矩形顶管隧道F型承插接头剪切破坏机制
(1.内蒙古科技大学土木工程学院,包头 014010;2.内蒙古科技大学矿山安全与地下工程院士专家工作站,包头 014010;3.内蒙古科技大学内蒙古自治区高校“城市地下工程技术研究中心”,包头 014010)
Shear Failure Mechanism of F-type Socket-and-Spigot Joint in Rectangular Pipe Jacking Tunnels
(1. School of Civil Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 2. Academician Workstation of Mine Safety and Underground Engineering, Inner Mongolia University of Science and Technology, Baotou 014010; 3. Engineering Research Center of Urban Underground Engineering at Universities of Inner Mongolia Autonomous Region, Inner Mongolia University of Science and Technology, Baotou 014010)
Download: PDF (5520KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 接头是矩形顶管隧道最薄弱的环节,对地基的不均匀沉降极为敏感,极易发生管节间的剪切错台变形。以 F型承插接头为研究对象,采用室内试验和 ABAQUS 有限元进行分析,归纳宏观破坏现象,得到了接头剪切变形机理,建立隧道变形控制标准。结果表明,顶管隧道剪切破坏特征分为缝隙闭合、抗剪强化、屈服破坏3个阶段,第二阶段剪切刚度最大;发生剪切破坏时,钢套环和混凝土在倒角位置易产生应力集中;适当添加纵向连接件可以提高柔性接头稳定性和剪切刚度;错台量达 12 mm 时,钢套环开始屈服,错台量为 27 mm 时钢套环开始发生塑性破坏。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
许有俊 1
2
3 康佳旺 1 张 朝 1
2
3 黄正东 1 张 旭 1
2
3
关键词矩形顶管   接头试验   破环特征   控制标准     
Abstract: The joint is the weakest link of the rectangular pipe jacking tunnel, which is very sensitive to the uneven settlement of the foundation, and is prone to shear dislocation and deformation between pipe joints. Taking the Ftype socket-and-spigot joint as the research object, the indoor test and ABAQUS finite element were used to analyze the macroscopic failure phenomenon, the shear deformation mechanism of the joint was obtained, and the tunnel deformation control standard was established. The results show that the shear failure characteristics of the pipe jacking tunnel are divided into three stages: gap closure, shear strengthening and yield failure, and the shear stiffness in the second stage is the largest; when shear failure occurs, the steel ferrule and concrete are prone to stress concentration at the chamfered position; proper addition of longitudinal connectors can improve the stability and shear stiffness of flexible joints; the steel ferrule begins to yield at a staggered volume of 12 mm, and the plastic failure begins to occur when the staggered volume is 27 mm.
KeywordsRectangular pipe jacking,   Joint test,   Failure characteristics,   Control standard     
基金资助:国家自然科学基金(51868062)
作者简介: 许有俊(1979-),男,博士,教授,主要从事隧道与地下工程方面的研究工作,E-mail: xyoujun@163.com. 通讯作者:康佳旺(1996-),男,硕士研究生,主要从事隧道及地下空间方面的研究工作,E-mail:10230168370@163.com.
引用本文:   
许有俊 1, 2, 3 康佳旺 1 张 朝 1等 .矩形顶管隧道F型承插接头剪切破坏机制[J]  现代隧道技术, 2023,V60(3): 189-198
XU Youjun1, 2, 3 KANG Jiawang1 ZHANG Chao1 etc .Shear Failure Mechanism of F-type Socket-and-Spigot Joint in Rectangular Pipe Jacking Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2023,V60(3): 189-198
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2023/V60/I3/189
 
没有本文参考文献
[1] 崔光耀 1 麻建飞 2 宁茂权 3,4 唐再兴 3,4 刘顺水 3,4 田宇航 1.软弱地层超大矩形顶管盾构隧道近接施工加固方案优选研究[J]. 现代隧道技术, 2023,60(2): 178-184
[2] 徐 宏 1 叶 飞 2 刘 奇 1 田黎明 1 安 欢 1.大断面矩形顶管施工地层变形及顶进参数控制研究[J]. 现代隧道技术, 2022,59(6): 97-105
[3] 杨 雄 1 孟庆辉 2 李 拼 1 徐灯飞 3 曹 峰 1.铁路车站隧道下穿桩基工程设计与分析[J]. 现代隧道技术, 2022,59(4): 218-225
[4] 甄 亮 1 张显裕 2,3 李晓军 2,3.浅埋矩形顶管整体背土效应判别方法应用与处理措施[J]. 现代隧道技术, 2022,59(2): 167-171
[5] 肖尊群 1,2,3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1.基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法[J]. 现代隧道技术, 2021,58(6): 68-76
[6] 许有俊 1,2 黄正东 1,2 张 旭 1,2 张 朝 1,2 康佳旺 1,2 周 薇 1.大断面土压平衡矩形顶管多刀盘实测扭矩参数研究[J]. 现代隧道技术, 2021,58(5): 96-103
[7] 吴 波 1,2 彭逸勇 1,2 蒙国往 1,2 濮松权 3.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J]. 现代隧道技术, 2021,58(2): 86-92
[8] 田杨明 1 张志刚 2 邓 涛 3,4 田 源 3,4.城市隧道纵向通风风机噪声分布特性实测及应用研究[J]. 现代隧道技术, 2020,57(3): 154-160
[9] 陈 力 1,2 刁心宏 1 杨守兴 1 陈志亮 1 章 坤 1.框架桥下穿既有铁路路基沉降控制标准研究 [J]. 现代隧道技术, 2019,56(2): 111-118
[10] 赖浩然1 黄常元2 刘学增1 涂新斌2 谢俊3 桑运龙1,4.超载对淤泥质地层隧道结构受力性能影响分析——以苏通GIL综合管廊越江盾构隧道为例[J]. 现代隧道技术, 2018,55(5): 88-96
[11] 胡指南 1,2,3 冯怀平 1 马超超 4 赵玉成 1 张 骞 3.沉管隧道节段接头剪力键受力阶段与沉降控制标准研究[J]. 现代隧道技术, 2018,55(4): 132-138
[12] 许有俊 1 梁玮真 1 刘忻梅 2 崔广琴 1 白雪光 3.大断面矩形顶管隧道开挖面土体稳定性研究[J]. 现代隧道技术, 2017,54(5): 70-77
[13] 吴 勇 1 徐日庆 1 段景川 2 徐 新 3 朱亦弘 1.浅覆土大断面小间距矩形顶管施工的环境效应[J]. 现代隧道技术, 2017,54(5): 78-85
[14] 王明胜 1 刘大刚 2, 3.顶管隧道工程触变泥浆性能试验及减阻技术研究[J]. 现代隧道技术, 2016,53(6): 182-189
[15] 张宏1, 2, 凌建明3.基于机场飞行区混凝土道面功能性要求的盾构施工控制研究[J]. 现代隧道技术, 2015,52(1): 150-155
Copyright 2010 by 现代隧道技术