[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2024, Vol. 61 Issue (5) :219-226    DOI:
试验与监测 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
城际铁路隧道深大圆形竖井开挖阶段变形监测分析
(1.深圳地铁集团有限公司,深圳 518000;2.中山大学·深圳 航空航天学院,深圳 518107 ; 3.中山大学土木工程学院,珠海 519082;4. 南方海洋科学与工程广东省实验室,珠海 519082; 5.中铁七局集团第三工程有限公司,西安 710000)
Deformation Monitoring and Analysis during the Excavation of Deep Circular Shafts in Intercity Railway Tunnels
(1. Shenzhen Metro Group Co.,Ltd., Shenzhen 518000; 2. School of Aeronautics and Astronautics, Sun Yat-Sen University,Shenzhen 518107; 3. School of Civil Engineering, Sun Yat-sen University, Zhuhai 519082; 4. Southern Marine Science Engineering Guangdon Laboratory, Zhuhai 519082; 5. The Third Engineering Co.Ltd of China Railway Seventh Group, Xi′an 710032)
Download: PDF (5256KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 盾构始发与接收工作井的支护体系选取与设计是深埋隧道建设过程中的关键问题。圆形围护结构以其可充分发挥土拱效应,无需内撑等特点,较一般多边形结构体系具有更优的受力性能与经济性。为降低土岩复合地层中嵌岩部分施工难度及提高施工效率,以深大城际铁路隧道坪聚盾构工作井应用上部圆形吊脚地连墙+环框梁、下部岩层喷锚支护方式的结构形式为工程依托,对深埋圆形基坑开挖过程中坑外地下水位变化、地表及围护结构变形监测数据开展研究分析。研究结果表明:地面超载、坑外地下水位不均匀分布会引起墙体及地表产生差异变形;墙体最大水平变形基本位于0~0.05%H(H为基坑开挖深度)以内;地表沉降变形大部分位于0~0.08%H以内;墙顶竖向沉降值大部分位于0~0.25%H;相比一般不规则多边形基坑支护,圆筒形支护体系显示出较好的稳定性与抗变形能力;在土岩复合地层中,上部采用地连墙+环框梁,下部岩层采用喷锚支护的结构形式可保证基坑稳定性,安全性较好。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
宋越鹏1 范晓锋2 梁 禹2
3
4 彭红国5 张晗炜5
关键词铁路隧道   圆形基坑   现场实测   深基坑   地下水影响   不均匀变形   变形性状     
Abstract: The selection and design of the support system for the launching and receiving shafts of shield tunnelling are critical issues in the construction of deep-buried tunnels. Circular enclosure structures can fully utilize the arch effect of soil and do not require internal supports, providing better mechanical performance and cost-effectiveness compared to general polygonal structures. To reduce the construction difficulty and improve efficiency in the rockembedded section of composite strata, the Shenzhen International Airport-Dayawan intercity railway tunnel′s Pingju shield working shaft adopts an upper circular diaphragm wall combined with a ring beam and a lower layer of rock support using shotcrete and anchor bolts. This study analyzes changes in external groundwater, ground surface, and enclosure structure deformation during the excavation of the deep circular foundation pit. The results indicate that: surface overload and uneven external groundwater levels cause differential deformation of the wall and ground surface; the maximum horizontal deformation of the wall is generally within 0 to 0.05%H (H is the excavation depth);most ground surface settlement deformation is within 0 to 0.08%H; the vertical settlement at the top of the wall mostly ranges from 0 to 0.25%H; compared to general irregular polygonal foundation pits, the cylindrical support system shows better stability and deformation performance; the combined use of diaphragm walls with ring beams in the upper section and shotcrete and anchor bolts in the lower rock layer ensures the stability and safety of the foundation pit in composite strata.
KeywordsRailway tunnel,   Circular deep foundation pit,   Field measurement,   Groundwater influence,   Uneven defor? mation,   Deformation characteristics     
基金资助:国家自然科学基金(52378427);广东省基础与应用基础研究基金(2023A1515030258、2024A1515012623);深圳市科技计划项目可持续发展专项(KCXFZ20201221173207020).
作者简介: 宋越鹏(1982-),男,主要从事轨道交通建设方面的工作,E-mail:851830064@qq.com. 通讯作者:梁 禹(1986-),男,博士,副教授,主要从事地下工程结构与地层相互力学作用方面的研究工作,E-mail:liangyu25@mail.sysu.edu.cn.
引用本文:   
宋越鹏1 范晓锋2 梁 禹2, 3, 4 彭红国5 张晗炜5 .城际铁路隧道深大圆形竖井开挖阶段变形监测分析[J]  现代隧道技术, 2024,V61(5): 219-226
SONG Yuepeng1 FAN Xiaofeng2 LIANG Yu2, 3, 4 PENG Hongguo5 ZHANG Hanwei5 .Deformation Monitoring and Analysis during the Excavation of Deep Circular Shafts in Intercity Railway Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2024,V61(5): 219-226
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2024/V61/I5/219
 
没有本文参考文献
[1] 魏荣华1,2 张康健1,2 张志强1,2.铁路隧道深埋水沟防排水技术参数优化研究[J]. 现代隧道技术, 2024,61(5): 183-192
[2] 周晓军.基于横断面几何参数的高速铁路隧道预制拼装二次衬砌分块设计方法[J]. 现代隧道技术, 2024,61(4): 232-243
[3] 高树全1,2,3 蒋良文1,2,3 牟元存1,2,3 李 星1,2,3 王树栋1,2.西南复杂艰险山区铁路隧道超前地质预报技术[J]. 现代隧道技术, 2024,61(2): 52-59
[4] 王明年1,2 邓 涛3 于 丽1,2.中国交通隧道运营及防灾通风技术发展与展望[J]. 现代隧道技术, 2024,61(2): 152-166
[5] 曾弘锐1,2 孙文昊3 何 卫3 郭亚林1,2 郭 春1,2.基于机器学习的铁路隧道施工碳排放预测模型研究[J]. 现代隧道技术, 2023,60(6): 29-39
[6] 杨春山1 杨雪强2 王雅甜2 林永贵1.建筑敏感区隧道破除抗滑桩进洞转换体系设计与施工方案优选[J]. 现代隧道技术, 2023,60(6): 220-227
[7] 朱星宇 刘 征 张志强 冯 应.铁路隧道结构设计参数对二次衬砌裂缝影响规律研究[J]. 现代隧道技术, 2023,60(5): 1-10
[8] 陈 伟1,2 张明红2 张 莹2 林 玲2.中老铁路某隧道盐岩工程地质特征研究[J]. 现代隧道技术, 2023,60(5): 234-242
[9] 朵生君.铁路隧道TBM长距离施工通风技术研究[J]. 现代隧道技术, 2023,60(4): 222-228
[10] 赵万强 1 路军富 2 汤 印 1 郑长青 1.铁路隧道底鼓风险等级划分方法及控制措施研究[J]. 现代隧道技术, 2023,60(4): 178-187
[11] 陈锡武 1 卿伟宸 1 刘国强 2.高地应力断层带超大断面隧道施工设计[J]. 现代隧道技术, 2023,60(4): 204-212
[12] 袁传保 1 鲁金林 1 陶玉敬 1 宋 章 1 刘国强 2.复杂强震山区跃龙门隧道重大工程地质问题研究[J]. 现代隧道技术, 2023,60(4): 188-195
[13] 袁红运 1,2 陈礼伟 2 刘志强 2.单线铁路隧道衬砌纵向裂缝病害综合评价方法[J]. 现代隧道技术, 2023,60(3): 208-216
[14] 路军富 1 张宏鑫 1 裴起帆 2.铁路隧道施工阶段监测等级划分方法及应用[J]. 现代隧道技术, 2023,60(1): 202-208
[15] 张民庆 1 辛维克 1 贾大鹏 1 司景钊 2 王唤龙 3.高压富水深竖井工作面预注浆关键技术参数研究及应用[J]. 现代隧道技术, 2022,59(6): 177-186
Copyright 2010 by 现代隧道技术