Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2023, Vol. 60 Issue (4) :222-228    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Study on Ventilation Technology for Long-distance TBM Construction in Railway Tunnels
(China Railway First Survey and Design Institute Group Co., Ltd., Xi'an 710043)
Download: PDF (2852KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract With the increase of the ventilation length, the ventilation resistance along the tunnel and the air leakage rate of the air pipe gradually increase, resulting in a harsh construction environment in TBM tunnelling, seriously endangering the safety of personnel during construction. In view of this, various research methods such as on-site measurement, data investigation and theoretical analysis are used to clarify the ventilation control standards for long-distance TBM construction in railway tunnels, which cover multiple indicators such as air supply volume, ventilation speed and sanitary safety, etc. When the ventilation length exceeds the dead-end ventilation limit distance of single fan, it is recommended to use the dead-end forced ventilation or combined ventilation scheme with an increase in the number of fans, and provide corresponding method for dividing the scheme phases. Appropriate improvement measures are developed based on potential issues that may arise during the three phases of combined ventilation. Based on the construction of the Zhongtianshan Super-long Tunnel Project, a combined ventilation scheme during tunnel construction is determined. The specific fan design is given through theoretical calculations of air volume and ventilation resistance. According to the field test results of ventilation speed, air temperature and harmful gases in the three phases of combined ventilation, it is recommended to optimize the ventilation effect by taking measures such as repairing air pipes and improving the TBM ventilation system.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
DUO Shengjun
KeywordsRailway tunnels   TBM   Long-distance construction   Ventilation technology     
Abstract: With the increase of the ventilation length, the ventilation resistance along the tunnel and the air leakage rate of the air pipe gradually increase, resulting in a harsh construction environment in TBM tunnelling, seriously endangering the safety of personnel during construction. In view of this, various research methods such as on-site measurement, data investigation and theoretical analysis are used to clarify the ventilation control standards for long-distance TBM construction in railway tunnels, which cover multiple indicators such as air supply volume, ventilation speed and sanitary safety, etc. When the ventilation length exceeds the dead-end ventilation limit distance of single fan, it is recommended to use the dead-end forced ventilation or combined ventilation scheme with an increase in the number of fans, and provide corresponding method for dividing the scheme phases. Appropriate improvement measures are developed based on potential issues that may arise during the three phases of combined ventilation. Based on the construction of the Zhongtianshan Super-long Tunnel Project, a combined ventilation scheme during tunnel construction is determined. The specific fan design is given through theoretical calculations of air volume and ventilation resistance. According to the field test results of ventilation speed, air temperature and harmful gases in the three phases of combined ventilation, it is recommended to optimize the ventilation effect by taking measures such as repairing air pipes and improving the TBM ventilation system.
KeywordsRailway tunnels,   TBM,   Long-distance construction,   Ventilation technology     
Cite this article:   
DUO Shengjun .Study on Ventilation Technology for Long-distance TBM Construction in Railway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(4): 222-228
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I4/222
 
No references of article
[1] XIE Miao WANG Haonan LI Siyao TIAN Bo LIU Yafeng ZHANG Hongyu.Study on TBM Tunnelling Parameters Under Ultra-small-radius Turning Conditions Based on Field Data[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 58-66
[2] ZHAO Wanqiang1 LU Junfu2 TANG Yin1 ZHENG Changqing1.Study on Risk Level Classification Method and Control Measures for Railway Tunnel Floor Heave[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 178-187
[3] LIU Dongxin1 XIAO Yuhang2 ZHOU Xiaoxiong3 GONG Qiuming1 LIU Junhao1.Study on Vibration Characterization Parameters of TBM Rock-breaking Cutterhead[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 153-162
[4] CHEN Xiwu1 QING Weichen1 LIU Guoqiang2.Construction Design for Super-large Section Tunnels in Fault Zone with High Geotress[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 204-212
[5] YUAN Chuanbao1 LU Jinlin1 TAO Yujing1 SONG Zhang1 LIU Guoqiang2.Study on Major Engineering Geological Problems of Yuelongmen Tunnel in Mountain Areas Under Complex Strong Earthquake Conditions[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(4): 188-195
[6] WANG Lichuan1,2 FU Boyi2 ZHANG Huijian2 JI Guodong1 GENG Qi3 WANG Zhengzheng4.Differences in Mechanical Responses of Granite and Limestone when Cut by TBM Disc Cutters[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 81-89
[7] YUAN Hongyun1,2 CHEN Liwei2 LIU Zhiqiang2.Method for Comprehensive Evaluation of Longitudinal Crack Defect of Lining of Single-track Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 208-216
[8] LU Junfu1 ZHANG Hongxin1 PEI Qifan2.Classification Method of Monitoring Level in Railway Tunnel Construction Phase and Its Application[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 202-208
[9] WEN Yongliang YANG Xingya HE Fei WANG Heng LU Yiqiang.Experimental Study on Influence Factors of Rock Breaking with High-pressure Premixed Abrasive Water Jet in Hard Rock Tunnel Boring Machine[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 179-185
[10] ZHANG Minqing1 XIN Weike1 JIA Dapeng1 SI Jingzhao2 WANG Huanlong3.Study and Application of Key Technical Parameters of Pre-grouting in High-pressure Water-rich Deep Shaft Face[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(6): 177-186
[11] DU Hongjin1 XIONG Hao2,3 ZHOU Hao1 ZENG Deqi4.Numerical Reconstruction of TBM Muck with Real Shape and Numerical Simulation of Muck Transfer Process[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 34-40
[12] DUAN Lian1 LI Yongheng2 WU Jianghang1.Stability Evaluation for the Lining Structures of Tunnels with Large Corrosion Areas in Sulfate Environment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 212-220
[13] ZHANG Qinglong1,2 ZHU Yanwen1 MA Rui2 YAN Dong3 YANG Chuangen3 CUI Tonghuan3 LI Qingbin2.Study on Prediction of TBM Tunnelling Parameters Based on Attentionenhanced Bi-LSTM Model[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 69-80
[14] HOU Kunzhou.Study on TBM Deviation Correction and Direction Control Based on the Deep Transfer Learning (DTL)[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 81-89
[15] ZHOU Xiaojun1 NING Yuansi2 YANG Changyu3.Design and Engineering Application of Prefabricated Structure for Secondary Lining Arch of Double-Track Railway Tunnels Constructed by the Mining Method[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(4): 204-217
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY