Characteristics of In-Situ Stress and Stability Validation
of a Fault Influence Zone
(1  Faculty of Engineering, China University of Geosciences, Wuhan  430074;
2  Key Laboratory of Geotechnical Mechanics and Engineering of the Ministry of Water Resources,
Yangtze River Scientific Research Institute, Wuhan  430010)
Download: PDF (0KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
Abstract To analyze the characteristics of the in-situ stress field of the two fault influence zones in a tunnel in the Fujian province, the hydraulic fracturing method was adopted in two boreholes near the fault influence zones in the tunnel middle section to measure the in-situ stress. The results show that the stress in the test area accords with the general rule of stress distribution, with horizontal principal stress increasing with depth, and local fractures resulting in higher or lower stress values regarding some test points. The maximum horizontal principal stresses in the two testing holes are in the same direction of NNW. The results are consistent with the regional tectonic stress field and are also close to results concerning the intact rock zone in the same region. Based on the test results, the characteristics of the in-situ stress of the test area were analyzed and the stability of the fault where the two testing holes lie was validated by adopting the lower limit of the sliding criterion.
Service
Email this article
Add to my bookshelf
Add to citation manager
Email Alert
RSS
Articles by authors
Keywords Tunnel   Fault   In-situ stress   Stability   Hydraulic fracturing method     
Abstract: To analyze the characteristics of the in-situ stress field of the two fault influence zones in a tunnel in the Fujian province, the hydraulic fracturing method was adopted in two boreholes near the fault influence zones in the tunnel middle section to measure the in-situ stress. The results show that the stress in the test area accords with the general rule of stress distribution, with horizontal principal stress increasing with depth, and local fractures resulting in higher or lower stress values regarding some test points. The maximum horizontal principal stresses in the two testing holes are in the same direction of NNW. The results are consistent with the regional tectonic stress field and are also close to results concerning the intact rock zone in the same region. Based on the test results, the characteristics of the in-situ stress of the test area were analyzed and the stability of the fault where the two testing holes lie was validated by adopting the lower limit of the sliding criterion.
Keywords Tunnel,   Fault,   In-situ stress,   Stability,   Hydraulic fracturing method     
published: 2012-06-26
Cite this article:   
.Characteristics of In-Situ Stress and Stability Validation
of a Fault Influence Zone[J]  MODERN TUNNELLING TECHNOLOGY, 2013,V50(3): 46-51
URL:  
http://www.xdsdjs.com/EN/      或     http://www.xdsdjs.com/EN/Y2013/V50/I3/46
 
No references of article
[1] YU Yun-Yan- 1 Li-Guo-Liang- 2 Zhao-De-An- 3 Chen-Zhi-Min- 1 Wei-Ming-Qiang- 3 Yin-Jian-Min- 4 Li-Yong-Song- 4.Geostress Measurement and 3D Multivariate Regression An Geostress Field of the Liangshui Tunnel[J]. MODERN TUNNELLING TECHNOLOGY, 2016,53(4): 29-36
[2] Zhang Zhigang Hu jinping Liu Hongzhou Xu Guoping.Study of the Maximum Longitudinal Gradient of Underwater Highway Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 8-14
[3] Ye Ying1,2 Sun Wenlong3 Yang Xinrui1,2 Zhang Zhiming1,2 Wang Xiaoliang1,2.Informational Early Warning Platform for Tunnel Construction[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 24-29
[4] Yu Hongjun Wang Weigao Wan Decai.Countermeasures Against Construction Risks in Gas-Rich Tunnels[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 56-62
[5] Yang Haitao.The Design and Construction Control for a Temporary Support System
in an Immersed Tunnel
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 63-67
[6] Zhang Mei1 Xu Shuangyong2 Zhang Minqing3 Xiao Guangzhi3 Ren Chengmin3.Experimental Study of Stress Release Using a Pilot Heading
for a Highly Stressed Soft-Rock Tunnel
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 68-75
[7] Wang Yanke Li Tianbin Chen Guoqing Meng Lubo Liu Liang Chen Ziquan.Experimental Study of Rock Burst Characteristics
with the PFC3D Numerical Simulation
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 98-103
[8] Li Xueping Li Yunan.GIS-Based Risk Assessment of a Water Burst in an Underwater Tunnel:
A Case Study of the Yangtze River Tunnel in Wuhan
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 104-108
[9] Zhou Xin.On the Support Mechanism of the Pre-Reinforcement System
for the L7 Deep, Weak Water-Rich Zone Passed Through
by the Liangshan Tunnel
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 138-145
[10] Tian Zhiyu Zheng Jinlong.Summary of the Design and Construction
of Tunnels Passing Through Faulted Rock Masses
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 152-157
[11] Li Jianjun.Construction Technique for a Mountain Tunnel Portal
Without Slope Cutting in Steep Terrain
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 158-163
[12] .Design and Construction of the Underpinning of a River-Crossing
Bridge Pile Foundation in a Metro Tunnel
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 164-169
[13] Sun Shaofeng1 Yuan Zhu2 Zhao Wanqiang2.Cause Analysis and Treatment Principles for Tunnel Lining Cracking
in Sandy Mudstone with High Geostress
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 170-175
[14] Wang Xiaomin1,2 Fang Yong2.Construction Ventilation Scheme for the Huayingshan Extra-Long
Tunnel on the Nanchong-Dazhu-Liangping Expressway
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(4): 188-196
[15] Zhou Wenbo.Discussion of the Application of Extra-Large Diameter EPB Shields
to Road Tunnels in Central Urban Areas
[J]. MODERN TUNNELLING TECHNOLOGY, 2013,50(3): 1-7