成兰铁路跃龙门隧道深埋越岭段大变形原因分析研究
(1.中铁二院工程集团有限责任公司,成都 610031;2. 中铁十九局集团有限公司,北京 100176)
Analysis on Causes of Large Deformation in the Deep-buried Mountain Ridge Section of Yuelongmen Tunnel on Chengdu-Lanzhou Railway
(1. China Railway Southwest Research Institute Co., Ltd., Chengdu 610031; 2. China Railway 19th Bureau Group Corporation Limited,Beijing 100176)
Download: PDF (4311KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 成兰铁路跃龙门隧道在深埋越岭段中间平导发生严重大变形,采取有效支护措施后变形趋于稳定。在对应平导变形段落左线开挖贯通后,平导及左线再次发生严重变形。基于此,文章系统介绍了隧道区域地质环境、区域地应力、施工中围岩变形特征以及现场施工大变形的判定过程,分析表明,该段大变形是在高地应力环境下岩体软弱破碎引起的,在此特殊地质环境中群洞效应显著,且大变形和岩层走向与洞轴线夹角、地应力最大水平主应力方向与洞轴线夹角有较大关系,并通过回填中部平导,新增较大线间距的外侧平导,增加洞室间距来解决大变形问题。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
陶玉敬 1 袁传保 1 王茂靖 1 宋 章 1 刘国强 2
关键词成兰铁路   跃龙门隧道   软弱围岩   高地应力   大变形   等级判定   群洞效应     
Abstract: The middle parallel pilot tunnel of the Yuelongmen Tunnel on the Chengdu-Lanzhou Railway encoun? tered severe deformation in the deep-buried mountain ridge section. After effective support measures were taken,the deformation tended to be stabilized. After excavation and breakthrough of the left line main tunnel in the corresponding deformation section of the pilot tunnel, severe deformation occurred again in the pilot tunnel and the left line main tunnel. On this basis, this paper systematically introduces the geological environment of the tunnel site area,regional geostress condition, deformation characteristics of surrounding rock during construction, and the process of identifying large deformation in site construction. The analysis shows that the large deformation in this section is caused by the weak and broken rock mass in the high geostress environment. In this special geological environment,the tunnel group effect is significant, and the large deformation is closely related to the included angle between the rock strata strike and the tunnel axis, and the included angle between the maximum horizontal principal stress direc? tion of the geostress and the tunnel axis. The problem of large deformation is solved by backfilling the middle pilot tunnel, constructing a new outside pilot tunnel with a larger spacing between pilot tunnel and main tunnel.
KeywordsChengdu-Lanzhou Railway,   Yuelongmen Tunnel,   Weak surrounding rock,   High geostress,   Large defor? mation of soft rock,   Grade identification,   Tunnel group effect     
作者简介: 陶玉敬(1982-),男,硕士,高级工程师,主要从事铁路工程地质勘察和研究工作,E-mail:yjtao1982@163.com.
引用本文:   
陶玉敬 1 袁传保 1 王茂靖 1 宋 章 1 刘国强 2 .成兰铁路跃龙门隧道深埋越岭段大变形原因分析研究[J]  现代隧道技术, 2023,V60(4): 229-236
TAO Yujing1 YUAN Chuanbao1 WANG Maojing1 SONG Zhang1 LIU Guoqiang2 .Analysis on Causes of Large Deformation in the Deep-buried Mountain Ridge Section of Yuelongmen Tunnel on Chengdu-Lanzhou Railway[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(4): 229-236
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I4/229
 
没有本文参考文献
[1] 王 冠.严重挤压性围岩隧道平行导洞双层支护作用机理研究[J]. 现代隧道技术, 2023,60(4): 138-146
[2] 陈锡武 1 卿伟宸 1 刘国强 2.高地应力断层带超大断面隧道施工设计[J]. 现代隧道技术, 2023,60(4): 204-212
[3] 袁传保 1 鲁金林 1 陶玉敬 1 宋 章 1 刘国强 2.复杂强震山区跃龙门隧道重大工程地质问题研究[J]. 现代隧道技术, 2023,60(4): 188-195
[4] 王修领.软弱隧道围岩与结构协同作用特征模型试验研究[J]. 现代隧道技术, 2023,60(3): 164-174
[5] 刘国强.跃龙门隧道软岩大变形两台阶快速成环法施工技术研究[J]. 现代隧道技术, 2023,60(3): 252-258
[6] 蒲 松 1 向 龙 2 廖 杭 1 余 涛 1 姚志刚 1 方 勇 1 朱牧原 1.极高地应力层状围岩隧道偏压演化规律及围岩控制[J]. 现代隧道技术, 2023,60(1): 90-99
[7] 于国亮 1 娄义黎 2,3 吴国鹏 1 施成华 2,3 郑可跃 2,3.高地应力下顺层偏压隧道开挖变形控制技术研究[J]. 现代隧道技术, 2022,59(5): 237-245
[8] 王亚琼 1, 2 杨 强 1, 2 潘红伟 3 高启栋 1, 2 张士朝 1, 2 王志丰 1, 2.基于3DEC模拟的高地应力水平层状隧道围岩变形破坏特征分析[J]. 现代隧道技术, 2022,59(4): 127-136
[9] 马 栋 晋刘杰 王武现 黄立新.基于数值模拟与实测数据拟合的高地应力软岩隧道二次衬砌施作时机探讨[J]. 现代隧道技术, 2022,59(4): 137-146
[10] 崔光耀 1 魏杭杭 1 王明胜 2.高地应力强风化炭质板岩隧道大变形控制现场试验研究[J]. 现代隧道技术, 2022,59(3): 183-189
[11] 罗 春 1 张志强 1 林迪睿 1 唐泽林 2.特长深埋隧道合修与分修对岩爆的影响研究[J]. 现代隧道技术, 2022,59(2): 28-37
[12] 袁 伟 1 路军富 2 刘金松 1 吴俊猛 1.复杂地应力红层泥岩隧道持续底鼓原因分析[J]. 现代隧道技术, 2022,59(2): 242-250
[13] 陈志敏 1,2 李江鹏 1 薛智文 3.极高地应力软岩隧道丢失变形与控制模型试验研究[J]. 现代隧道技术, 2022,59(1): 164-175
[14] 何乐平 1 徐应东 1 胡启军 1 蔡其杰 2.基于博弈论-云模型的软岩隧道大变形风险评估[J]. 现代隧道技术, 2021,58(6): 85-94
[15] 惠 强 1 张 军 2 姜海波 1.深埋高地应力水工隧洞节理岩体开挖塑性区特征及分布规律研究[J]. 现代隧道技术, 2021,58(4): 86-94
Copyright 2010 by 现代隧道技术