Technical Study of a Bored Tunnel Passing Under an Existing Subway Station
(China Railway Southwest Research Institute Co. Ltd., Chengdu 611731)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Three tunnels of the Guangzhou Metro Line 6 will pass under the Guangzhou Metro Line 2 and the running tunnel at the Haizhu Square Station, which makes construction extremely difficult due to the small vertical distance between these structures. In this paper, the overall construction principle and scheme is presented in light of the spatial relationship of the bored tunnels of the Zhuhai Square Station and the existing Guangzhou Metro Line 2 and the engineering hydrogeological conditions. The detailed construction and monitoring techniques for the platform tunnel of the left bore and the running tunnels of both the left and right bores passing under the existing Line 2 are described. Ultimately, the bored tunnels passed through the existing Guangzhou Metro Line 2 safely and smoothly, ensuring the safety of surrounding buildings and normal operation of the Guangzhou Metro Line 2.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HUANG Zuo-Qiong
Keywords Guangzhou Metro   Bored tunnel   Passing through existing line   Construction Safety   Construction monitoring     
Abstract: Three tunnels of the Guangzhou Metro Line 6 will pass under the Guangzhou Metro Line 2 and the running tunnel at the Haizhu Square Station, which makes construction extremely difficult due to the small vertical distance between these structures. In this paper, the overall construction principle and scheme is presented in light of the spatial relationship of the bored tunnels of the Zhuhai Square Station and the existing Guangzhou Metro Line 2 and the engineering hydrogeological conditions. The detailed construction and monitoring techniques for the platform tunnel of the left bore and the running tunnels of both the left and right bores passing under the existing Line 2 are described. Ultimately, the bored tunnels passed through the existing Guangzhou Metro Line 2 safely and smoothly, ensuring the safety of surrounding buildings and normal operation of the Guangzhou Metro Line 2.
Keywords Guangzhou Metro,   Bored tunnel,   Passing through existing line,   Construction Safety,   Construction monitoring     
published: 2013-11-24
Cite this article:   
HUANG Zuo-Qiong .Technical Study of a Bored Tunnel Passing Under an Existing Subway Station [J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(2): 133-139
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2014/V51/I2/133
 
No references of article
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY