Abstract The construction of a secondary cofferdam of an immersed tunnel is directly related to the safety of the foundation pit during the construction of the main structure onshore, as well as the construction schedule of the immersed tunnel and related costs. This paper introduces the underwater undispersed concrete technique applied in the construction of a secondary cofferdam of an immersed tunnel.
Keywords :
Immersed tube tunnel
Secondary cofferdam
Construction technique
Abstract :
The construction of a secondary cofferdam of an immersed tunnel is directly related to the safety of the foundation pit during the construction of the main structure onshore, as well as the construction schedule of the immersed tunnel and related costs. This paper introduces the underwater undispersed concrete technique applied in the construction of a secondary cofferdam of an immersed tunnel.
Keywords :
Immersed tube tunnel ,
Secondary cofferdam ,
Construction technique
published: 2011-07-25
[1]
LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling [J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2]
HAN Yuxuan1 LENG Xiqiao2,3 YAN Jinxiu4 ZHANG Rui5.Construction Technology for the Shaft of Extra-long Micangshan Tunnel [J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 133-138
[3]
KONG Qingxiang ZHAI Renfeng.Some Issues Concerning Construction of High Speed Railway Tunnels and Corresponding Countermeasures:A Case Study of Beitaizi Tunnel on the Beijing-Shengyang Railway [J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 166-171
[4]
WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2. [J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[5]
ZHOU Baosheng.Optimized CRD Construction Techniques for a Super-Shallow Bored Tunnel [J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 186-190
[6]
AN Yonglin1 OUYANG Pengbo1 PENG Limin2 WU Bo3 HU Wenxuan1.Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel [J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 164-173
[7]
Einar Broch.Tunnels and Underground Works for Hydropower Projects [J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
[8]
.Construction Techniques for a Shallow-Buried Tunnel with a Large Section in Hard Rock [J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 190-194
[9]
SONG Zhirong.Raise Construction Techniques for Inclined Ventilation Shaft of the Long, Deep- Buried Erlangshan Tunnel [J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 202-206
[10]
WU Quan-Li- 1, 2 Wang-Meng-Shu- 1 Zhu- Lei- 3 Dong-Xin-Ping- 3 Sun-Zheng-Yang- 4.Construction Technology for the Shield Tunnel Passing under the Existing Metro Line at the Launching End [J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 134-142
[11]
ZHANG Yintao.Construction Techniques for and Cost Analysis of Secant Piles for the Pre-Reinforcement of Tunnels in Sand Strata [J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 195-201
[12]
.Key Construction Techniques for Urban Underwater Bored Tunnels [J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 9-16
[13]
Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[14]
Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[15]
Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project [J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23