Abstract:
Water stop construction technology for construction joints and settlement joints in tunnel linings is currently one of the sensitive problems in the construction of waterproofing and water drainage. This paper discusses the connection method, joint strength, and embedded depth of water stops, as well as the fixing and protecting of their exposed height. It also presents water stop construction technology for lining sections with and without reinforcement.