[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2020, Vol. 57 Issue (6) :25-35    DOI:
研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
BIM技术在国内隧道工程中的应用
(1中国地质大学(北京)工程技术学院,北京 100083;2交通运输部公路科学研究所,北京 100083; 3 华侨大学土木工程学院,厦门 361021;4福建厦蓉高速公路漳龙段扩建工程有限公司,龙岩 364000; 5福建省交通建设质量安全监督局,福州 350000;6中国中铁隧道集团有限公司,广州 511458)
Review on BIM Technology Applied in Tunnel Engineering in China
(1 Department of Civil Engineering, China University of Geosciences(Beijing), Beijing 100083; 2 Research Institute of Highway,Ministry of Transport, Beijing 100083; 3 College of Civil Engineering, Huaqiao University, Xiamen 361021; 4 Fujian Xiarong Expressway Zhanglong Section Expansion Engineering Co., Ltd., Longyan 364000; 5 Fujian Provincial Transportation Construction Quality and Safety Supervision Bureau, Fujian 350000; 6 China Railway Tunnel Group Co., Ltd., Guangzhou 511458)
Download: PDF (3348KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 BIM技术具有可视化、模拟性、优化性等特点,可解决设计误差、施工管理混乱等问题。文章总结了国内隧道建设过程中应用BIM技术的工程案例,分别阐述了BIM技术在隧道设计、施工、运维三个阶段的应用状况。在设计阶段,BIM技术可辅助相关人员进行三维可视化模型建立、工程量统计、碰撞检查以及稳定性分析等应用;在施工阶段,BIM技术可辅助相关人员进行可视化技术交底、施工工法与工序方案优化、施工管理优化;在运维阶段,BIM技术可辅助相关人员对隧道设备和隧道养护进行数字化管理,有助于相关人员对突发安全事件作出应急反应。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
刘星宏 1 林达明 2 俞 缙 3 丘仁科 4 苏兴炬 4 楼重华 5 王 辉 6 张中俭 1
关键词:   
Abstract: BIM technology is characterized by visualization, simulation and optimization, which can solve problems like design errors and disordered construction management. The application cases of BIM technology in domestic tunnelling are summarized, and the application statuses of BIM technology in the three stages of tunnel design, construction and operation and maintenance are expounded. In the design stage, BIM technology can assist related personnel to carry out applications like 3D visualization model establishment, works quantity statistics, collision check and stability analysis; in the construction stage, BIM technology can assist relevant personnel to carry out visual technical clarification, optimization of construction method and process plan as well as construction management; in the operation and maintenance stage, BIM technology can assist relevant personnel to manage tunnel equipment and tunnel maintenance digitally, which helps relevant personnel to respond to sudden safety incidents.
KeywordsTunnel,   BIM,   3D visualization,   Design,   Construction,   Operation and maintenance     
基金资助:基金项目:福建省交通科技项目(2016072)
作者简介: 作者简介:刘星宏(1993-),男,硕士研究生,主要从事BIM技术应用研究工作,E-mail:15652926849@163.com. 通讯作者:林达明(1985-),男,博士,研究员,主要从事公路工程地质及BIM方面研究,E-mail:2466676733@qq.com.
引用本文:   
刘星宏 1 林达明 2 俞 缙 3 丘仁科 4 苏兴炬 4 楼重华 5 王 辉 6 张中俭 1 .BIM技术在国内隧道工程中的应用[J]  现代隧道技术, 2020,V57(6): 25-35
LIU Xinghong1 LIN Daming2 YU Jin3 QIU Renke4 SU Xingju4 LOU Chonghua5 WANG Hui6 ZHANG Zhongjian1 .Review on BIM Technology Applied in Tunnel Engineering in China[J]  MODERN TUNNELLING TECHNOLOGY, 2020,V57(6): 25-35
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2020/V57/I6/25
 
没有本文参考文献
[1] 范 磊 杨昌宇.特长铁路隧道超深竖井模式下防灾疏散及救援技术研究[J]. 现代隧道技术, 2020,57(6): 1-7
[2] 刘建友 1 赵 勇 2 吕 刚 1 刘淑芬 3 刘春晓 1.隧道下穿高速铁路路基风险分级及风险评价方法研究[J]. 现代隧道技术, 2020,57(6): 8-16
[3] 常银生 1,2 吕 乐 1 王敬敬 1,3 王旭东 1.考虑基础埋深的隧道开挖对邻近建筑物损坏程度评价[J]. 现代隧道技术, 2020,57(6): 17-24
[4] 蔡清程.盾构隧道管片预制智能化控制技术[J]. 现代隧道技术, 2020,57(6): 36-45
[5] 魏英华 柳 飞.高地应力隧道岩爆机理数值模拟分析[J]. 现代隧道技术, 2020,57(6): 46-54
[6] 蒋武军 1 李得建 2,3 瞿拓宇 3.基于强度折减法的浅埋隧道掌子面三维主动稳定性上限解析[J]. 现代隧道技术, 2020,57(6): 55-62
[7] 徐 鹏 1 黄 俊 1 周剑波 1 唐劲舟 2.护盾式TBM穿越断层破碎带岩机相互作用三维数值模拟研究[J]. 现代隧道技术, 2020,57(6): 63-69
[8] 张 权 1 姜谙男 1 吴洪涛 2 段龙梅 2.基于遍布节理模型的隧道循环开挖进尺优化研究[J]. 现代隧道技术, 2020,57(6): 70-77
[9] 杨 涛.富水圆砾地层盾构隧道端头加固优化设计研究[J]. 现代隧道技术, 2020,57(6): 78-85
[10] 郑邦友 1 刘济遥 2,3 雷明锋 2,3 卢智强 1 吴治刚 1 彭 成 1.隧道漏水诱发的地层水位降深计算方法与工程应用[J]. 现代隧道技术, 2020,57(6): 86-92
[11] 张嘉文 1,2,3 雷卫东 1 贺少辉 3.运营热力隧道衬砌结构可靠度分析及剩余寿命预测研究[J]. 现代隧道技术, 2020,57(6): 93-100
[12] 吴招锋 1 胡辉荣 2.隧道衬砌结构在火灾高温下的变形及力学行为研究[J]. 现代隧道技术, 2020,57(6): 101-106
[13] 朱 磊 1 杨 燕 2 饶 辉 1 牛澎波 2.地铁隧道整体道床不同程度离缝对轨道结构动态响应影响分析[J]. 现代隧道技术, 2020,57(6): 107-114
[14] 罗 丹.某复合盾构刀盘有限元分析及参数优化[J]. 现代隧道技术, 2020,57(6): 115-119
[15] 包逸帆 1,2 王明年 1,2 秦鹏程 1,2 陈劲宇 1,3 严 涛 1 韩常领 4.基于视觉适应曲线的公路隧道群遮阳棚设计[J]. 现代隧道技术, 2020,57(6): 120-126
Copyright 2010 by 现代隧道技术