Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata
(1. School of Civil Engineering of Xi'an University of Architecture and Technology, Xi′an 710055; 2. Shaanxi Key Laboratory of Geotechnical and Underground Space Engineering, Xi′an 710055; 3. China Railway Construction Bridge Engineering Bureau Group Co., Ltd., Tianjing 300300; 4. The No.1 Engineering Co., Ltd. of China Railway Beijing Engineering Group, Xi′an 710100)
Download: PDF (5660KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In water-rich and weakly cemented strata, tunnel construction is very likely to induce the collapse of the surrounding rocks or serious large deformation of the support structure. This paper puts forward the lower double pilot tunnel construction method applicable for water-rich sandstone strata condition, based on the main tunnel construction of the 3# inclined shaft of the Taoshuping Tunnel on the Lanzhou-Chongqing Passenger Dedicated Line.Meanwhile, it adopts an integrated dewatering scheme of vacuum light well point + water collection well for advanced dewatering of the tunnel to reduce the construction difficulties. Using numerical analysis and on-site monitoring method, it analyzes and evaluates the reasonableness and effectiveness of the construction scheme. The results show that when the lower double pilot tunnel construction method is used, the vault settlement and clearance convergence are 50 mm and 32 mm respectively, while the maximum contact pressure on the support structure is 135.3 kPa, and the deformation and stress of the support structure are both within the acceptable range with the tunnel structure being safe and stable. The lower double pilot tunnel construction method has been successfully applied to the Taoshuping Tunnel, providing references for the construction of extra-large section tunnels in water-rich and weakly cemented strata or soft rock strata.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Huaizheng1 SONG Zhanping1
2 ZHANG Xuewen3 TIAN Xiaoxu1
2 PAN Hongwei4
KeywordsTunnelling    Water-rich and weakly cemented strata   Lower double pilot tunnel construction method   Numerical analysis   Site monitoring     
Abstract: In water-rich and weakly cemented strata, tunnel construction is very likely to induce the collapse of the surrounding rocks or serious large deformation of the support structure. This paper puts forward the lower double pilot tunnel construction method applicable for water-rich sandstone strata condition, based on the main tunnel construction of the 3# inclined shaft of the Taoshuping Tunnel on the Lanzhou-Chongqing Passenger Dedicated Line.Meanwhile, it adopts an integrated dewatering scheme of vacuum light well point + water collection well for advanced dewatering of the tunnel to reduce the construction difficulties. Using numerical analysis and on-site monitoring method, it analyzes and evaluates the reasonableness and effectiveness of the construction scheme. The results show that when the lower double pilot tunnel construction method is used, the vault settlement and clearance convergence are 50 mm and 32 mm respectively, while the maximum contact pressure on the support structure is 135.3 kPa, and the deformation and stress of the support structure are both within the acceptable range with the tunnel structure being safe and stable. The lower double pilot tunnel construction method has been successfully applied to the Taoshuping Tunnel, providing references for the construction of extra-large section tunnels in water-rich and weakly cemented strata or soft rock strata.
KeywordsTunnelling ,   Water-rich and weakly cemented strata,   Lower double pilot tunnel construction method,   Numerical analysis,   Site monitoring     
Cite this article:   
WANG Huaizheng1 SONG Zhanping1, 2 ZHANG Xuewen3 TIAN Xiaoxu1, 2 PAN Hongwei4 .Optimization and Application of the Construction Scheme for Large-section Tunnels in Water-rich and Weakly Cemented Strata[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 210-219
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/210
 
No references of article
[1] WANG Sheng1,2,3,4 WEI Qin1,2 LI Liping3.Catastrophic Mechanisms and Research Development Trends of Water and Mud Inrushes in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(4): 15-25
[2] ZOU Yulin1, 2 LIU Jing1 WANG Bo2 CHENG Ziquan2 XIE Zuodong2 GU Hao3 WANG Kaiyue.Study on the Causes and Prevention Measures of Water and Mud Inrush Disasters in Sichuan Yanjiang Expressway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 259-269
[3] QIN Tiange 1, 2 WU Li CHEN Qian1 XIA Zhen1 LIU Shiya1, 2 CAI Xin1.Research Status and Development Trends of Intelligent Construction System for Drill and Blast Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 1-10
[4] WANG JingYong1,2 WANG Ping2 YANG Jin2 JI Feng3.Optimization Study on the Support Structure of a Tunnel in Carbonaceous Phyllite Using Physical Model Tests[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 160-169
[5] WANG Shuaishuai FU Yifan2,3 XU Yong1 SHI Jingfeng1 GUO Chun2,3.Parametric Study on Air Chamber Ventilation in Tunnelling Using Relay Fans for Airflow Distribution[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(3): 240-248
[6] ZHANG Meining1,2 SONG Zhanping1,2,3 YUE Bo4 LI Xu1,2,3 ZHAO Yirui2 TAO Lei5.Research on Construction and Application of a Rapid Tunnel Surrounding Rock Classification Model Based on Real-time Images and Advanced Geological Information[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 87-97
[7] ZHANG Xinyang1,2 SHEN Yusheng1,2 CHANG Mingyu1,2 LIU Tong1,2 SUN Tianshe3, 4 HU Shuai3, 4.Study on the Control Law of Surface Deformation in Shield Tunnels in Mudstone Strata with the Clay Shock Construction Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(2): 283-290
[8] CHEN Wang1 PENG Yanfeng1 LIU Weizheng2 ZHANG Siyu2 CHEN Changhui1.Analysis of the Impact of the Three Pipe Jacking Over-crossing Construction on Existing Tunnel and Surface Deformation[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 170-182
[9] WANG Haokang1,2 SHEN Yusheng1,2 PAN Xiaohai1,2 CHANG Mingyu1,2 ZHANG Xinyang1,2 SU Wei3.Experimental Study on Dynamic Characteristics of Tunnels Crossing Multi-fault Fracture Zones in Strong Earthquake Regions[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 212-220
[10] YANG Cunbin1,2 REN Yang,1,2 WU Yuehua1,2 HE Wanchao1,2 LI Tianbin1,2.Dynamic Intelligent Prediction of Tunnel Surrounding Rock Geological Information Based on M-LSTM Method[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 74-82
[11] WANG Lichuan1,2 GE Lihui3 WANG Haiyan2 KONG Chao4 LI Qingbin1 WANG Yuntao3 LIU Yufei1.Construction Methods of Longitudinal Synchronous Grouting for Tunnel Crown Secondary Lining Voids[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 269-277
[12] ZHANG Chengyou1 WANG Bo1 DU Zehao1 GAO Junhan1 TAN Lihao2.Analysis of the Suitability of Different Anchor Bolt Support Systems for Rockburst Mitigation and Optimization of Anchor Bolt Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 64-73
[13] ZHANG Xinyang1, 2 SHEN Yusheng1, 2 CHANG Mingyu1, 2 WANG Haokang1, 2 PAN Xiaohai1, 2 WANG Yanyan1, 2.Mix Proportion Design of Similar Materials for Tunnel Surrounding Rocks Based on GA-BP Neural Network[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 82-91
[14] HUI Qiang1 GAO Feng1,2 TAN Xukai1 YOU Dongmei1.Study on Structural Damage Characteristics of Tunnels Crossing Active Faults Based on Layered Dislocation Theory[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 35-44
[15] XU Xiaojing1,2 SONG Zhanping1,2,3 TIAN Xiaoxu1,2 DING Libo? SUN Yinhao? ZHAO Junbo1,2.Analysis of the Support Effect of Micro Steel Pipe Pile-Anchor Bolt at Tunnel Portal Slope Based on the Incremental Method[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 118-128
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY