Construction Techniques for the Extra-Long West Qinling Tunnel Passing Through an F6  Fault and Fractured Zone
Lanzhou-Chongqing Railway Limited Liability Company
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The construction of the West Qinling extra-long railway tunnel was very difficult since the geological structure of the surrounding rock is complex, the fault is developed, and it is located in a zone under high ground stress. Stable excavation was achieved during the construction passing through the fault and fracture zone thanks to advance geological forecasting, monitoring and measuring, pre-support with small pipes, curtain grouting, and three-bench blasting, all of which prevented any collapsing.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: The construction of the West Qinling extra-long railway tunnel was very difficult since the geological structure of the surrounding rock is complex, the fault is developed, and it is located in a zone under high ground stress. Stable excavation was achieved during the construction passing through the fault and fracture zone thanks to advance geological forecasting, monitoring and measuring, pre-support with small pipes, curtain grouting, and three-bench blasting, all of which prevented any collapsing.
Keywords:   
Cite this article:   
.Construction Techniques for the Extra-Long West Qinling Tunnel Passing Through an F6  Fault and Fractured Zone[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(4): 99-103
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I4/99
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] HAN Yuxuan1 LENG Xiqiao2,3 YAN Jinxiu4 ZHANG Rui5.Construction Technology for the Shaft of Extra-long Micangshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 133-138
[3] KONG Qingxiang ZHAI Renfeng.Some Issues Concerning Construction of High Speed Railway Tunnels and Corresponding Countermeasures:A Case Study of Beitaizi Tunnel on the Beijing-Shengyang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 166-171
[4] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[5] ZHOU Baosheng.Optimized CRD Construction Techniques for a Super-Shallow Bored Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 186-190
[6] AN Yonglin1 OUYANG Pengbo1 PENG Limin2 WU Bo3 HU Wenxuan1.Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 164-173
[7] Einar Broch.Tunnels and Underground Works for Hydropower Projects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
[8] .Construction Techniques for a Shallow-Buried Tunnel with a Large Section in Hard Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 190-194
[9] SONG Zhirong.Raise Construction Techniques for Inclined Ventilation Shaft of the Long, Deep- Buried Erlangshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 202-206
[10] WU Quan-Li- 1, 2 Wang-Meng-Shu- 1 Zhu- Lei- 3 Dong-Xin-Ping- 3 Sun-Zheng-Yang- 4.Construction Technology for the Shield Tunnel Passing under the Existing Metro Line at the Launching End[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 134-142
[11] ZHANG Yintao.Construction Techniques for and Cost Analysis of Secant Piles for the Pre-Reinforcement of Tunnels in Sand Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 195-201
[12] .Key Construction Techniques for Urban Underwater Bored Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 9-16
[13] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[14] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[15] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY