Study on Precise Geophysical Prospecting and Processing Technique for Large-diameter Shield Tunnelling Through Coastal Boulder Strata
(China Railway 15th Bureau Group Co., Ltd., Shanghai 200070)
Download: PDF (7534KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract In this study, based on the shield tunnel project underpassing the boulder section from Hengli Station to Wanqingsha Station along the southern line of Guangzhou Metro Line 18, the boulder prospecting and the preprocessing technology are studied. In this paper, a set of precise location and prospecting technologies are proposed, in which the HSP horizontal acoustic wave/seismic wave profile method and the virtual source method are jointly used to quickly detect the development range of boulder body, and the geological drilling method is used to determine vertical and transverse boundaries of the boulder. This reduces the geological drilling and prospecting work, and then the blasting of the boulder revealed by geological drilling is allowed. The results show that the proposed boulder prospecting method is advanced and reliable, and it is allowed to detect boulders in time, reduce the prospecting cost, and shorten the construction period; in this method, the design of blasting parameters are designed reasonably,and the boulder section is processed well; the average tunnelling speed in the boulder section after blasting along left and right lines is 34.63 mm/min, which is close to the average tunnelling speed in the conventional strata.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
LU Shaozhuang ZHAO Lu GUO Zhifeng
KeywordsLarge-diameter shield   Boulder   HSP Horizontal sonic/Seismic wave profile method   Boulder blasting   Tunnelling effect     
Abstract: In this study, based on the shield tunnel project underpassing the boulder section from Hengli Station to Wanqingsha Station along the southern line of Guangzhou Metro Line 18, the boulder prospecting and the preprocessing technology are studied. In this paper, a set of precise location and prospecting technologies are proposed, in which the HSP horizontal acoustic wave/seismic wave profile method and the virtual source method are jointly used to quickly detect the development range of boulder body, and the geological drilling method is used to determine vertical and transverse boundaries of the boulder. This reduces the geological drilling and prospecting work, and then the blasting of the boulder revealed by geological drilling is allowed. The results show that the proposed boulder prospecting method is advanced and reliable, and it is allowed to detect boulders in time, reduce the prospecting cost, and shorten the construction period; in this method, the design of blasting parameters are designed reasonably,and the boulder section is processed well; the average tunnelling speed in the boulder section after blasting along left and right lines is 34.63 mm/min, which is close to the average tunnelling speed in the conventional strata.
KeywordsLarge-diameter shield,   Boulder,   HSP Horizontal sonic/Seismic wave profile method,   Boulder blasting,   Tunnelling effect     
Cite this article:   
LU Shaozhuang ZHAO Lu GUO Zhifeng .Study on Precise Geophysical Prospecting and Processing Technique for Large-diameter Shield Tunnelling Through Coastal Boulder Strata[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(5): 195-204
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2023/V60/I5/195
 
No references of article
[1] HAN Xiaoming1,2 HE Yuan1,2 ZHANG Feilei2,3,4.Study on Key Construction Technology for Cross Passages in Large-diameter Shield Tunnels in Water-bearing Silty Fine Sand Stratum:A Case Study of the Karnaphuli River Tunnel Project in Bangladesh[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(3): 227-235
[2] CAO Xiangpeng1,2 FENG Kun2 XUE Haoyun2 MAO Sheng1 YU Bo2,3.Study on Transverse Seismic Performance of Double Lining of Large Diameter Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 130-139
[3] LIU Zhi1 ZHONG Changping2.Research on Key Technologies for Tunnelling in Faulted Fracture Zones by Slurry Balance Shields with Super Larg[J]. MODERN TUNNELLING TECHNOLOGY, 2023,60(1): 225-232
[4] CUI Qinglong1 LI Jin1 GAO Binyong2 XIONG Xinyue2.Mechanical Properties of Three-inclined Bolts in Longitudinal Joint of Large-diameter Shield Tunnel Segment[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 63-71
[5] WEI Longhai1 WANG Miao2 WU Shuyuan1.Overall Design and Key Technologies of Nanjing Jianning West Road Rivercrossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(5): 228-236
[6] SUN Shuangchi1,2 SHEN Yi1 ZHOU Zhiyan2 ZHOU Long1 ZHU Hehua1.Analaysis of Deformation and Its Control Measures for Large-diameter Shield Tunnels Passing under Building Complexes[J]. MODERN TUNNELLING TECHNOLOGY, 2022,59(2): 103-110
[7] YANG Linsong1 LIU Jiguo1 SHU Heng1 WU Shidong2 SONG Ming1 LI Jin1 WANG Xuetao2,3.Centrifugal Model Test on Construction Process of a Super Large Diameter Shield Tunnel Passing under Existing Railway[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(4): 170-177
[8] WANG Mingnian1,2 HU Xiaoyue1,2 TANG Xiongjun3 DONG Yucang1,2 YU Li1,2.Study on Temperature Loads and Structural Internal Force Characteristics of Large-diameter Shield-driven Railway Tunnels in a Fire Scenario[J]. MODERN TUNNELLING TECHNOLOGY, 2021,58(1): 1-9
[9] ZHOU Wenbo WU Huiming ZHAO Jun.On Driving Strategy of the Shield Machine with Atmospheric Cutterhead in Mudstone Strata[J]. MODERN TUNNELLING TECHNOLOGY, 2019,56(4): 8-15
[10] .[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(5): 88-96
[11] LI Yue.Staggered Segments and Leakage in a Super-Large Diameter River-Crossing Shield Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2018,55(4): 42-46
[12] LIANG Yu1 YANG Junsheng1 LIN Hui2.On Segment Floating and Relevant Mechanical Behaviors during Large-Diameter Shield Tunnelling[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(3): 91-97
[13] LI Hong'an.Application and Prospect Analysis of Large-Diameter Shield-Driven Tunnels Combined with Enlarged Metro Stations[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(5): 16-23
[14] FAN Guogang.Comparison of Forces Applied on the Working Shafts of Large-Diameter Shield Tunnels by the Bottom-Up and Top-Down Methods[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(5): 158-164
[15] Tuo Yongfei, Guo Xiaohong.General Design and Key Technologies of the Nanjing Weisan Road River-Crossing Tunnel Project[J]. MODERN TUNNELLING TECHNOLOGY, 2015,52(4): 1-6
Copyright 2010 by MODERN TUNNELLING TECHNOLOGY