现代隧道技术 2020, Vol. 57 Issue (6) :8-16    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
隧道下穿高速铁路路基风险分级及风险评价方法研究
(1中铁工程设计咨询集团有限公司,北京 100035;2 中国铁路经济规划研究院,北京 100844;3 华东交通大学理工学院,南昌 330100)
Research on Risk Classification and Assessment Method for Tunnels Crossing under High-speed Railway Subgrade
(1 Railway Engineering Consulting Group Co., Ltd, Beijing 100035; 2 China Railway Economic and Planning Research Institute,Beijing 100844; 3 Institute of Technology, East China Jiaotong University, Nanchang 330100)
Download: PDF (3549KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 隧道下穿高速铁路路基的安全风险主要取决于隧道施工引起的扰动范围和高速铁路路基的承载范围,根据高速铁路路基荷载在土层中附加应力的分布特征,将高速铁路路基承载区域划分为主承载区、次承载区和无承载区,根据隧道施工引起围岩的扰动特征,将隧道周边划分为松动区、扰动区和未扰动区,根据高速铁路路基承载分区和隧道扰动分区的位置关系进行下穿工程的风险分级,并确定下穿工程对高速铁路影响范围以及高速铁路影响的隧道区间范围。该方法成功应用于北京地铁14号线马家堡东路站—永定门外大街站区间隧道下穿京津城际铁路工程中。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
刘建友 1 赵 勇 2 吕 刚 1 刘淑芬 3 刘春晓 1
关键词:   
Abstract: As for a tunnel crossing under the high-speed railway subgrade, the safety risk depends mainly on the disturbance caused by tunnel construction and the load bearing range of high-speed railway subgrade. According to the distribution characteristics of the additional stress in the soil layer of the high speed railway subgrade, it divides the load bearing area of the high speed railway subgrade into the main load bearing area, the secondary load bearing zone and the non-load bearing zone. According to the disturbance characteristics of the surrounding rock caused by the tunnel construction, it divides the tunnel surroundings into the loose, disturbed and unperturbed areas. According to the location relationship between the load bearing zone of the high-speed railway subgrade and the disturbance zone of the tunnel, the risk classification of the under-crossing tunnel project is carried out. The influence range of the under passing tunnel on the high-speed railway and the influenced tunnel section due to the high-speed railway are determined. The method has been successfully applied to the risk assessment of the running tunnel from Majiapu East Road station to Yongding Menwai Street station on Beijing Metro Line 14, which passes under Beijing-Tianjin intercity railway.
KeywordsTunnel,   Passing underneath,   High-speed railway,   Subgrade,   Risk assessment     
作者简介: 作者简介:刘建友(1982-),男,博士,高级工程师,主要从事隧道及地下工程的设计和研究工作,E-mail: 13522182378@163.com
引用本文:   
刘建友 1 赵 勇 2 吕 刚 1 刘淑芬 3 刘春晓 1 .隧道下穿高速铁路路基风险分级及风险评价方法研究[J]  现代隧道技术, 2020,V57(6): 8-16
LIU Jianyou1 ZHAO Yong2 LV Gang1 LIU Shufen3 LIU Chunxiao1 .Research on Risk Classification and Assessment Method for Tunnels Crossing under High-speed Railway Subgrade[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(6): 8-16
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I6/8
 
没有本文参考文献
[1] 范 磊 杨昌宇.特长铁路隧道超深竖井模式下防灾疏散及救援技术研究[J]. 现代隧道技术, 2020,57(6): 1-7
[2] 常银生 1,2 吕 乐 1 王敬敬 1,3 王旭东 1.考虑基础埋深的隧道开挖对邻近建筑物损坏程度评价[J]. 现代隧道技术, 2020,57(6): 17-24
[3] 刘星宏 1 林达明 2 俞 缙 3 丘仁科 4 苏兴炬 4 楼重华 5 王 辉 6 张中俭 1.BIM技术在国内隧道工程中的应用[J]. 现代隧道技术, 2020,57(6): 25-35
[4] 蔡清程.盾构隧道管片预制智能化控制技术[J]. 现代隧道技术, 2020,57(6): 36-45
[5] 魏英华 柳 飞.高地应力隧道岩爆机理数值模拟分析[J]. 现代隧道技术, 2020,57(6): 46-54
[6] 蒋武军 1 李得建 2,3 瞿拓宇 3.基于强度折减法的浅埋隧道掌子面三维主动稳定性上限解析[J]. 现代隧道技术, 2020,57(6): 55-62
[7] 徐 鹏 1 黄 俊 1 周剑波 1 唐劲舟 2.护盾式TBM穿越断层破碎带岩机相互作用三维数值模拟研究[J]. 现代隧道技术, 2020,57(6): 63-69
[8] 张 权 1 姜谙男 1 吴洪涛 2 段龙梅 2.基于遍布节理模型的隧道循环开挖进尺优化研究[J]. 现代隧道技术, 2020,57(6): 70-77
[9] 杨 涛.富水圆砾地层盾构隧道端头加固优化设计研究[J]. 现代隧道技术, 2020,57(6): 78-85
[10] 郑邦友 1 刘济遥 2,3 雷明锋 2,3 卢智强 1 吴治刚 1 彭 成 1.隧道漏水诱发的地层水位降深计算方法与工程应用[J]. 现代隧道技术, 2020,57(6): 86-92
[11] 张嘉文 1,2,3 雷卫东 1 贺少辉 3.运营热力隧道衬砌结构可靠度分析及剩余寿命预测研究[J]. 现代隧道技术, 2020,57(6): 93-100
[12] 吴招锋 1 胡辉荣 2.隧道衬砌结构在火灾高温下的变形及力学行为研究[J]. 现代隧道技术, 2020,57(6): 101-106
[13] 朱 磊 1 杨 燕 2 饶 辉 1 牛澎波 2.地铁隧道整体道床不同程度离缝对轨道结构动态响应影响分析[J]. 现代隧道技术, 2020,57(6): 107-114
[14] 罗 丹.某复合盾构刀盘有限元分析及参数优化[J]. 现代隧道技术, 2020,57(6): 115-119
[15] 包逸帆 1,2 王明年 1,2 秦鹏程 1,2 陈劲宇 1,3 严 涛 1 韩常领 4.基于视觉适应曲线的公路隧道群遮阳棚设计[J]. 现代隧道技术, 2020,57(6): 120-126
Copyright 2010 by 现代隧道技术