大倾角斜井有轨运输设备配置技术
(中铁十二局集团第三工程有限公司,太原 030024)
Case Study of Scheduling Technology for the Hoist Transportation Systemof a Large Angle Inclined Shaft
(Headquarters of C7 bid of Daxiangling tunnel, the 3rd engineering company of China Railway No.12th Construction group Ltd., Taiyuan 030024, Shanxi, China )
Abstract:
The NO.2 inclined shaft of the Daxiangling tunnel is characterized by its length, steep gradient and complex geological conditions, which make tunnel ventilation difficult. The matching of the muck loading, transporting and hoisting equipment for the NO.2 inclined shaft of the Daxiangling tunnel and the security of the track transportation system (four-track and two-lane for the right side and double-track and single lane for the left side) are presented. This system is highly feasible and has achieved good economic returns and social benefits.
LI Jian-Jun,
Zheng-Jie-
.Case Study of Scheduling Technology for the Hoist Transportation Systemof a Large Angle Inclined Shaft[J] MODERN TUNNELLING TECHNOLOGY, 2011,V48(5): 159-162