现代隧道技术 2022, Vol. 59 Issue (3) :118-127    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
浅埋暗挖隧道近距离平行上跨对既有盾构隧道的变形影响分析
(1.内蒙古科技大学土木工程学院,包头 014010;2.内蒙古科技大学矿山安全与地下工程院士工作站,包头 014010;3.内蒙古自治区高校城市地下工程技术研究中心,包头 014010;4.北京城建设计发展集团股份有限公司,北京 100371)
Analysis of Deformation Impact of the Adjacent Over-crossing Parallel Tunnel Excavated by the Shallow Mining Method on the Existing Shield Tunnels
(1. School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2. Academicians Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 3. Technical Research Center for Urban Underground Engineering of Colleges and Universities in the Inner Mongolia Autonomous Region,Baotou 014010; 4. Beijing Urban Construction Design & Development Group Co., Limited, Beijing 100371)
Download: PDF (5790KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 依托呼和浩特市浅埋暗挖隧道近距离平行上跨既有地铁2号线工程,通过有限元数值模拟和现场监测,对不同的开挖工法和反压措施进行方案比选,研究上穿施工引起盾构隧道结构上浮的变形规律。结果表明:在施工中采用砂袋反压可有效控制盾构隧道的变形,通过对比发现,第二次砂袋反压的竖向位移控制率明显低于第一次反压,故现场施工中应尽早对隧道进行砂袋反压,避免因反压时间较迟导致竖向位移控制率过小而无法达到良好的反压效果;上穿工程引起既有地铁2号线隧道的变形曲线呈“半抛物线”形,且随着新建隧道开挖卸荷而产生左右变换的现象;由于土体卸荷、覆土埋深较浅等因素,盾构管片发生不均匀变形,最终既有盾构隧道管片整体变形呈“竖鸭蛋”状;综合经济、效率等因素,最终确定的方案为CD法+双侧反压。该工程采用优化方案后,最终将盾构隧道道床最大上浮变形控制在2.51 mm,满足规范控制值4.0 mm要求。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
许有俊 1
2
3 秦浩斌 1 李文博 4 张 旭 1
2
3 张 朝 1
2
3 李泽升 4
关键词浅埋暗挖   上跨   盾构隧道   上浮控制   竖向位移控制率   施工方案优化     
Abstract: Given that the tunnel excavated by the shallow mining method adjacently crossed over the existing Metro Line No.2 in a parallel way in Hohhot, the scheme comparison was carried out for different excavation methods and counter-pressure measures by means of finite element numerical simulation and on-site monitoring, and the study was conducted on the floating deformation pattern of shield tunnel structure caused by over-crossing construction.The results showed that the use of sandbags for counterpressure during construction could effectively control the deformation of shield tunnels, and through comparison, it has been found that the vertical displacement control rate of the second sandbag counterpressure was significantly lower than that of the first sandbag counterpressure. So, sandbag counterpressure for tunnels should be conducted during on-site construction as early as possible to avoid a smaller vertical displacement control rate caused by delayed counterpressure, which would further lead to a failure to realize a good effect of counterpressure. It has also been found that the curve of tunnel deformation of Metro Line No. 2 caused by the over-crossing works was of a "semi-parabolic" shape, and the phenomenon of left-right conversion occurred with the excavation and unloading of the new tunnel. Besides, unhomogeneous deformation occurred in shield tunnel segments due to various factors, such as soil unloading, shallow depth of overburden, etc. and the overall deformation of the existing shield tunnel segments was of a "vertical duck egg" shape. The finalized scheme of the Works was CD method + two-sided counterpressure based on economical factor, efficiency and other factors.After the optimization scheme was adopted in the Works, the maximum floating deformation of the shield tunnel roadbed was finally controlled at 2.51 mm, which complied with the specified control value, i.e. 4.0 mm.
KeywordsShallow mining method,   Overcrossing,   Shield tunnel,   Floating control,   Vertical displacement control rate,   Optimization of construction option     
基金资助:呼和浩特市交通投资建设集团有限公司横向项目(2021073)
作者简介: 许有俊(1979-),男,博士,教授,主要从事隧道与地下工程方面的研究工作,E-mail: 876086409@qq.com. 通讯作者:秦浩斌(1998-),男,硕士研究生,主要从事隧道与地下工程方面的研究工作,E-mail:1136346869@qq.com.
引用本文:   
许有俊 1, 2, 3 秦浩斌 1 李文博 4 张 旭 1等 .浅埋暗挖隧道近距离平行上跨对既有盾构隧道的变形影响分析[J]  现代隧道技术, 2022,V59(3): 118-127
XU Youjun1, 2, 3 QIN Haobin1 LI Wenbo4 ZHANG Xu1 etc .Analysis of Deformation Impact of the Adjacent Over-crossing Parallel Tunnel Excavated by the Shallow Mining Method on the Existing Shield Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2022,V59(3): 118-127
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2022/V59/I3/118
 
没有本文参考文献
[1] 马 建.盾构隧道穿越对既有管线影响的研究与展望[J]. 现代隧道技术, 2022,59(3): 23-30
[2] 魏新江 1,2 张 彪 1 鲁梁梁 2 刘映晶 3 朱汉华 2 汪海林 1.盾构隧道同步注浆的几个核心问题探讨[J]. 现代隧道技术, 2022,59(3): 10-22
[3] 苗晨阳 1 黄强兵 1,2 苟玉轩 1 滕宏泉 3 贾少春 4.地裂缝场地盾构隧道下穿施工对既有管廊的影响研究[J]. 现代隧道技术, 2022,59(3): 155-165
[4] 吴 林 1,2 王 维 2 封 坤 2 陶伟明 1 孟庆辉 2 甄文战 1.盾构隧道纵向上浮分析模型中地基抗力系数研究[J]. 现代隧道技术, 2022,59(3): 128-135
[5] 张丽丽 1 单 琳 1 郭 飞 1 蔡 振 1 韩瑞林 1 张 旭 2,3,4 王智广 2 许有俊 2,3,4.小曲线半径叠落盾构隧道近接施工安全控制研究[J]. 现代隧道技术, 2022,59(3): 253-264
[6] 靳雪梅 1,2 黄宏伟 2 张东明 2.关于土的空间变异性对盾构隧道施工影响的探讨[J]. 现代隧道技术, 2022,59(2): 62-70
[7] 薛光桥 1,2 程 岩 3,4 刘笑娣 3,4 刘新根 3,4 张 忆 1,2.基于遗传算法的盾构隧道管片接头刚度反演研究[J]. 现代隧道技术, 2022,59(2): 78-85
[8] 孙双篪 1,2 沈 奕 1 周质炎 2 周 龙 1 朱合华 1.大直径盾构隧道穿越建筑物群变形分析与控制措施[J]. 现代隧道技术, 2022,59(2): 103-110
[9] 陈湘生 1,2 喻益亮 1,2 包小华 1,2 崔宏志 1,2 夏长青 1,2 周海洋 1,2 朱 旻 1,2.基于韧性理论的盾构隧道智能建造[J]. 现代隧道技术, 2022,59(1): 14-28
[10] 张 纯 周宇轩 李登鹏.具有无序排列管片环结构的地铁盾构隧道数字模型智能重建[J]. 现代隧道技术, 2022,59(1): 80-86
[11] 杨春山 1 魏立新 1 莫海鸿 2.地震作用对盾构隧道管片张开量的影响及预测[J]. 现代隧道技术, 2022,59(1): 133-140
[12] 丁小彬 韩东霖.运营盾构隧道不同椭圆度变形情况下受力性能分析[J]. 现代隧道技术, 2022,59(1): 141-148
[13] 贺蕾铭 1 邓非凡 2,3 贾 鹏 2,3.在建盾构隧道突发管片破损病害成因分析及治理措施研究[J]. 现代隧道技术, 2022,59(1): 225-231
[14] 何 剑 1 彭玥锴 1 梁 孝 2,3 漆泰岳 2,3.盾构隧道整体道床剥离病害规律研究[J]. 现代隧道技术, 2022,59(1): 232-240
[15] 马乾瑛 业嘉超 蒋小慧.考虑土拱效应的盾构隧道施工地表沉降预测研究[J]. 现代隧道技术, 2021,58(6): 148-154
Copyright 2010 by 现代隧道技术