Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (1) :183-194    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
Analysis on Ground Surface Deformation and Influence of Construction Parameters Caused by Two Different Shield Machines in Double-tube Tunnelling
(1. Department of Civil Engineering, Zhejiang University City College, Hangzhou 310015; 2. School of Civil Engineering, Shaoxing University, Shaoxing 312000; 3. School of Civil and Environmental Engineering, University of Macau, Macau 999078; 4. Hongrun Construction Group Co., Ltd., Shanghai 202035)
Download: PDF (4362KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Based on a shield-driven running tunnel project of Hangzhou Metro Line 2, this paper carries out field measuring of the ground surface deformation caused by two different shield machines in double-tube tunnelling in soft soil areas, obtains the laws of the surface deformation caused by shield-driven double-tube tunnelling and verifies the applicability of the modified Peck formula to double-tube tunnelling. The results show that in soft soil areas the impacts on ground surface deformation caused by different shield construction parameters in the previously and subsequently excavated tunnels are different, while the surface deformation changes sharply before and after the shield machine passing through the cutting face, and a rebound phenomenon occurs when the shield tail passes through the cutting face due to the influence of the grouting; The cutterhead torque of the shield machine in soft soil areas can be composed of five calculation factors, and the calculation results are in good agreement with the measured values. The larger the opening rate of the shield cutterhead is, the larger the average torque value will be, the higher the percentage of large ground loss rate will be, and the larger the maximum ground surface settlement will be; The ratio of cutterhead torque T to mucking volume per ring Q is used as the control parameter for analyzing the ground surface settlement, and a certain positive correlation between the ratio and the surface settlement value is determined, the smaller the cutterhead opening rate is, the more accurate the fitting results will be.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
DING Zhi1
2 FENG Conglie1
2 QIU Shuo1 LU Zhao3 FAN Juncong4
KeywordsRailway tunnel   Ground surface deformation   Field test   Double-tube shield-driven tunnel   Soft soil ar? ea   Ground loss rate   Cutterhead torque     
Abstract: Based on a shield-driven running tunnel project of Hangzhou Metro Line 2, this paper carries out field measuring of the ground surface deformation caused by two different shield machines in double-tube tunnelling in soft soil areas, obtains the laws of the surface deformation caused by shield-driven double-tube tunnelling and verifies the applicability of the modified Peck formula to double-tube tunnelling. The results show that in soft soil areas the impacts on ground surface deformation caused by different shield construction parameters in the previously and subsequently excavated tunnels are different, while the surface deformation changes sharply before and after the shield machine passing through the cutting face, and a rebound phenomenon occurs when the shield tail passes through the cutting face due to the influence of the grouting; The cutterhead torque of the shield machine in soft soil areas can be composed of five calculation factors, and the calculation results are in good agreement with the measured values. The larger the opening rate of the shield cutterhead is, the larger the average torque value will be, the higher the percentage of large ground loss rate will be, and the larger the maximum ground surface settlement will be; The ratio of cutterhead torque T to mucking volume per ring Q is used as the control parameter for analyzing the ground surface settlement, and a certain positive correlation between the ratio and the surface settlement value is determined, the smaller the cutterhead opening rate is, the more accurate the fitting results will be.
KeywordsRailway tunnel,   Ground surface deformation,   Field test,   Double-tube shield-driven tunnel,   Soft soil ar? ea,   Ground loss rate,   Cutterhead torque     
Cite this article:   
DING Zhi1, 2 FENG Conglie1, 2 QIU Shuo1 LU Zhao3 FAN Juncong4 .Analysis on Ground Surface Deformation and Influence of Construction Parameters Caused by Two Different Shield Machines in Double-tube Tunnelling[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(1): 183-194
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I1/183
 
No references of article
[1] ZHANG Minqing1 JIA Dapeng1 WANG Shuishan2 GAO Cuncheng3.New Automatic Pouring and Vibrating Techniques for the Construction of Railway Tunnel Lining[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 29-34
[2] CHEN Shaohua.Study on New Structural Type of the Emergency Rescue Station of Mabaishan Tunnel in Qinling Mountains[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 35-41
[3] SUN Yi.Analysis on Gas Characteristics of the Sichuan Red-bed Section of ChengduGuiyang Railway and Suggestion on Division of Gas Working Areas in the Survey Stage[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 195-199
[4] TANG Langzhou1,2 YU Li1,2 WANG Yusuo1,2 WANG Zhuhong1,2 WANG Mingnian1,2.Numerical Analysis on the Effect of Strike-slip Fault Dislocation on the Structural Safety of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(1): 214-224
[5] FENG Jimeng1,2 JIANG Hui1,2 DING Xiaoqi1,2 YU Longping1,2 ZHANG Junru1,2.Progresses and Challenges in Research on Parallel Double-tube Tunnels Crossing Landslides[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 1-10
[6] FU Lei MA Xin SHAO Wei.Effect of Cold Water Mixing Modes on Prediction of High Geo-temperature Induced Heat Hazards in Tunnelling in South Tibet[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 21-30
[7] WANG Mingnian1,2 CUI Peng1,2 YU Li1,2 LU Xudong3 HU Xiaoyue1,2 XIA Pengxi1,2.Study on Relationship between Relative Maximum Oxygen Uptake and Personnel Evacuation Capacity Based on the Step Test[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 38-45
[8] ZHOU Xiaojun1 GUO Jian1 YANG Changyu2 QING Weichen2 XIONG Guoxing2 KUANG Wentao2.Study on the Partition Mode of Prefabricated and Assembled Secondary Lining of Double-track Railway Tunnels by Drilling and Blasting Method[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 46-58
[9] ZHANG Minqing1 XIN Weike1 JIA Dapeng1 HAN Jingyu2 WANG Baiquan2 MA Weibin3.Informatized Control System for Lining Construction of Jishou Tunnel on Zhangjiajie-Jishou-Huaihua Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 182-187
[10] LI Fuhai1 LI Rui1 JIANG Yilin1 GAO Hao1 WANG Yibin1 WANG Peixun2.Experimental Study on the Mechanical Behaviors of the Lining Structure Affected by Grouting in Tunnel Secondary Lining Cavities through Molds[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 147-158
[11] LI Bo ZHOU Bin FENG Jianjun.Application of Rayleigh Wave Method in Detection of Invert Thickness of Railway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 173-178
[12] WANG Zhijie1 LI Jinyi1 JIANG Xinzheng1 LI Zhen1 ZENG Qing2 WANG Ning2.Research on the Impact Zoning and Construction Countermeasures for Bilateral Adjacent Tunnels with Shallow Depth and Unsymmetrical Load[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 1-11
[13] GAO Lihong.Analysis of Settlement Deformation and Construction Node Control of a Double-Line Shield Tunnelling Passing under Existing Tunnel in Close Distance[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 194-202
[14] LIU Hebing.Study on the Impact of the Capacity Expansion and Renovation Project of the Chengdu-Chongqing Expressway on Xinshuangbei Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 229-234
[15] ZHANG Xiaojian1 LIANG Bo1,2 ZHONG Shengming1,3.Study on the Influence of Environmental Factors on the Brightness Value L20(S) outside Highway Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(3): 70-78
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY