Key Techniques of the Arch-Cover Method for Bored Metro Stations
(China Construction Communications Engineering Group Co., Ltd., Beijing 100161)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Considering the great strength and stability of medium weathered slate, the innovative arch-cover method was successfully adopted for the first time in construction of the large-span shallow-buried bored metro stations of the Dalian metro project. Based on the design and construction of the Zhongshan Square station, the core concept and advantages and disadvantages of the arch-cover method are compared with the PBA method in this paper. After completion of the primary support at the arch, the three different construction sequences of top-down, semi-top-down and semi-bottom-up, and bottom-up were analyzed and compared in detail from the aspects of safety, quality, progress, and additional measures. Results show that the top-down method was undoubtedly the most reliable when experience and relevant data are lacking. Countermeasures against construction problems, such as a large arch spring, arch support, medial plate, drill-blasting, and steel pipe column protection, as well as surrounding rock support for the high side wall, are put forward. Finally, the optimization suggestion of the arch-cover method is presented.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
��Bo
Keywords�� Metro station   Arch-cover method   Key techniques     
Abstract�� Considering the great strength and stability of medium weathered slate, the innovative arch-cover method was successfully adopted for the first time in construction of the large-span shallow-buried bored metro stations of the Dalian metro project. Based on the design and construction of the Zhongshan Square station, the core concept and advantages and disadvantages of the arch-cover method are compared with the PBA method in this paper. After completion of the primary support at the arch, the three different construction sequences of top-down, semi-top-down and semi-bottom-up, and bottom-up were analyzed and compared in detail from the aspects of safety, quality, progress, and additional measures. Results show that the top-down method was undoubtedly the most reliable when experience and relevant data are lacking. Countermeasures against construction problems, such as a large arch spring, arch support, medial plate, drill-blasting, and steel pipe column protection, as well as surrounding rock support for the high side wall, are put forward. Finally, the optimization suggestion of the arch-cover method is presented.
Keywords�� Metro station,   Arch-cover method,   Key techniques     
published: 2013-08-26
Cite this article:   
��Bo .Key Techniques of the Arch-Cover Method for Bored Metro Stations[J]  MODERN TUNNELLING TECHNOLOGY, 2014,V51(3): 181-187
URL:  
http://www.xdsdjs.com/EN/      ��     http://www.xdsdjs.com/EN/Y2014/V51/I3/181
��
No references of article
[1] LI Jidong1,2 YOU Xinhua1.Seismic Response of the Metro Station with Pre-constructed Pipe-roof Integrating Support and Structure under Strong Earthquake Effect[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 72-78
[2] SHANG Youlei1 TAN Zhun2.Optimization of Mined Construction Method for the Super-large Section Liuhualu Station of Guangzhou Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(3): 177-185
[3] YANG Jihua1 LIANG Guohui2 CAO Jianfeng2 YANG Fengwei1.Study on Key Techniques for TBM1 Section of the Water Conveyance Tunnel of Lanzhou Water Source Construction Project[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 10-17
[4] ZHANG Weibiao.Drill-blast Excavation and Vibration Control of the Large-section Metro Station in Urban Areas[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 185-191
[5] TANG Xiaorong1 ZHANG Liqun2 GUO Xi1 SHI Jinhui1 SUN Bole3.Research on Comprehensive Construction Technology for Retaining Structure of Special-shaped Deep Foundation Pit in Inclined Hard Rock[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(1): 205-208
[6] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 115-123
[7] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 166-173
[8] HU Haorui1 ZHAO Lifeng2 SUN Guangchen3,4 Yang Junsheng3.Application of a Steel Reception Sleeve for Shield Arriving in the Water-Rich
Sandy Stratum of the Suzhou Subway
[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 197-203
[9] ZENG Shaowu1 LI Changning2 ZHANG Xuegang1.Application of BIM Technology in the Construction Management of a Metro Station[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 18-27
[10] .Optimization of the Construction Scheme for a PBA Metro Station Adjacent to an Existing Metro Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(3): 176-185
[11] .On Surface Settlement during Subway Station Construction Using the Center Drift Excavation Method[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(2): 189-193
[12] ZHANG Xuegang1 ZENG Shaowu1 WANG Peng2.Application of BIM Techniques to the Construction of the Donggang Station of the Lanzhou Metro[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(2): 46-54
[13] YAN Qi-Xiang- 1 Xu-Ya-Jun- 1 Liu- Gang- 1, 2 He-Shou-Hai- 3.Study on the Construction Mechanical Behaviors of a Subway Station by PBA Method and Optimization of the Load-Structure Model[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 165-173
[14] SONG Li.Key Techniques for Construction of the Taiyue Mountain Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(5): 194-199
[15] ZENG Lei- 1 Wang-Shao-Fei- 2, 3 He-Xu-Chun- 2, 3 Ruan-Zhi-Min- 2, 3.Concept, Architecture and Key Techniques of Smart Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 1-8
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY