Analysis on Ground Surface Deformation and Influence of Construction Parameters Caused by Two Different Shield Machines in Double-tube Tunnelling
(1. Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015; 2. School of Civil Engineering, Shaoxing University, Shaoxing 312000; 3. School of Civil and Environmental Engineering, University of Macau, Macau 999078; 4. Hongrun Construction Group Co., Ltd., Shanghai 202035)
Abstract Based on a shield-driven running tunnel project of Hangzhou Metro Line 2, this paper carries out field measuring of the ground surface deformation caused by two different shield machines in double-tube tunnelling in soft soil areas, obtains the laws of the surface deformation caused by shield-driven double-tube tunnelling and verifies the applicability of the modified Peck formula to double-tube tunnelling. The results show that in soft soil areas the impacts on ground surface deformation caused by different shield construction parameters in the previously and subsequently excavated tunnels are different, while the surface deformation changes sharply before and after the shield machine passing through the cutting face, and a rebound phenomenon occurs when the shield tail passes through the cutting face due to the influence of the grouting; The cutterhead torque of the shield machine in soft soil areas can be composed of five calculation factors, and the calculation results are in good agreement with the measured values. The larger the opening rate of the shield cutterhead is, the larger the average torque value will be, the higher the percentage of large ground loss rate will be, and the larger the maximum ground surface settlement will be; The ratio of cutterhead torque T to mucking volume per ring Q is used as the control parameter for analyzing the ground surface settlement, and a certain positive correlation between the ratio and the surface settlement value is determined, the smaller the cutterhead opening rate is, the more accurate the fitting results will be.
Abstract:
Based on a shield-driven running tunnel project of Hangzhou Metro Line 2, this paper carries out field measuring of the ground surface deformation caused by two different shield machines in double-tube tunnelling in soft soil areas, obtains the laws of the surface deformation caused by shield-driven double-tube tunnelling and verifies the applicability of the modified Peck formula to double-tube tunnelling. The results show that in soft soil areas the impacts on ground surface deformation caused by different shield construction parameters in the previously and subsequently excavated tunnels are different, while the surface deformation changes sharply before and after the shield machine passing through the cutting face, and a rebound phenomenon occurs when the shield tail passes through the cutting face due to the influence of the grouting; The cutterhead torque of the shield machine in soft soil areas can be composed of five calculation factors, and the calculation results are in good agreement with the measured values. The larger the opening rate of the shield cutterhead is, the larger the average torque value will be, the higher the percentage of large ground loss rate will be, and the larger the maximum ground surface settlement will be; The ratio of cutterhead torque T to mucking volume per ring Q is used as the control parameter for analyzing the ground surface settlement, and a certain positive correlation between the ratio and the surface settlement value is determined, the smaller the cutterhead opening rate is, the more accurate the fitting results will be.
DING Zhi1,
2 FENG Conglie1,
2 QIU Shuo1 LU Zhao3 FAN Juncong4
.Analysis on Ground Surface Deformation and Influence of Construction Parameters Caused by Two Different Shield Machines in Double-tube Tunnelling[J] MODERN TUNNELLING TECHNOLOGY, 2022,V59(1): 183-194