Analysis of the Impact of Connecting Bolts on the Vibration Response of Shield Tunnels
(1. China Railway Eryuan Engineering Group Co., Ltd., Chengdu 610000; 2. Key Laboratory of Transportation Tunnel Engineering,Ministry of Education, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (4639KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To study the impact of bolt failure on the dynamic response of a shield tunnel to train loads and to clarify the action of linings under bolt failure, a three-dimensional refined numerical model was established based on a domestic shield tunnel project. The explicit dynamic time-history method was used to calculate and analyze the tunnel's dynamic response. The results show that: (1) Under train vibration load, the failure of segment bolts increases the peak acceleration of the tunnel's internal structure by 29.4% and the segment peak acceleration by 64.8%, indicating that bolt failure reduces the stiffness of the tunnel lining structure, thereby exacerbating the tunnel structure's dynamic response. (2) When bolts fail, the peak acceleration of the internal structure of a double-layer lining tunnel is 13.3% lower than that of a single-layer lining tunnel, and the peak acceleration of the segments is 54.1% lower, indicating that the double-layer lining shield tunnel has a weaker dynamic response under train vibration load. This shows that secondary lining can buffer the impact force of trains on the tunnel structure. (3) Under train load, the maximum peak acceleration of segments is 17.2% of the peak acceleration of the internal structure, indicating that the train load is mainly borne by the internal structure. (4) Bolt failure has almost no impact on the peak stress and displacement at the connection between segments and the internal structure, suggesting that stress and displacement at the connection point under train load are not sensitive to bolt failure. (5) The application of secondary lining reduces the peak acceleration at the connection between segments and the internal structure by 57.1%, displacement by 22.2%, and maximum principal stress by 21.4%, indicating that secondary lining can reduce the dynamic response at the connection under train load, protecting the tunnel structure.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
WANG Zhiyuan1 YANG Hao2 LIN Gang1 LIAN Zhengzhou2 YU Bo1
KeywordsShield tunnel   Train vibration   Bolt failure   Secondary lining   Dynamic response     
Abstract: To study the impact of bolt failure on the dynamic response of a shield tunnel to train loads and to clarify the action of linings under bolt failure, a three-dimensional refined numerical model was established based on a domestic shield tunnel project. The explicit dynamic time-history method was used to calculate and analyze the tunnel's dynamic response. The results show that: (1) Under train vibration load, the failure of segment bolts increases the peak acceleration of the tunnel's internal structure by 29.4% and the segment peak acceleration by 64.8%, indicating that bolt failure reduces the stiffness of the tunnel lining structure, thereby exacerbating the tunnel structure's dynamic response. (2) When bolts fail, the peak acceleration of the internal structure of a double-layer lining tunnel is 13.3% lower than that of a single-layer lining tunnel, and the peak acceleration of the segments is 54.1% lower, indicating that the double-layer lining shield tunnel has a weaker dynamic response under train vibration load. This shows that secondary lining can buffer the impact force of trains on the tunnel structure. (3) Under train load, the maximum peak acceleration of segments is 17.2% of the peak acceleration of the internal structure, indicating that the train load is mainly borne by the internal structure. (4) Bolt failure has almost no impact on the peak stress and displacement at the connection between segments and the internal structure, suggesting that stress and displacement at the connection point under train load are not sensitive to bolt failure. (5) The application of secondary lining reduces the peak acceleration at the connection between segments and the internal structure by 57.1%, displacement by 22.2%, and maximum principal stress by 21.4%, indicating that secondary lining can reduce the dynamic response at the connection under train load, protecting the tunnel structure.
KeywordsShield tunnel,   Train vibration,   Bolt failure,   Secondary lining,   Dynamic response     
Cite this article:   
WANG Zhiyuan1 YANG Hao2 LIN Gang1 LIAN Zhengzhou2 YU Bo1 .Analysis of the Impact of Connecting Bolts on the Vibration Response of Shield Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(4): 172-179
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2024/V61/I4/172
 
No references of article
[1] LIU Bo1,2 ZHENG Jinlei1,3,4 ZHANG Zhao1 MA Jianfei4.Study on Mechanical Model for Longitudinal Deformation of Existing Shield Tunnel Caused by New Tunnel Over-crossing Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 112-118
[2] LIU Xiaohui1 FENG Kun1 GUO Wenqi1 LU Xuanyi1 PENG Changsheng2 LI Jiaoyang2.Study on the Influence of Construction Methods of Internal Structures on Longitudinal Mechanical Characteristics of Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 151-160
[3] ZHU Meiheng1 CHEN Sirui2 HUANG Zhongkai2 LI Yongbo1 ZHANG Wuyu3 ZHANG Dongmei2.Study on the Deformation Law of Large-diameter Fully Prefabricated Assembled Shield Tunnels under Ground Surcharge[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 161-171
[4] PAN Xiaohai1 SHEN Yusheng1 WANG Haokang1 WANG Yanyan1 ZHANG Xinyang1 ZHANG Xi1 ZUO Leibin2.Study on Response Characteristics of the Tunnel Structure under Dislocation of Strike-slip Faults with Multiple Fracture Surfaces[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 210-220
[5] ZHOU Xiaojun.On Segmenting Design Method of Prefabricated Assembled Secondary Lining for High-speed Railway Tunnels Based on Cross-section Geometric Parameters[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 232-243
[6] CAI Guangyuan1 TANG Zeren2 CHEN Chen3 ZHU Yuanchang2 YU Pengchen3 LIU Xian2.Research and Development of Intelligent Assembly Equipment for Prefabricated Mid-partition Walls with Large Slenderness Ratios[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 275-282
[7] DENG Feng1 ZHANG Yonghui2 SUN Zhiyuan1 HU Zhiping2 XIAO Jiyong1 WANG Yongliang1.Analysis of Cracking Characteristics and Causes of Tunnel Secondary Lining in Interbedded Soft and Hard Rocks[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(4): 266-274
[8] HUANG Kan WU Qijiang DENG Xi LI Hui.Study on Loose Soil Pressure Calculation of Shield Tunnel Based on Linear Change of the Included Angle of Slip Surface[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 8-17
[9] ZHANG Yujin ZHOU Xiaojun YU Bingxin LI Xu ZHANG Chao.Study on the Partitioning Method for Prefabricated Secondary Lining in Conventional Tunnelling Based on the "Contact Friction-Beam-Joint" Model[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 35-44
[10] CHEN Libao1 FENG Kun2 SUN Wenhao1 XING Wenjie2 PAN Jin2 GENG Junyang2 WANG Junling3.Study on Numerical Simulation of Chloride Ion Erosion of Lining Segment Components under the Action of High Hydraulic Pressure[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 131-140
[11] GE Zhaoguo.Study on Impact Zoning Method and Zoning Control Technique for Construction of Large-diameter Shield Tunnel Adjacent to Viaduct Pile Foundation Group[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(3): 276-289
[12] ZHU Weibin1,2,3 MI Jinsheng2,3 WANG Hui2,3,4 ZHONG Changping1,2,3.Innovation and Prospects of Shield Tunnelling Technology in Mixed Ground[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 90-104
[13] CHEN Jian1,2,3,4 YUAN Dajun5 SU Xiuting1,2 WANG Zhikui1,2,3.Progress and Prospects of Construction Technology for Ultra-Large Diameter Underwater Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(2): 124-138
[14] BAO Xiaohua1,2,3 YUAN Huaicen1,2,3 CHEN Xiangsheng1,2,3 SHEN Jun1,2,3 GUO Jianbo4.Current Situation and Outlook of Research into Subaqueous Shield Tunnel Construction and O&M Technologies[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 16-35
[15] ZHANG Qing1 ZHEN Wenzhan1 FENG Kun2.Analysis of the Impact of Large Diameter Shield Tunnel Crossing Existing Expressway Bridge and Culvert[J]. MODERN TUNNELLING TECHNOLOGY, 2024,61(1): 137-145
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY