Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2011, Vol. 48 Issue (2) :94-98    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Construction Techniques of West Qinling Tunnel to Traverse F54 Fault
(Headquarters of Lanzhou-Chongqing Railway, China Railway No.18 Construction Bureau Co., Ltd., Wudu  746041)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract The geological structure of surrounding rocks of super-long West Qinling tunnel is complex and the tunnel is located in the area of high ground stresses with developed faults. The paper introduces the geological characteristics and regulations of stress variation of the fault  based on the tunnel driving through F54 fault, describes the construction method and support parameters of the project.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
GAO Wen-Shan
Keywords Super-long tunnel   Fractured zone   Construction technique     
Abstract: The geological structure of surrounding rocks of super-long West Qinling tunnel is complex and the tunnel is located in the area of high ground stresses with developed faults. The paper introduces the geological characteristics and regulations of stress variation of the fault  based on the tunnel driving through F54 fault, describes the construction method and support parameters of the project.
Keywords Super-long tunnel,   Fractured zone,   Construction technique     
published: 2010-03-10
Cite this article:   
GAO Wen-Shan .Construction Techniques of West Qinling Tunnel to Traverse F54 Fault[J]  MODERN TUNNELLING TECHNOLOGY, 2011,V48(2): 94-98
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2011/V48/I2/94
 
No references of article
[1] ZHOU Song1 PAN Yue1,2 LIU Yongsheng1,2 XIE Tao1.Mechanical Behavior Analysis and Construction Optimization for Inclined Shaft Transitioning to Main Tunnel in Extreme-highly Stressed and Fractured Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 142-150
[2] YU Yu QI Chun YANG Jianmin LUO Lusen.Progress and Prospect of Loess Tunnel Construction Technology[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 80-89
[3] SHEN Zhijun1,2 YAO Zhiwen1 ZHENG Yuchao1 QIU Wenge1 AI Xufeng1.Key Technologies for Design and Construction of Horseshoe-Shaped Shield Used in Baicheng Tunnel on Menghua Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 254-262
[4] LIU Guoqiang.Study on Two-bench Construction Method with Rapid Ring Closure under the Condition of Large Soft Rock Deformation in Yuelongmen Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 252-258
[5] LIU Zhi1 ZHONG Changping2.Research on Key Technologies for Tunnelling in Faulted Fracture Zones by Slurry Balance Shields with Super Larg[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 225-232
[6] WANG Mingjiang1 CI Xinhang2 CHEN Junwu3 ZHU Changjiang1 YANG Feng2.Construction Technology for the Shallow Twin-tube Six-lane Multi-arch Tunnel without Middle Drift under Large Unsymmetrical Loading[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 241-248
[7] DONG Jiansong.Construction Technology of Xiamen Haicang Subsea Tunnel Crossing Weathered Trough[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 197-203
[8] ZI Xiaoyu1 SHEN Yusheng1 ZHU Shuangyan1 LUO Ningning2 YANG Jiaqi1 CAO Bangjun1.Study on the Deformation Failure Laws and Support Measures for Tunnels in Layered Phyllite[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 196-204
[9] ZHU Weibin1,2 ZHONG Changping3 MI Jinsheng1 HUANG Weiran4.Challenges and Prospects of Construction Technology for Extra-large Diameter Composite Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 6-16
[10] LIU Hui1 LI Yanqing2.Study on the Construction Technology for EPB Shield Crossing under Dense Buildings in Upper-soft and Lower-hard Stratum with Shallow-buried Depth[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 186-192
[11] TIAN Ruizhong.Mined Construction Technology of Tunnel Group at the Junction of Metro Main line and Connection Line in Karst Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 193-199
[12] GUO Qingjun.Countermeasures and Construction Optimization against the Water Inrush Event in a Water-rich Tunnel Section[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 219-223
[13] LU Andian1 XIAO Hui2 SHEN Xiang2 FU Yanbin2.Design and Construction Technology of Slurry Shield Used in Shiziyang Water Conveyance Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 226-231
[14] LIU Yi1 ZHANG Yong1 PENG Zhen1 CHEN Jiawei2 LI Yuanhai.Vertical Roof Ripping Construction Techniques for Excavation of Main Tunnel from Inclined Shaft: A Case Study of the Large-span Metro Tunnel in Soft Surrounding Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 201-207
[15] LIU Feixiang1,2.SCDZ133 Intelligent Multi-function Trolley and Its Application in Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 1-7
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY