富水千枚岩隧道大变形特征及控制措施研究
(1.兰州交通大学土木工程学院,兰州 741300;2.甘肃省公路交通建设集团有限公司,兰州 741300; 3.山东职业学院铁道工程与土木工程学院,济南 250104;4.甘肃顺达路桥建设有限公司,兰州 741300)
Study on Large Deformation Characteristics and Control Measures of Water-rich Phyllite Rock Tunnels
(1. School of Civil Engineering, Lanzhou Jiaotong University, Lanzhou 741300; 2. Gansu Highway Traffic Construction Group Co., Ltd.,Lanzhou 741300; 3. Department of Railway Engineering and Civil Engineering, Shandong Polytechnic, Jinan 250104;4. Gansu Shunda Road and Bridge Construction Co., Ltd., Lanzhou 741300)
Download: PDF (6449KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 以黑马关富水千枚岩公路隧道为依托,对隧道大变形控制技术进行深入探讨。通过对大变形破坏特征及成因分析发现,隧址区复杂地质构造作用致使千枚岩节理发育,其矿物成分及游离氧化物在节理中迁移进一步恶化岩体的力学性质;由于千枚岩具有较强的水敏性,长期受水浸泡后软化、泥化破坏严重,富水千枚岩隧道面临围岩强度低、易发生大变形的问题。现场监测数据分析表明:隧道大变形表现出明显的不对称性,隧道下导洞开挖后变形加剧。现场采用地下水封堵、支护参数强化、跳做双层腹拱等加固措施,对富水千枚岩隧道大变形段进行处治,效果表明:采用引水封闭+双层腹拱跳做施工工艺,可有效控制千枚岩长期浸水软化导致的不对称大变形,且施工便捷、经济性更好。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
常伟学1
2 梁庆国1 李奇伟1 樊纯坛1
3 魏 健4
关键词千枚岩   大变形   监控量测   腹拱跳做   变形控制     
Abstract: Based on the Heimaguan Highway Tunnel in water-rich phyllite rocks, this study delves into the control technology for tunnel rock large deformation. Through analysis of the characteristics and causes of large deformation and failure, it is found that the complex geological tectonism in the tunnel area leads to the development of rock joints in the phyllite, and the migration of mineral components and free oxides in the joints further deteriorate the mechanical properties of the rock mass. Due to the strong sensitivity to water, the phyllite rock softens and disintegrates severely after long-term water immersion, resulting in low surrounding rock strength and susceptibility to large deformations in the tunnel. Field monitoring data analysis shows that the tunnel's large deformations exhibit significant asymmetry, and the deformations worsen after the excavation of the lower heading. Reinforcement measures such as sealing of groundwater, optimization of support parameters, and alternate construction of local double arch have been carried out to deal with the large deformation section in the water-rich phyllite rock tunnel. The results indicate that using the construction technology of discharging and sealing water as well as alternative construction of double-layer arch can effectively control the asymmetric large deformations caused by softening of the phyllite rock by long-term water immersion and it is more convenient and economical.
KeywordsPhyllite rock,   Large deformation,   Monitoring and measurement,   Alternate construction of local double arch (LDA),   Deformation control     
基金资助:国家自然科学基金(51968041);甘肃省优秀研究生“创新之星”项目(2022CXZX-531);兰州交通大学/百名青年优秀人才培养计划;甘肃路桥建设集团有限公司科研项目(2023-KLZCB-QT27).
作者简介: 常伟学(1992-),男,博士研究生,主要从事岩土与隧道施工方面研究工作,E-mail: 764690185@qq.com. 通讯作者:梁庆国(1976-),男,博士,教授,博士生导师,主要从事岩土与隧道工程方面的教学与研究工作,E-mail: lqg_39@163.com.
引用本文:   
常伟学1, 2 梁庆国1 李奇伟1 樊纯坛1, 3 魏 健4 .富水千枚岩隧道大变形特征及控制措施研究[J]  现代隧道技术, 2024,V61(3): 236-244
CHANG Weixue1, 2 LIANG Qingguo1 LI Qiwei1 FAN Chuntan1, 3 WEI Jian4 .Study on Large Deformation Characteristics and Control Measures of Water-rich Phyllite Rock Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(3): 236-244
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I3/236
 
没有本文参考文献
[1] 王建宇.“对抗”还是“屈让”?——围岩挤压性大变形处治的基本理念[J]. 现代隧道技术, 2024,61(3): 1-7
[2] 浣宇翔1 田礼勇2 杨文波1 李昊豫1 刘 勇3 唐 浩3 姚超凡1.软岩大变形隧道支护拆换力学与时空变形行为研究[J]. 现代隧道技术, 2024,61(3): 96-107
[3] 朱建林1 王立川2,3 刘志强1 马利遥2,3 李庆斌2.考虑流变效应的软岩大变形隧道多层支护作用机理分析[J]. 现代隧道技术, 2024,61(3): 18-24
[4] 陈志敏1 王 洪1 龚 军2 李增印2 彭 易1.高地应力软岩隧道双层初期支护围岩变形特征[J]. 现代隧道技术, 2024,61(3): 85-95
[5] 杨赵峰1 汪 波2 杜永全1 黄长宽1 樊 勇1.主动支护技术在海东隧洞软岩大变形中的应用[J]. 现代隧道技术, 2024,61(3): 245-252
[6] 郝翊杰1 李 刚2 沈 丹3 邓有为1 刘怡阳1.基于改进YOLOv5的隧道围岩沉降自动识别与实时测量技术研究[J]. 现代隧道技术, 2023,60(5): 58-66
[7] 刘家民 1 杨 枫 2 李晓洪 2 马洪生 2.汶马高速公路鹧鸪山隧道非煤地层瓦斯赋存特性与风险防控研究[J]. 现代隧道技术, 2023,60(4): 172-177
[8] 宋 艺 1,2.复杂环境高铁咽喉区隧道下穿机场段结构设计研究[J]. 现代隧道技术, 2023,60(4): 213-221
[9] 袁传保 1 鲁金林 1 陶玉敬 1 宋 章 1 刘国强 2.复杂强震山区跃龙门隧道重大工程地质问题研究[J]. 现代隧道技术, 2023,60(4): 188-195
[10] 陶玉敬 1 袁传保 1 王茂靖 1 宋 章 1 刘国强 2.成兰铁路跃龙门隧道深埋越岭段大变形原因分析研究[J]. 现代隧道技术, 2023,60(4): 229-236
[11] 刘国强.跃龙门隧道软岩大变形两台阶快速成环法施工技术研究[J]. 现代隧道技术, 2023,60(3): 252-258
[12] 魏力峰 1 田 扬 1 朱牧原 1 邹坤秘 2 方 勇 1.大直径双模盾构浅覆土无障碍始发变形控制研究[J]. 现代隧道技术, 2023,60(2): 149-158
[13] 路军富 1 张宏鑫 1 裴起帆 2.铁路隧道施工阶段监测等级划分方法及应用[J]. 现代隧道技术, 2023,60(1): 202-208
[14] 张建峰 1 郑晓悦 2 于国亮 1 施成华 2.富水炭质千枚岩隧道突涌水灾变机制及防控措施研究[J]. 现代隧道技术, 2022,59(5): 221-227
[15] 于国亮 1 娄义黎 2,3 吴国鹏 1 施成华 2,3 郑可跃 2,3.高地应力下顺层偏压隧道开挖变形控制技术研究[J]. 现代隧道技术, 2022,59(5): 237-245
Copyright 2010 by 现代隧道技术