[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2020, Vol. 57 Issue (3) :135-140    DOI:
试验与监测 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
豆砾石充填体波速与应力实时同向相关性研究
(1中国科学院武汉岩土力学研究所 岩土力学与工程国家重点实验室, 武汉 430071;2合肥学院建筑工程系,合肥 230601)
Study on Real Time Synchronized Correlation between Wave Velocity and Stress of Pea-gravel Backfills
(1 State Key Laboratory of Geomechanics and Geotechnical Engineering, Institute of Rock and Soil Mechanics, Chinese Academy of Sciences, Wuhan 430071; 2 Department of Civil Engineering, Hefei University, Hefei 230601)
Download: PDF (3250KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 豆砾石的充填灌浆质量关系到隧道衬砌和围岩是否共同受力,通过豆砾石充填体波速的变化来分析豆砾石充填体的工程质量是一种行之有效的工程措施。文章针对豆砾石充填体开展了单轴压缩试验,并在加载过程中进行波速与应力实时同向测试,获得了豆砾石充填体在加载过程中轴向声波波速与应力的演化规律。试验结果表明:豆粒石充填体横向应变在弹性变形阶段变化不明显,体应变在接近峰值应力时才出现拐点;在加载初期,波速快速上升,随着应力的继续增加,波速增幅变缓,后期基本保持不变,在峰后阶段波速基本维持在最大值直到试验结束,此阶段波速与应力的相关性不明显;根据轴向波速与应力的变化规律,得到了应力与波速的指数函数拟合公式,据此可以通过现场测试获得的波速预测现场豆砾石充填体的充填质量。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
胡明明 1 高 阳 1 陈家骐 2 司大雄 2 段园煜 2
关键词:   
Abstract: The backfilling and grouting quality of pea-gravel concerns the issue if the tunnel lining and surrounding rocks will work jointly. And it is an effective engineering measure to analyze the engineering quality of pea-gravel backfills through the changes of wave velocity of the pea-gravel backfills. A uniaxial compression test on the backfills of pea gravel is conducted, a real time synchronous test on wave velocity and stress is undertaken during loading test, and the evolution laws of acoustic wave velocity and stress in axial direction during loading on pea-gravel backfills are obtained. The experimental results show that the change of lateral strain of pea-gravel backfills is not obvi0us in elastic deformation stage and the volumetric strain does not reach the inflection point until it approaches the peak stress; at the initial stage of loading, the wave velocity rises rapidly and then increases slowly with the continuous increase of stress and remains basically unchanged at later stage,at the post-peak stage the wave velocity mainly remains at the maximum value until the end of the test, there is no obvious correlation between wave velocity and stress. Based on the relationship between stress and axial wave velocity, a fitting formula for exponential function of stress and wave velocity is obtained, so the quality of pea-gravel backfills can be predicted by the wave velocity obtained by field test.
KeywordsUltrasonic wave,   Wave velocity,   Uniaxial loading,   Pea-gravel,   Volumetric strain     
基金资助:基金项目:安徽省重点研究与开发计划面上攻关项目(1804a0802206);合肥学院自然科学研究项目(18ZR01ZDB)
作者简介: 作者简介:胡明明(1986–),男,博士,讲师,主要从事岩石力学声学试验方面的研究工作,E-mail:mingcumt@163.com.
引用本文:   
胡明明 1 高 阳 1 陈家骐 2 司大雄 2 段园煜 2 .豆砾石充填体波速与应力实时同向相关性研究[J]  现代隧道技术, 2020,V57(3): 135-140
HU Mingming1 GAO Yang1 CHEN Jiaqi2 SI Daxiong2 DUAN Yuanyu2 .Study on Real Time Synchronized Correlation between Wave Velocity and Stress of Pea-gravel Backfills[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(3): 135-140
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I3/135
 
没有本文参考文献
[1] 马 辉 1 高明忠 2.基于系统工程方法论的川藏铁路隧道工程建设管理探讨[J]. 现代隧道技术, 2020,57(3): 1-8
[2] 王明年 1,2 郭晓晗 1,2 于 丽 1,2 李春荟 1,2 陈树汪 3.高海拔特长铁路隧道紧急救援站位置选型研究[J]. 现代隧道技术, 2020,57(3): 9-14
[3] 李 畅 1,2,3 王 刚 1,2 仇文革 1,2,3 龚 伦 1,2 赵迎春 4 王秋会 4.限阻器在高水平地应力隧道支护中的研究与应用[J]. 现代隧道技术, 2020,57(3): 15-29
[4] 廖 军 1 董 谦 1 梁洪永 2 简 波 2 石豫川 1,3 龚洪苇 1.近水平红层公路隧道围岩分级指标初探[J]. 现代隧道技术, 2020,57(3): 25-29
[5] 卢 松 1,2 汪 旭 1,2 李苍松 1,2 孟 露 1,2.应用HSP法的TBM隧道施工地质预报技术研究[J]. 现代隧道技术, 2020,57(3): 30-35
[6] 钟祖良 1,2 高国富 1,2 陈 鹏 1 严 如 1.重庆两江船舶观光隧道设计方案探讨[J]. 现代隧道技术, 2020,57(3): 36-42
[7] 黄福杰 何则干 张为民 刘珊珊.BIM技术在沉管隧道工程设计中的应用研究[J]. 现代隧道技术, 2020,57(3): 43-48
[8] 唐晓松 1,2 郑颖人 3 王永甫 1.有限元强度折减法在隧道施工稳定分析与控制中的应用[J]. 现代隧道技术, 2020,57(3): 49-55
[9] 吴 波 1, 2 兰扬斌 1,2 杨仕升 1,2 杨建新 3 庞晓瑜 3.基于强度折减动力分析法的围岩稳定性研究[J]. 现代隧道技术, 2020,57(3): 56-64
[10] 周翠英 1, 2 李 昂 2,3 刘 镇 1,2.平行褶皱构造对隧道围岩变形的影响研究[J]. 现代隧道技术, 2020,57(3): 65-74
[11] 马 莉 1 刘亚朋 2 李 盛 3,4 吕文达 5 谢 超 3,4 代金鹏 3,4.不同减载措施下高填黄土拱形明洞结构受力研究[J]. 现代隧道技术, 2020,57(3): 75-84
[12] 张丙武 1 张 鹏 1 戴振华 2 吴银河 2 罗 卫 2.河底地铁盾构隧道管片受力特征分析[J]. 现代隧道技术, 2020,57(3): 85-90
[13] 隋 心 1 张正维 1 闵 绚 2 DOWNIE Steven 3 PADHANI Shahid3 赵丽博 4.超长GIL综合管廊SF6气体泄露模拟研究[J]. 现代隧道技术, 2020,57(3): 91-98
[14] 张珂峰.前伏溶洞巷道开挖突水数值模拟研究[J]. 现代隧道技术, 2020,57(3): 99-107
[15] 张 研 1, 2 王 伟 2 邓雪沁 2.基于相关向量机的TBM掘进速度预测模型[J]. 现代隧道技术, 2020,57(3): 108-114
Copyright 2010 by 现代隧道技术