Abstract:
The construction of the Humaling tunnel in a water-rich fine-sand stratum was very difficult and highly risky. To guarantee construction quality and safety, it was necessary to select the construction method carefully and perform numerous tests to determine the appropriate construction technology and measures for this situation.
.On Construction Methods and Measures for the Humaling Tunnel in Water-Rich Tertiary Silty Fine Sand with Low Permeability[J] MODERN TUNNELLING TECHNOLOGY, 2013,V50(2): 158-163