[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2025, Vol. 62 Issue (1) :183-191    DOI:
数值分析与计算 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
沙滩头隧道不同净距条件下先后行洞相互作用机理研究
(中铁十九局集团华东工程有限公司,余姚 315400)
Study on the Interaction Mechanism of First and Subsequently Excavated Shatantou Tunnel Tubes under Different Clear Distance Conditions
(China Railway 19th Bureau Group East China Engineering Co., Ltd., Yuyao 315400)
Download: PDF (6641KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为了揭示双洞隧道在动态开挖条件下的相互作用机制,以351国道改建工程中沙滩头隧道为工程背景,对7组不同净距条件下深埋隧道的围岩应力分布、变形和塑性区演化以及中夹岩受载和破坏特征、支护结构内力分布等在动态开挖条件下的变化规律开展研究,分析深埋隧道不同净距条件下先后行洞相互作用机理。研究结果表明,单洞开挖时,隧道侧向和掌子面前方围岩内将形成应力集中区,最大应力形成于拱脚处,拱顶沉降和拱底变形较大;动态开挖条件下,中夹岩和后行洞掌子面前方靠近先行洞一侧围岩应力集中程度较高,且在净距为0.3D时达到峰值;当净距超过0.5D时,中夹岩内部可以形成稳定的承载核心;在小净距条件下,先行洞衬砌内力受后行洞开挖影响明显;净距为0.3D时,先行洞的初期支护轴力达到峰值,位于拱腰处,支护弯矩在拱脚达到峰值。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王志刚
关键词双洞隧道   小净距   动态开挖   相互作用   围岩稳定性   支护内力     
Abstract: To reveal the interaction mechanism of twin tunnel tubes under dynamic excavation conditions, the Shat? antou Tunnel of the National Highway 351 reconstruction project is taken as the engineering background. The study investigates the stress distribution, deformation, and evolution of the plastic zone of the surrounding rock, as well as the loading and failure characteristics of the middle rock pillar and the internal force distribution of the support structure under dynamic excavation conditions for seven groups of different clear distances in deeply buried tunnels.The interaction mechanism of first and subsequently excavated tunnel tubes under different clear distance conditions for deeply buried tunnels with small clear distance is analyzed. The results show that during single tunnel tube excavation, stress concentration areas form in the lateral sides and the front of the tunnel face, with the maximum stress located at the arch corner, and significant settlement at the arch crown and deformation at the arch bottom. Under dynamic excavation conditions, the stress concentration at the middle rock pillar and the side in front of the sub? sequently excavated tunnel tube face near the first excavated tunnel tube is higher, peaking at a clear distance of 0.3D. When the clear distance exceeds 0.5D, a stable bearing core can form inside the middle rock pillar. Under small clear distance conditions, the internal forces in the lining of the first excavated tunnel tube are significantly affected by the excavation of the subsequent tunnel tube. At a clear distance of 0.3D, the axial force of the initial support in the first excavated tunnel tube reaches its peak at the arch waist, while the bending moment of the support peaks at the arch foot.
KeywordsSmall clear distance,   Dynamic excavation,   Interaction,   Surrounding rock stability,   Support internal force     
作者简介: 王志刚(1987-),男,高级工程师,主要从事公路和铁路隧道和地下工程结构设计、隧道结构健康监测与安全评估以及桥梁与隧道检 测与加固设计等领域研究与应用工作,E-mail:jelly1023@126.com.
引用本文:   
王志刚 .沙滩头隧道不同净距条件下先后行洞相互作用机理研究[J]  现代隧道技术, 2025,V62(1): 183-191
WANG Zhigang .Study on the Interaction Mechanism of First and Subsequently Excavated Shatantou Tunnel Tubes under Different Clear Distance Conditions[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 183-191
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I1/183
 
没有本文参考文献
[1] 王圣涛1 张俊儒2 彭 波1 燕 波3.拱隧一体结构跨越巨型溶洞段处治技术研究[J]. 现代隧道技术, 2024,61(5): 263-273
[2] 王德福.盾构滚刀切削桩基相互作用机理及关键参数分析研究——以海珠湾盾构隧道为例[J]. 现代隧道技术, 2024,61(1): 216-228
[3] 燕 波 1 张俊儒 2 张新锦 1 彭 磊 1 宁 波 1.基于围岩径向位移释放率的超大断面隧道下穿施工围岩稳定性研究[J]. 现代隧道技术, 2023,60(2): 115-124
[4] 杨 雄 1 孟庆辉 2 李 拼 1 徐灯飞 3 曹 峰 1.铁路车站隧道下穿桩基工程设计与分析[J]. 现代隧道技术, 2022,59(4): 218-225
[5] 谢 军 1,2,3 段 龙 2 梁金晓 2 李延涛 1 宗金辉 1.隧道-土-地表建筑相互作用体系的减震分析[J]. 现代隧道技术, 2022,59(3): 136-145
[6] 肖明清 1,2 徐 晨 1,2 郑 强 1,2 彭长胜 1,2.荷坳隧道四洞小净距段支护结构设计研究[J]. 现代隧道技术, 2022,59(2): 1-10
[7] 王明年 1,2 杨恒洪 1,2 张艺腾 1,2 刘轲瑞 1,2 于 丽 1,2.水平小净距隧道中夹岩安全系数法研究与应用[J]. 现代隧道技术, 2022,59(2): 11-19
[8] 张付军 1 胡 俊 2,3 段 宇 4 朱才辉 4.某富水断层隧道涌水治理方案优化分析及工程应用[J]. 现代隧道技术, 2022,59(2): 122-131
[9] 冯冀蒙 1,2 蒋 辉 1,2 丁晓琦 1,2 虞龙平 1,2 张俊儒 1,2.并行双洞隧道穿越滑坡工程研究进展与挑战[J]. 现代隧道技术, 2021,58(6): 1-10
[10] 袁 彬 1 徐凡献 2 廖 欢 3 钟雨田 3 罗 刚 3.结构面空间组合关系对隧道围岩稳定性影响研究[J]. 现代隧道技术, 2021,58(3): 107-114
[11] 徐 鹏 1 黄 俊 1 周剑波 1 唐劲舟 2.护盾式TBM穿越断层破碎带岩机相互作用三维数值模拟研究[J]. 现代隧道技术, 2020,57(6): 63-69
[12] 代 聪 1,3 何 川 2,3 刘川昆 2,3 郭文琦 2,3.开挖工法对高地应力场软岩隧道围岩稳定性影响的模型试验研究[J]. 现代隧道技术, 2020,57(4): 141-149
[13] 张珂峰.前伏溶洞巷道开挖突水数值模拟研究[J]. 现代隧道技术, 2020,57(3): 99-107
[14] 杨志强 1 方 晶 2 刘湘林 1 郑余朝 2.基于工期目标的单跨四车道市政隧道施工优化研究[J]. 现代隧道技术, 2020,57(2): 184-191
[15] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
Copyright 2010 by 现代隧道技术