Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2012, Vol. 49 Issue (5) :79-84    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis and Research of a New Tunnel Over-passing an Existing Railway Tunnel with Short Distance
Beijing General Municipal Engineering Design & Research Institute
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on the engineering practice of a new tunnel crossing an existing railway tunnel with short distance, this article analyzes such restricted conditions as external factors, engineering geology, and supporting structure of the existing railway tunnel. It presents three schemes; makes a comprehensive comparison of numerical analyses, engineering features, and requirements; and ultimately recommends and open-cut tunnel scheme.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords:   
Abstract: Based on the engineering practice of a new tunnel crossing an existing railway tunnel with short distance, this article analyzes such restricted conditions as external factors, engineering geology, and supporting structure of the existing railway tunnel. It presents three schemes; makes a comprehensive comparison of numerical analyses, engineering features, and requirements; and ultimately recommends and open-cut tunnel scheme.
Keywords:   
Cite this article:   
.Analysis and Research of a New Tunnel Over-passing an Existing Railway Tunnel with Short Distance[J]  MODERN TUNNELLING TECHNOLOGY, 2012,V49(5): 79-84
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2012/V49/I5/79
 
No references of article
[1] HU Zhinan1 MAO Hongtao1 LIU Zhichun1 LIU Zhanliang2 MENG Xiangfei3.Study on the Impact of Foundation Pit Construction on the Deformation of Operating Metro Tunnels and Impact Zoning[J]. MODERN TUNNELLING TECHNOLOGY, 2025,62(1): 66-73
[2] ZHANG Mingshu1 YAO Chen1 WU Xianguo2 CHEN Hongyu3 FENG Zongbao2 YANG Sai2.Deformation Prediction and Control for Shield Tunnelling Passing under Existing Tunnels Based on BO-Adam-Bi-LSTM[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(6): 92-99
[3] LIU Liying1 YANG Chunshan1 YU Zhiyuan2 OU Zhenfeng1.Mechanical Response and Resilence Evolution Characteristics of Tunnel Structures under Additional Loads[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(5): 167-173
[4] LIU Shihao1 SONG Zhanping1,2,3 XU Leilei4 XIA Zhenzhao5 WANG Junbao1,2,3.Optimization of Method Statement for Low-carbon Tunnel Construction Based on SVM-MAUT[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 68-79
[5] ZHOU Jie1 XI Jinzhou1 LI Haiqing1 YU Li2 TANG Langzhou2.Analysis Method for Deformation of Existing Tunnel Induced by Tunnel Anchor Excavation and Support[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(6): 120-129
[6] HUANG Peng1,2 WEI Liangwen1,2 ZHANG Xuefu1,2.Study on Reinforcement of Large Arch Foot of Mined and Overlapped Metro Transfer Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 137-147
[7] WEI Gang1,2 ZHAO Deqianlin1 HUANG Rui1.A Review of Model Test Studies on the Impact of Shield Construction on Adjacent Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 1-8
[8] YANG Jian1,2.Comparison and Selection of Construction Methods for Changsha-Ganzhou High-speed Railway Tunnel Section Adjacent to the Runway of Huanghua Airport[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 118-126
[9] WANG Chaodong1 LAI Peng′an1 CAO Yang2 YANG Sheng2.Model Test Study on the Influence of the Close Crossing Angles of Overlapped Shield Tunnels on Existing Tunnels in Coastal Soft Soils[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 168-174
[10] LIU Yi1,2 HE Zuhao1,3 WANG ZhiMin1 MA Chao1,2 LIU Wen1,3.Research on Roof-ripping Construction Technology for Tunnels under Fractured Surrounding Rock Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 200-206
[11] ZHOU Zhong CHEN Yun MIAO Linwu. Study of Equivalent Layered Method Based Prediction Model for Deformations Caused by Construction of New Tunnels Undercrossing Existing Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 99-103
[12] YAO Xiaoming1 SHU Bo2 LI Bo.Safety Control Technology for the Newly Constructed Shield Tunnels Approaching Existing Metro Lines Underneath[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 243-
[13] TANG Xie1 LIN Guojin1, 2 HE Jia1 WANG Jun1.Design and Practice of Auxiliary Construction Scheme for Micangshan Tunnel Using Ventilation Shaft[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(4): 12-19
[14] LIU Jianguo XU Tianhua SONG Chengpeng.Construction Techniques of Shield Tunnels Approaching Existing Metro Tunnels in Soft Ground at Seafront Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 160-167
[15] WANG Fei HU Lixue HU Yongzhan.Study on Disease Causes and Rehabilitation Schemes for the Taoping Tunnel on Houma-Yueshan Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 192-199
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY