): 24-33
[13] 王立川 1,2 付柏毅 2 章慧健 2 冀国栋 1 耿 麒 3 王铮铮 4 王灿林 5 王 锋 6.TBM滚刀切削花岗岩和灰岩的力学响应差异[J]. 现代隧道技术, 2023,60(3): 81-89
[14] 钱 源 1 徐 冲 2 刘晓瑞 2 黄 猛 3.荷载与锈胀双重力学作用下海底盾构隧道管片开裂机理研究[J]. 现代隧道技术, 2023,60(3): 102-111
[15] 胡振宇 1 封 坤 1 郭文琦 1 彭长胜 2 李姣阳 2.内部结构不同施作时机对特大断面盾构隧道管片衬砌受力的影响研究[J]. 现代隧道技术, 2023,60(3): 90-101
Copyright 2010 by 现代隧道技术