Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (4) :127-136    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis on Deformation and Failure Characteristics of Surrounding Rock in Horizontal Layered Tunnels under High Crustal Stress Based on 3DEC Simulation
 
(1. School of Highway, Chang'an University, Xi′an 710064; 2. Shaanxi Provincial Key Laboratory of Highway Bridges and Tunnels,Chang′an University, Xi′an 710064; 3. The First Engineering Co., Ltd. of China Railway Beijing Engineering Group, Xi′an 710119)
Download: PDF (4315KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Guide  
Abstract In order to thoroughly study the characteristics of deformation failure in surrounding rock of horizontal layered tunnels under high crustal stress environment, the crustal stress test results and the deformation failure of surrounding rock were analyzed based on engineering background of Yunnan Zhaotong-Leshan Expressway Jiaoding Tunnel. The 3D discrete element (3DEC) numerical simulation method was adopted to study the deformation failure laws of surrounding rock under the conditions of different rock thickness d, crustal stress level s and lateral pressure coefficient k. Moreover, the stress characteristics and deformation failure mechanism of surrounding rock of horizontal layered tunnel were discussed as well. The results show: the deformation of horizontal layered surrounding rock is symmetrically distributed along the central axis of the tunnel. The displacement of surrounding rock is the largest where the joint direction is tangent to the tunnel contour, but is the smallest where the joint direction is orthogonal to the tunnel contour; With the increase of layer thickness, the displacement of surrounding rock of the tunnel decreases gradually. The displacement changes faster when the thickness is 0~0.3 m, slows down when the thickness exceeds 0.3 m, and basically tends to be stable when the layer thickness reaches 3.0 m; The displacement of tunnel surrounding rock increases gradually with the increase of crustal stress, and the change rate remains stable; The displacement of tunnel surrounding rock increases gradually as function of lateral pressure coefficient, and the displacement change is the most significant at the arch waist. In the crustal stress environment, severe compression deformation may occur even if rock strength is great, in case the layered joints of the surrounding rock are developed, which shows the characteristics of great deformation in soft rock.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Yaqiong1
2 YANG Qiang1
2 PAN Hongwei3 GAO Qidong1
2 ZHANG Shichao1
2 WANG Zhifeng1
2
KeywordsHigh crustal stress   Horizontal layered surrounding rock   Rock thickness   Level of crustal stress   Lateral pressure coefficient   3DEC simulation     
Abstract: In order to thoroughly study the characteristics of deformation failure in surrounding rock of horizontal layered tunnels under high crustal stress environment, the crustal stress test results and the deformation failure of surrounding rock were analyzed based on engineering background of Yunnan Zhaotong-Leshan Expressway Jiaoding Tunnel. The 3D discrete element (3DEC) numerical simulation method was adopted to study the deformation failure laws of surrounding rock under the conditions of different rock thickness d, crustal stress level s and lateral pressure coefficient k. Moreover, the stress characteristics and deformation failure mechanism of surrounding rock of horizontal layered tunnel were discussed as well. The results show: the deformation of horizontal layered surrounding rock is symmetrically distributed along the central axis of the tunnel. The displacement of surrounding rock is the largest where the joint direction is tangent to the tunnel contour, but is the smallest where the joint direction is orthogonal to the tunnel contour; With the increase of layer thickness, the displacement of surrounding rock of the tunnel decreases gradually. The displacement changes faster when the thickness is 0~0.3 m, slows down when the thickness exceeds 0.3 m, and basically tends to be stable when the layer thickness reaches 3.0 m; The displacement of tunnel surrounding rock increases gradually with the increase of crustal stress, and the change rate remains stable; The displacement of tunnel surrounding rock increases gradually as function of lateral pressure coefficient, and the displacement change is the most significant at the arch waist. In the crustal stress environment, severe compression deformation may occur even if rock strength is great, in case the layered joints of the surrounding rock are developed, which shows the characteristics of great deformation in soft rock.
KeywordsHigh crustal stress,   Horizontal layered surrounding rock,   Rock thickness,   Level of crustal stress,   Lateral pressure coefficient,   3DEC simulation     
Fund: 
Cite this article:   
WANG Yaqiong1, 2 YANG Qiang1, 2 PAN Hongwei3 GAO Qidong1 etc .Analysis on Deformation and Failure Characteristics of Surrounding Rock in Horizontal Layered Tunnels under High Crustal Stress Based on 3DEC Simulation[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(4): 127-136
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I4/127
 
No references of article
[1] MA Dong JIN Liujie WANG Wuxian HUANG Lixin.Discussion on the Timing for the Secondary Lining Construction in Soft Ground Tunnels with High Geostress Based on Numerical Simulation and Measured Data Fitting[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 137-146
[2] CUI Guangyao1 WEI Hanghang1 WANG Mingsheng2.A Field Test Study on the Large Deformation Control for Tunnels Built in Seriously-weathered Carbonaceous Slate Strata with High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(3): 183-189
[3] LUO Chun1 ZHANG Zhiqiang1 LIN Dirui1 TANG Zelin2.Study of the Impact of Single-and Double-tube Tunnel Systems on Rockburst in Deep-buried Extra-long Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 28-37
[4] YUAN Wei1 LU Junfu2 LIU Jinsong1 WU Junmeng1.Cause Analysis of Persistent Heaving of Tunnel Floors in Red-bed Mudstone with Complex Geo-stress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 242-250
[5] CHEN Zhimin1,2 LI Jiangpeng1 XUE Zhiwen3.Model Test Study on‘Lost’Deformation and Corresponding Control Measures in Soft Rock Tunnels with Extremely High Ground Stress[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 164-175
[6] HUI Qiang1 ZHANG Jun2 JIANG Haibo1.Study on the Characteristics and Distribution Laws of Plastic Zone Induced by Deep-buried High-geostress Hydraulic Tunnelling in Jointed Rock Mass[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 86-94
[7] WEI Yinghua LIU Fei.Numerical Simulation Analysis of the Rockburst Mechanism in the Tunnel with High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 46-54
[8] CHEN Weijie1 SU Dong1,2 CHEN Xiangsheng1,2 PANG Xiaochao2,3 LEI Guoping1,2.Study on the Influence of Coefficients of Subgrade Reaction and Lateral Pressure on Deformation of the Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 110-115
[9] WANG Jianyu.The Key Way is to Release the Genuine Rock Pressure—Discussion on Problems of Tunnelling in Squeezing Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 1-11
[10] DAI Cong1,3 HE Chuan2,3 LIU Chuankun2,3 GUO Wenqi2,3.Model Test Study on Influence of Excavation Methods on Stability of Surrounding Rocks of the Soft Rock Tunnel in High Geostress Field[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 141-149
[11] LIAO Yankai1 GUO Deping1 LIU Zhiqiang2 CHEN Dayang2.Application of Peripheral Strain and Squeezing Factor Methods in the Prediction of Large Deformation of Tunnel Surrounding Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 20-26
[12] LI Chang1,2 WANG Gang1,2 QIU Wenge1,2,3 GONG Lun1,2 ZHAO Yingchun4 WANG Qiuhui4.Research and Application of Support Resistant Limiting Dampers in the Tunnel with High Horizontal Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(3): 15-29
[13] LI Yanzong ZHAO Shuang.Analysis on Construction Schemes and Deformation of Multi-layer Support Structure for a Soft Rock Tunnel under High Geostress[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 161-165
[14] YANG Mugao.Large Deformation Control Techniques for the Muzhailing Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 175-181
[15] WANG Lixin1,2 LIU Baojian3 BAI Yangyang1,2.Study on Interaction Mechanism between Collapsible Loess and the Subway Underground Structure[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 72-78
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY