Construction Techniques of Shallow and Uneven-pressured Xinzhai Tunnel Entrance
(Construction Headquarters of Lanzhou-Chongqing Railway, China Railway No.13 Construction Bureau Group Co., Ltd.,
Dangchang  748500)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Xinzhai tunnel is embedded in fold system of West Qinling with developed joints and broken rocks. The entrance section of it locates on the left margin of landslip with a minimum overburden of 13~18m, and a gully was developed at the left side of tunnel portal. It is difficult for the safe construction under the condition of uneven pressure, shallow overburden and soft rock. The whole working process has been recorded, analyzed and summarized in detail based on the  Xinzhai tunnel practice with experience accumulated to serve guidance for similar projects.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LIU Yu-Qing
Jiang-Jun-Feng
Shao-Da-Peng
Zeng-You-Ping
Zheng-Yun-Cheng
Keywords Tunnelling   Shallow depth and uneven presssure   Construction technique     
Abstract: Xinzhai tunnel is embedded in fold system of West Qinling with developed joints and broken rocks. The entrance section of it locates on the left margin of landslip with a minimum overburden of 13~18m, and a gully was developed at the left side of tunnel portal. It is difficult for the safe construction under the condition of uneven pressure, shallow overburden and soft rock. The whole working process has been recorded, analyzed and summarized in detail based on the  Xinzhai tunnel practice with experience accumulated to serve guidance for similar projects.
Keywords Tunnelling,   Shallow depth and uneven presssure,   Construction technique     
published: 2011-03-05
Cite this article:   
LIU Yu-Qing, Jiang-Jun-Feng, Shao-Da-Peng etc .Construction Techniques of Shallow and Uneven-pressured Xinzhai Tunnel Entrance[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(2): 87-93
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I2/87
 
No references of article
[1] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
[2] HAN Yuxuan1 LENG Xiqiao2,3 YAN Jinxiu4 ZHANG Rui5.Construction Technology for the Shaft of Extra-long Micangshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 133-138
[3] KONG Qingxiang ZHAI Renfeng.Some Issues Concerning Construction of High Speed Railway Tunnels and Corresponding Countermeasures:A Case Study of Beitaizi Tunnel on the Beijing-Shengyang Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 166-171
[4] WANG Bo-1, GUO Xin-Xin-1, HE Chuan-1, WU De-Xing-2.[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 1-10
[5] ZHOU Baosheng.Optimized CRD Construction Techniques for a Super-Shallow Bored Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 186-190
[6] AN Yonglin1 OUYANG Pengbo1 PENG Limin2 WU Bo3 HU Wenxuan1.Construction Techniques and Safety Analysis for a Deep Vertical Shaft and Vertical Shaft Shifting to Main Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 164-173
[7] Einar Broch.Tunnels and Underground Works for Hydropower Projects[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 1-12
[8] .Construction Techniques for a Shallow-Buried Tunnel with a Large Section in Hard Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 190-194
[9] SONG Zhirong.Raise Construction Techniques for Inclined Ventilation Shaft of the Long, Deep- Buried Erlangshan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 202-206
[10] WU Quan-Li- 1, 2 Wang-Meng-Shu- 1 Zhu- Lei- 3 Dong-Xin-Ping- 3 Sun-Zheng-Yang- 4.Construction Technology for the Shield Tunnel Passing under the Existing Metro Line at the Launching End[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 134-142
[11] ZHANG Yintao.Construction Techniques for and Cost Analysis of Secant Piles for the Pre-Reinforcement of Tunnels in Sand Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 195-201
[12] .Key Construction Techniques for Urban Underwater Bored Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(2): 9-16
[13] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
[14] Lin Xin1, Shu Heng1, Zhang Yaguo2, Yang Linsong1, Li Jin1, Guo Xiaohong1.Study of the Longitudial Profile Optimization of Large-Diameter Shield Tunnels in Mixed Ground with Very High Water Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 7-14
[15] Yao Zhanhu1, Yang Zhao2, Tian Yi1, Hu Huitao1.Key Construction Technology for the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 15-23
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY