Home | About Journal  | Editorial Board  | Instruction | Subscription | Advertisement | Message Board  | Contact Us | 中文
MODERN TUNNELLING TECHNOLOGY 2022, Vol. 59 Issue (2) :167-171    DOI:
Current Issue | Next Issue | Archive | Adv Search << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
On Discrimination Method and Treatment Measures for Overall Soil-carrying Effect of Shallow-buried Rectangular Pipe Jacking Projects
(1. Shanghai Road and Bridge (Group) Co., Ltd., Shanghai 200433; 2. College of Civil Engineering, Tongji University, Shanghai 200092; 3. Key Laboratory of Geotechnical and Subsurface Engineering of the Ministry of Education, Tongji University,Shanghai 200092
Download: PDF (1732KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract Friction exists between shallow-buried rectangular pipe jacking machine, pipes and soils, and when the machine has no drag reduction or anti-soil-carrying device, the substantial friction between the machine and soils will induce an overall soil-carrying effect. This paper introduces a discrimination method of overall soil-carrying effect considering the friction difference between machine (pipe) and soils. Taking the test section of the rectangular pipe jacking project between Luxiang Road and Qilianshan Road in Shanghai as the background, it carries out an analysis of the overall soil-carrying effect based on measured data, and introduces the relevant treatment measures.The results show that the method has successfully predicted the overall soil-carrying failure occurring in the test section, where the calculated critical machine (pipe)-soil friction coefficient is 0.35, the predicted maximum jacking path at the time of failure is 31.05 m (actually 34 m), and the lateral influence range of the overall soil-carrying effect occurring in the pipe jacking is approximately equal to the sum of the overburden depth and the equivalent radius of the section. Also, the influence range of heaving is about 3.0L (L is the head length), and the ground deformation shifts from heaving to settlement when the working face passes through 3.0L
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
ZHEN Liang1 ZHANG Xianyu2
3 LI Xiaojun2
3
KeywordsRectangular pipe jacking   Over soil-carrying effect   Monitoring analysis   Treatment measure     
Abstract: Friction exists between shallow-buried rectangular pipe jacking machine, pipes and soils, and when the machine has no drag reduction or anti-soil-carrying device, the substantial friction between the machine and soils will induce an overall soil-carrying effect. This paper introduces a discrimination method of overall soil-carrying effect considering the friction difference between machine (pipe) and soils. Taking the test section of the rectangular pipe jacking project between Luxiang Road and Qilianshan Road in Shanghai as the background, it carries out an analysis of the overall soil-carrying effect based on measured data, and introduces the relevant treatment measures.The results show that the method has successfully predicted the overall soil-carrying failure occurring in the test section, where the calculated critical machine (pipe)-soil friction coefficient is 0.35, the predicted maximum jacking path at the time of failure is 31.05 m (actually 34 m), and the lateral influence range of the overall soil-carrying effect occurring in the pipe jacking is approximately equal to the sum of the overburden depth and the equivalent radius of the section. Also, the influence range of heaving is about 3.0L (L is the head length), and the ground deformation shifts from heaving to settlement when the working face passes through 3.0L
KeywordsRectangular pipe jacking,   Over soil-carrying effect,   Monitoring analysis,   Treatment measure     
Cite this article:   
ZHEN Liang1 ZHANG Xianyu2, 3 LI Xiaojun2, 3 .On Discrimination Method and Treatment Measures for Overall Soil-carrying Effect of Shallow-buried Rectangular Pipe Jacking Projects[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(2): 167-171
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2022/V59/I2/167
 
No references of article
[1] XIAO Zunqun1,2,3 CAO Tongtong1 XU Caiyun1 YANG Kai2 DONG Qiongying1 JIANG Yinan1.Superposition Principle Based Numerical Estimation Method of Jacking Force of Vertical Curved Jacking Pipes with Large Rectangular Section[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(6): 68-76
[2] XU Youjun1,2 HUANG Zhengdong1,2 ZHANG Xu1,2 ZHANG Chao1,2 KANG Jiawang1,2 ZHOU Wei1.Study on Measured Torque Parameters of Large-Section Rectangular EPB Pipe Jacking Machine with Multiple Cutterheads[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(5): 96-103
[3] WU Bo1,2 PENG Yiyong1,2 MENG Guowang1,2 PU Songquan3.Analysis on Ground Surface Heaving ahead of Cutting Face Caused by Largesection Rectangular Pipe Jacking in Soft Soil Layer[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(2): 86-92
[4] LI Xiaofang1 TENG Weiliing1 ZHOU Jian2.Application of SCC-Filled Thin-Walled Steel Tube Support in Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 98-101
[5] LI Hai1 ZHAO Dapeng2 ZHU Changsong.Water Inflow Solutions for Metro Cross Passage[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(2): 201-206
[6] YANG Jihua WEI Bing QI Sanhong GUO Weixin.Key Issues in Raise Boring of Super-deep Vertical Shafts of CCS Hydropower Station in Ecuador[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(6): 183-190
[7] XU Youjun1 LIANG Weizhen1 LIU Xinmei2 CUI Guangqin1 BAI Xueguang3.Soil Mass Stability at the Working Face of a Rectangular Pipe-Jacking Tunnel with a Large Section[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 70-77
[8] WU Yong1 XU Riqing1 DUAN Jinchuan2 XU Xin3 ZHU Yihong1.Environmental Effects Caused by Construction of Rectangular Jacking Pipes with Large Section, Small Space and Shallow Overburden[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(5): 78-85
[9] .Analysis of the Interference Waveform Characteristics of Ground Penetrating Radar (GPR) for Tunnel Engineering[J]. MODERN TUNNELLING TECHNOLOGY, 2017,54(3): 32-36
[10] WANG Ming-Sheng- 1 Liu-Da-Gang- 2, 3 .Test of Thixotropic Slurry Properties and Study of Resistance-Reducing Technology for Pipe Jacking Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(6): 182-189
[11] CHEN Zhiqiang.Scheme Optimization and Monitoring Analysis for the Exit Portal Section of an Urban Double-Arch Tunnel under a Retaining Wall[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 157-163
[12] Lai Jinxing1,5, Qiu Junling1,5, Pan Yunpeng2, Cao Xiaojun3, Liu Chi1,4, Fan Haobo1,5.Comprehensive Monitoring and Analysis of Segment Cracking in Shield Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(2): 186-191
[13] DOU Ji-Ping-1, Chen-De-Jian-2.Countermeasures and Construction Technologies for Clearance Intrusion of the Primary Support in the Sujiawan Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2014,51(6): 154-159
[14] Zhang Hengxiang.Clearance-Intrusion Countermeasures with Combined Temporary
and Permanent Supports
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(3): 179-182
[15] .Analysis of Gas Occurrences in the Tunnel at Red Bed and Treatment Measures[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(1): 23-28
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY