[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (1) :84-95    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
矿山法海底隧道水压力分布规律及限排设计研究
(1.西南交通大学 交通隧道工程教育部重点实验室,成都 610031;2.西南交通大学城市轨道交通学院,成都 611756;3.中国铁路设计集团有限公司,天津 300308)
Study on Water Pressure Distribution Pattern and Limited Drainage Design of Mined Subsea Tunnel
(1. Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031;2. Institute of Urban Rail Transportation, Southwest Jiaotong University, Chengdu 611756; 3. China Railway Design Corporation,Tianjin 300308)
Download: PDF (7691KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 高水压及上覆淤泥层等复杂地质条件是影响海底隧道渗流特征与防排水设计的关键因素。为系统研究海底隧道周围水压分布规律及涌水量特征,基于水力学理论,推导考虑上覆淤泥层的海底隧道渗流场解析解,并建立相应的数值模型,通过与理论结果的对比分析,验证数值模型的适用性和准确性。通过数值模拟,获得海域段隧道最优限量排水方案与合理泄压值,进一步探究淤泥层厚度和覆盖率等因素对隧道涌水量及衬砌背后水压力分布特征的影响规律,揭示上覆淤泥层对海底隧道渗流特征的作用机理。结果表明:(1)随着泄压值的增大,隧道排水量呈线性递减趋势,衬砌背后水压力呈线性增大;在相同泄压值条件下,随着环向排水盲管间距的增大,隧道排水量逐渐减小,衬砌背后水压力逐渐增大。(2)在淤泥厚度为12 m时海域矿山法段隧道最优限量排放方案为半包防水型式,排水方式选取“间隔6 m环向排水盲管+纵向排水盲管”,泄压值为400 kPa。(3)淤泥层厚度和覆盖率的增加可以减小排水量并在一定程度上降低衬砌背后水压力;在弱风化花岗岩与淤泥覆盖层交界处,衬砌背后水压力出现一定程度的突变,应重点考虑通过确定的淤泥层覆盖率或局部淤泥层厚度来合理优化排水系统的排水参数。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
靖一峰1 汪 波1 梅 洁1
2 熊文威1 孟庆余3
关键词海底隧道   淤泥覆盖层   排水量   水压力分布   限量排放     
Abstract: The complex geological conditions such as high water pressure and overlying silt layer are the key factors that affect the seepage characteristics and the waterproofing and drainage design of subsea tunnels. In order to systematically investigate the ambient water pressure distribution pattern and water inflow characteristics of subsea tunnel, the analytical solution for seepage field of subsea tunnel that takes into account overlying silt layer has been deduced by using the hydromechanical theories, and the corresponding numerical model has been created. Through comparison and analysis of the theoretical results, the suitability and accuracy of the numerical model have been verified. Through numerical simulation, the optimum limited drainage scheme and rational depressurization value for subsea tunnel have been obtained, the laws by which the factors such as silt layer thickness and coverage rate will affect the tunnel water inflow and the water pressure distribution pattern behind the lining have been further investigated, and the mechanism of action of overlying silt layer on the seepage characteristics of subsea tunnel have been revealed. As the results indicate: (1) As the depressurization value increases, the water drainage of tunnel decreases linearly, while the water pressure behind the lining increases linearly. With the same depressurization value,as the spacing between the circumferential French drain pipes increases, the water drainage of tunnel gradually decreases, while the water pressure behind the lining gradually increases. (2) When the silt layer thickness is 12 m,the optimum limited drainage scheme for mined subsea tunnel is as follows: for semi-closed waterproofing method,the waterproofing system is "circumferential French drain pipe + longitudinal circumferential French drain pipe with 6 m spacing", and the depressurization value is 400 kPa. (3) Increase of the silt layer thickness and coverage rate will decrease the water drainage and, to certain extent, decrease the water pressure behind the lining. At the junction between weakly weathered granite and silt overburden, the water pressure behind the lining changes abruptly,so priority should be given to optimizing the water drainage parameters of the drainage system according to the known silt layer coverage rate or local silt layer thickness.
KeywordsSubsea tunnel,   Silt overburden,   Water drainage,   Water pressure distribution,   Limited drainage     
基金资助:国家自然科学基金(U2034205);中央高校基本科研业务费专项资金(2682022CX073);浙江省交通科技项目(2021051);四川交通科技项目(2021-MS1-030, 2021-B-01);国铁集团系统性重大项目(P2022G055);中国铁路设计集团有限公司科技开发课题(2020YY240610);中国国家铁路集团有限公司科技研究开发计划项目重大课题(K2020G033)
作者简介: 靖一峰(1999-),男,硕士研究生,主要从事隧道与地下工程相关研究工作,E-mail:jingyifeng0623@163.com. 通讯作者:梅 洁(1991-),女,博士,讲师,主要从事富水深埋隧道工程及裂隙岩体力学特性相关研究工作,E-mail:meijie900220@163.com.
引用本文:   
靖一峰1 汪 波1 梅 洁1, 2 熊文威1 孟庆余3 .矿山法海底隧道水压力分布规律及限排设计研究[J]  现代隧道技术, 2024,V61(1): 84-95
JING Yifeng1 WANG Bo1 MEI Jie1, 2 XIONG Wenwei1 MENG Qingyu3 .Study on Water Pressure Distribution Pattern and Limited Drainage Design of Mined Subsea Tunnel[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(1): 84-95
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I1/84
 
没有本文参考文献
[1] 周 骥1 王希浩2 康 松2 代镇洋2.海水与高温环境对膨润土泥浆流变特性的影响研究[J]. 现代隧道技术, 2024,61(1): 174-181
[2] 黄世光 1 杨艳娜 2 范全忠 2 黄靖宇 2 余 磊 2.隧道堵水限排设计参数变化规律试验研究[J]. 现代隧道技术, 2022,59(3): 201-210
[3] 焦 雷.海底隧道注浆材料耐腐蚀性能研究及工程应用[J]. 现代隧道技术, 2022,59(1): 256-262
[4] 董建松.厦门海沧海底隧道穿越风化槽施工技术[J]. 现代隧道技术, 2021,58(6): 197-203
[5] 杜宝义 1 宋超业 1 贺维国 1 李 凯 2.海底隧道钻爆法与盾构法交接技术及应用[J]. 现代隧道技术, 2021,58(2): 208-213
[6] 吴金刚.妈湾通道前海湾海底隧道沉管法技术可行性研究[J]. 现代隧道技术, 2018,55(3): 28-36
[7] 宋超业, 贺维国.氯化物环境暗挖海底隧道支护结构的耐久性设计[J]. 现代隧道技术, 2016,53(2): 165-172
[8] 李永宽1,2 张顶立1 房 倩1.海底隧道建设全过程风险评估分析[J]. 现代隧道技术, 2015,52(3): 47-54
[9] 赵成龙1, 2, 李术才1, 徐帮树1, 张乐文1.动态增量位移正算反演分析及其在隧道工程中的应用[J]. 现代隧道技术, 2014,51(6): 78-82
[10] 朱朝佐.复杂机房风道互通群洞施工技术[J]. 现代隧道技术, 2014,51(2): 122-126
[11] 程选生1, 2 王建华1 杜修力2.渗流作用下海底隧道的流-固耦合地震响应分析[J]. 现代隧道技术, 2013,50(6): 44-51
[12] 谢文清 杨龙伟 吴登奎.胶州湾海底隧道快速超前帷幕注浆施工技术[J]. 现代隧道技术, 2013,50(3): 147-152
[13] 李沿宗 李治国 王全胜 焦雷.钻爆法海底隧道软弱破碎地层注浆加固堵水技术浅析[J]. 现代隧道技术, 2013,50(2): 26-33
Copyright 2010 by 现代隧道技术