极高地应力破碎地层斜井进正洞力学行为分析及施工优化研究
(1.中铁隧道局集团有限公司,广州 511458;2.广东省隧道结构智能监控与维护企业重点实验室,广州 511458)
Mechanical Behavior Analysis and Construction Optimization for Inclined Shaft Transitioning to Main Tunnel in Extreme-highly Stressed and Fractured Strata
(1. China Railway Tunnel Group Co., Ltd., Guangzhou 511458; 2. Guangdong Key Laboratory of Intelligent Monitoring and Maintenance of Tunnel Structure, Guangzhou 511458)
Download: PDF (5617KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 针对极高地应力破碎地层斜井转正洞大断面隧道群钻爆法施工所面临的多次扰动及群洞效应所带来的安全问题,开展了隧道群施工过程中围岩力学状态及劣化过程研究。以某深埋大断面双洞TBM隧道斜井进正洞工程施工为例,通过隧道力学理论分析,揭示极高地应力破碎地层群洞效应的力学机制和影响因素,建立隧道群三维数值模型,对隧道群开挖过程的围岩应力应变状态进行数值分析。结果表明,加强支护结构和采用超前支护均可降低围岩变形量,但是采用超前支护对围岩变形的控制效果更好;通过优化施工步序,并采用大管棚进行超前支护,可在不改变支护结构参数的情况下有效控制围岩变形,保障施工安全。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词极高地应力   破碎地层   群洞效应   力学行为   施工技术     
Abstract: Aiming at the safety issues caused by multiple disturbances and tunnel group effects during the drill and blast construction of large-section tunnel group in highly stressed and fractured strata in the course of the inclined shaft transitioning the main tunnel, this study investigates the mechanical state and degradation process of surrounding rock during tunnel group construction. Taking the construction of the inclined shaft transitioning to the main tunnel of a deeply buried large-section twin-tube TBM tunnel project as an example, the mechanical mechanism and influencing factors of the tunnel group effect in highly stressed and fractured strata are revealed through theoretical analysis of tunnel mechanics. A three-dimensional numerical model of the tunnel group is established to analyze the stress-strain state of the surrounding rock during the excavation process of tunnel group. The results indicate that strengthening the support structure and constructing the advanced support can both reduce the deformation of the surrounding rock, with the advanced support providing better control effect. By optimizing the construction sequences and using the large pipe roof for pre-supporting, the deformation of the surrounding rock can be effectively controlled without changing the support structure parameters, ensuring construction safety.
KeywordsExtreme-high stress,   Fractured strata,   Tunnel group,   Construction technology     
作者简介: 周 嵩(1977-),男,硕士,高级工程师,主要从事隧道与地下工程方面管理工作,E-mail: zssong99@163.com. 通讯作者:潘 岳(1993-),男,博士,高级工程师,主要从事隧道与地下工程方面研究工作,E-mail:yuepan@my.swjtu.edu.cn.
引用本文:   
.极高地应力破碎地层斜井进正洞力学行为分析及施工优化研究[J]  现代隧道技术, 2024,V61(4): 142-150
.Mechanical Behavior Analysis and Construction Optimization for Inclined Shaft Transitioning to Main Tunnel in Extreme-highly Stressed and Fractured Strata[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(4): 142-150
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I4/142
 
没有本文参考文献
[1] 浣宇翔1 田礼勇2 杨文波1 李昊豫1 刘 勇3 唐 浩3 姚超凡1.软岩大变形隧道支护拆换力学与时空变形行为研究[J]. 现代隧道技术, 2024,61(3): 96-107
[2] 陈志敏1 王 洪1 龚 军2 李增印2 彭 易1.高地应力软岩隧道双层初期支护围岩变形特征[J]. 现代隧道技术, 2024,61(3): 85-95
[3] 喻 渝 齐 春 杨建民 罗禄森.黄土隧道修建技术进展与展望[J]. 现代隧道技术, 2024,61(2): 80-89
[4] 申志军1,2 姚智文1 郑余朝1 仇文革1 艾旭峰1.蒙华铁路白城隧道马蹄形盾构设计施工关键技术[J]. 现代隧道技术, 2024,61(2): 254-262
[5] 陶玉敬 1 袁传保 1 王茂靖 1 宋 章 1 刘国强 2.成兰铁路跃龙门隧道深埋越岭段大变形原因分析研究[J]. 现代隧道技术, 2023,60(4): 229-236
[6] 刘国强.跃龙门隧道软岩大变形两台阶快速成环法施工技术研究[J]. 现代隧道技术, 2023,60(3): 252-258
[7] 蒲 松 1 向 龙 2 廖 杭 1 余 涛 1 姚志刚 1 方 勇 1 朱牧原 1.极高地应力层状围岩隧道偏压演化规律及围岩控制[J]. 现代隧道技术, 2023,60(1): 90-99
[8] 刘 智 1 钟长平 2.超大直径泥水平衡盾构断层破碎带掘进关键技术研究[J]. 现代隧道技术, 2023,60(1): 225-232
[9] 王明江 1 慈新航 2 陈俊武 3 朱长江 1 杨 峰 2.浅埋大偏压双洞六车道无中导洞连拱隧道进洞施工技术[J]. 现代隧道技术, 2023,60(1): 241-248
[10] 卢小刚 1 耿建宇 1 庞 雷 1 范金海 1 李良勇 1 方亚彪 2,3 王 峰 2,3.无中导洞法双连拱隧道后行洞施工力学行为及参数优化分析[J]. 现代隧道技术, 2022,59(5): 80-90
[11] 董建松.厦门海沧海底隧道穿越风化槽施工技术[J]. 现代隧道技术, 2021,58(6): 197-203
[12] 竺维彬 1,2 钟长平 3 米晋生 1 黄威然 4.超大直径复合式盾构施工技术挑战和展望[J]. 现代隧道技术, 2021,58(3): 6-16
[13] 刘 辉 1 李彦青 2.上软下硬浅覆土条件下土压平衡盾构下穿密集建筑群施工技术研究[J]. 现代隧道技术, 2020,57(6): 186-192
[14] 田瑞忠.岩溶地层地铁正线与联络线接岔段洞室群暗挖施工技术[J]. 现代隧道技术, 2020,57(6): 193-199
[15] 郭庆军.隧道富水段突水处治及施工优化[J]. 现代隧道技术, 2020,57(6): 219-223
Copyright 2010 by 现代隧道技术