Experimental Study on the Muck Improvement of Earth Pressure Balance Shield Tunnelling in Water-bearing Composite Stratum
(1. Nanchang Urban Rail Group Co., Ltd., Nanchang 330038; 2. Southwest Jiaotong University, Chengdu 610031)
Download: PDF (3707KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In view of the water-bearing composite stratum of Nanchang Metro Line 4, a muck improvement test has been conducted on saturated gravelly sand and moderately weathered argillaceous siltstone, and the appropriate modifier is selected and the performance test of the modifier is carried out. Based on the slump test, permeability test and direct shear test, the reasonable addition ratio of the modifier for saturated gravel sand and moderately weathered argillaceous siltstone are determined. The indoor muck test results are applied to the on-site muck improvement to verify the rationality of the indoor muck improvement test. The results show that the performance of the modifier meets the engineering requirements when the concentration of foam agent solution is 3% and the bentonite slurry ratio is 1∶8. For saturated gravelly sand muck, the proper addition method of modifier is that the ratio of foam to bentonite slurry is 4∶1, and the addition ratio is 5%~7%. For moderately weathered argillaceous siltstone, the proper addition method of modifier is that the ratio of foam to bentonite slurry is 1∶4, the addition ratio is 10.8%~12.6%, or the addition ratio of full bentonite slurry is 9.9%~12%.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
HUANG Fengyuan1 ZHANG Kangjian2 CHEN Dengkai1 ZHANG Zhiqiang2 JIA Bin1
KeywordsEarth pressure balance shield   Water-bearing composite stratum   muck improvement   Field application     
Abstract: In view of the water-bearing composite stratum of Nanchang Metro Line 4, a muck improvement test has been conducted on saturated gravelly sand and moderately weathered argillaceous siltstone, and the appropriate modifier is selected and the performance test of the modifier is carried out. Based on the slump test, permeability test and direct shear test, the reasonable addition ratio of the modifier for saturated gravel sand and moderately weathered argillaceous siltstone are determined. The indoor muck test results are applied to the on-site muck improvement to verify the rationality of the indoor muck improvement test. The results show that the performance of the modifier meets the engineering requirements when the concentration of foam agent solution is 3% and the bentonite slurry ratio is 1∶8. For saturated gravelly sand muck, the proper addition method of modifier is that the ratio of foam to bentonite slurry is 4∶1, and the addition ratio is 5%~7%. For moderately weathered argillaceous siltstone, the proper addition method of modifier is that the ratio of foam to bentonite slurry is 1∶4, the addition ratio is 10.8%~12.6%, or the addition ratio of full bentonite slurry is 9.9%~12%.
KeywordsEarth pressure balance shield,   Water-bearing composite stratum,   muck improvement,   Field application     
Cite this article:   
HUANG Fengyuan1 ZHANG Kangjian2 CHEN Dengkai1 ZHANG Zhiqiang2 JIA Bin1 .Experimental Study on the Muck Improvement of Earth Pressure Balance Shield Tunnelling in Water-bearing Composite Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(1): 262-269
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I1/262
 
No references of article
[1] LIU Tingyu1,2 WANG Shuying1,2,3 ZHONG Jiazheng1,2.A Review of Experimental and Theoretical Studies on the Slump of Conditioned Spoils of Earth Pressure Balance Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(2): 1-13
[2] ZHANG Bangchao1 LIU Hongliang2 LEI Fengguo2 PENG Guanghuo2.On Settlement Control in Large-diameter EPB Shield Tunnelling under Civil Housing Complex in Upper-soft and Lower-hard Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 172-181
[3] XU Gongyun1 XU Wanghao1,2 YAO Zhigang1 FANG Yong1 LIU Sijin3.Analysis on Influence of Penetration Angle on Disc Cutter Impact Based on Three-dimensional RBD-DEM Coupling Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 77-84
[4] WANG Yingxue1 LUO Yang1 ZHANG Ziwei1 WANG Guoyi2 SONG Xiangshuai1.Analysis of Influence of Arc Cutterhead on Ground Settlement during EPB Shield Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 155-162
[5] CHEN Yan1 WANG Yuhao1 FANG Yong1 XU Gongyun1 ZHOU Kaige1 LIU Sijin2.Laboratory Experimental Study on the Wear of EPB Shield Cutting Tools in Sandy Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 159-166
[6] ZHANG Xun1 HE Xiongfei2,3.Study on the Effect of Foam Agent on the Main Tunnelling Parameters of Earth Pressure Balanced Shields[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 176-181
[7] WANG Leilei1 YIN Lijun1 GONG Qiuming1 LI Rui2 WU Fan1 BAN Chao1.Experimental Study on the Soil Conditioning in EPB Shield Tunnelling in the Shijiazhuang Sandy Soil Stratum[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 182-189
[8] WANG Junxiang1 XU Chenhui1 DONG Jianhua2 CHEN Sili1 KOU Haijun3 WANG Xin1.Soil Parameters Inversion and Working Face Stability Analysis for a Shielddriven Utility Tunnel in Water-rich Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 117-126
[9] LIU Hui1 LI Yanqing2.Study on the Construction Technology for EPB Shield Crossing under Dense Buildings in Upper-soft and Lower-hard Stratum with Shallow-buried Depth[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(6): 186-192
[10] YAO Xiaoming1 SHU Bo2 LI Bo.Safety Control Technology for the Newly Constructed Shield Tunnels Approaching Existing Metro Lines Underneath[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(5): 243-
[11] CAI Bao ZHU Wenhua WANG Fang.Development of a Virtual Assembly System for Cutterhead of Composite EPB Shield[J]. MODERN TUNNELLING TECHNOLOGY, 2020,57(1): 190-196
[12] ZHONG Junhui1,2 YIN Peilin1,2 LIU Jun1,2.Analysis on the Characteristics of Ground Surface Settlement Caused by EPB Shield Tunnelling in Fuzhou Soft Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 180-186
[13] CAI Binghua1 LI Zhongchao1 YU Shoulong1 LV Bingquan2 WANG Fangyan2.Experimental Study on Red Clay Conditioning for EPB Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(5): 218-227
[14] ZHOU Zhihui.Analysis and Research on the Tunnelling Technology of Compound EPB Shield Machine in High-strength Hard Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 204-209
[15] PENG Lei1,2 HE Wenmin1,2 CHANG Yawen3 KONG Lingchang3 NING Bo1 LUO Jianhua1,2.Laboratory Study of the Foaming Agent Used for EPB Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(1): 224-230
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY