现代隧道技术 2025, Vol. 62 Issue (1) :275-284    DOI:
新型材料与设备 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
绿色装配式综合管廊U盾架管机设计及其施工技术研究
(1.中铁工程装备集团有限公司,郑州 450016;2.中铁科工集团有限公司,武汉 430070)
Design and Construction Technology of U-shaped Shield Pipe Erecting Machine for Green Prefabricated Integrated Utility Tunnels
(1. China Railway Engineering Equipment Group Co., Ltd., Zhengzhou 450016; 2. China Railway Science & Industry Group Co., Ltd.,Wuhan 430070)
Download: PDF (7735KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  针对综合管廊传统建造方式占地面积大、人力投入大、工序复杂、效率较低等不足,提出“盾构技术+架桥技术”深度融合的综合管廊“盾架一体化”建造理念,研制相应的绿色装配式综合管廊U盾架管机。首先,详细介绍U盾架管机整机设计,包括具备模块化无级可变径功能的U型移动支护盾体设计以及负责管节安装的门型双支腿单主梁高精度架管装置设计,可以适应不同断面综合管廊建设,管节拼装误差在±5 mm以内;同时,还介绍了垫层摊铺系统、新型经济型管廊侧缝填充材料“速凝液态土”制备及同步填充系统设计,可以解决综合管廊垫层机械化摊铺、侧缝同步回填的难题;然后,以雄安新区某综合管廊建设项目为依托,介绍U盾架管机总体及管节拼装、垫层摊铺、侧缝填充、变径等关键技术施工应用情况,并与传统明挖现浇工法进行对比分析。应用表明,与传统工法相比,U盾架管机工法节省占地宽度44%,提升施工工效37.5%,同时在施工安全性、建设品质、经济性方面均具有明显优势。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
贾连辉1 闫扬义1 薛广记1 董艳萍1 龚廷民1 沈 超2
关键词综合管廊   盾架一体化   U盾架管机   绿色建造   垫层摊铺   同步注浆   变舱适应     
Abstract: To address the limitations of traditional utility tunnel construction methods, which involve large land use, high labor input, complex processes and low efficiency, this study proposes the construction concept of "Shield +Pipe erecting" for utility tunnels, which deeply integrates the "shield tunnelling technology and bridge erecting technology". A U-shield pipe erecting machine for green prefabricated utility tunnels was developed accordingly. The paper first provides a detailed introduction to the U-shield pipe erecting machine′s overall design, including the design of U-shaped shield with modular structure and stepless variable diameter function, which can adapt to the construction of utility tunnels with different cross-sections, and the design of high precision pipe erecting machine with a door-type double-leg single main beam, which can control the erection error of pipes within ±5 mm. Additionally,the blinding layer paving system and the simultaneous filling system with new economical materials“quick-setting liquid soil”are introduced, which solves the problem of mechanized paving of blinding layer and synchronous filling of side joints. Based on the utility tunnel project in Xiong′an New Area, the application of the key technologies of the U-shaped shield pipe erecting machine such as pipe erecting, blinding layer paving, side joint filling and variable cross section adaption are introduced. Compared with traditional open-cut and cast-in-place construction method,this method saves site width by 44%, improves construction efficiency by 37.5%, and has significant advantages in terms of construction safety, quality, and cost-effectiveness.
KeywordsUtility tunnel,   Shield and pipe erecting integrated,   U-shield pipe erecting machine,   Green construction; Blinding layer paving,   Simultaneous filling,   Variable cabin adaption     
作者简介: 贾连辉(1981-),男,硕士,正高级工程师,主要从事隧道及地下施工装备设计研究工作,E-mail:jialianhui2005@163.com.
引用本文:   
贾连辉1 闫扬义1 薛广记1 董艳萍1 龚廷民1 沈 超2 .绿色装配式综合管廊U盾架管机设计及其施工技术研究[J]  现代隧道技术, 2025,V62(1): 275-284
JIA Lianhui1 YAN Yangyi1 XUE Guangji1 DONG Yanping1 GONG Tingmin1 SHEN Chao2 .Design and Construction Technology of U-shaped Shield Pipe Erecting Machine for Green Prefabricated Integrated Utility Tunnels[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 275-284
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I1/275
 
没有本文参考文献
[1] 彭 子1,2 文 萌3 陈 媛4 邓 禹5 郭 春1,2.城市综合管廊廊内温度预测公式及应用研究[J]. 现代隧道技术, 2024,61(6): 74-81
[2] 马华兵1 冯良平2 王恒栋3 霰建平4 商冬凡5 崔光耀6.长节段大吨位预制拼装综合管廊接头防水现场试验研究[J]. 现代隧道技术, 2024,61(1): 208-215
[3] 刘泉维1,2 杨 星3 叶守杰1,2 江玉生3 赵继增1,2 谭卓林4 杨志勇3.地铁双护盾TBM隧道穿越富水断裂带管片壁后回填注浆技术研究[J]. 现代隧道技术, 2023,60(6): 255-261
[4] 郑 爽 1,2 刘 超 3 朱德霖 3 刘 海 3 贾新卷 1.大直径盾构掘进非对称同步注浆地层扰动规律研究[J]. 现代隧道技术, 2023,60(2): 168-177
[5] 朱 力 1 霰建平 1 袁 勇 2 王恒栋 3 马华兵 4.大断面装配式综合管廊抗震性能试验研究[J]. 现代隧道技术, 2022,59(6): 140-146
[6] 单宏伟 1 孙 茂 2 霰建平 2 朱 力 2 禹海涛 3.廊上架廊过程中的预制装配式综合管廊施工力学性能与现场足尺试验研究[J]. 现代隧道技术, 2022,59(6): 147-153
[7] 杨 忠 1 马华兵 2 禹海涛 3 许海亮 4 岳 清 5.长节段大吨位城市综合管廊止水带压紧效果现场试验研究[J]. 现代隧道技术, 2022,59(6): 154-161
[8] 马华兵 1 单宏伟 1 郭亚唯 2 付佰勇 2 上官士青 3.基于冲击映像法的装配式综合管廊廊底密贴性足尺试验研究[J]. 现代隧道技术, 2022,59(6): 162-169
[9] 张耀东 1 李鹏飞 1 李强战 2 付佰勇 3 郭亚唯 3.内嵌光纤自感知钢绞线在预制管廊拼装中的应用[J]. 现代隧道技术, 2022,59(6): 170-176
[10] 张文宏 1 刘映晶 2 王军棋 2 李浩然 2 孙奎柱 2 朱汉华 2.基于硅灰对注浆材料抗水分散性能影响的外加剂优化研究[J]. 现代隧道技术, 2022,59(4): 265-272
[11] 魏新江 1,2 张 彪 1 鲁梁梁 2 刘映晶 3 朱汉华 2 汪海林 1.盾构隧道同步注浆的几个核心问题探讨[J]. 现代隧道技术, 2022,59(3): 10-22
[12] 苗晨阳 1 黄强兵 1,2 苟玉轩 1 滕宏泉 3 贾少春 4.地裂缝场地盾构隧道下穿施工对既有管廊的影响研究[J]. 现代隧道技术, 2022,59(3): 155-165
[13] 施有志 1 洪娇莉 2 林树枝 3 徐建宁 4.基于BB-MOPSO的综合管廊进风状态参数控制研究[J]. 现代隧道技术, 2022,59(1): 156-163
[14] 郭贵斌 1 靳世鹤 2 刘 奇 2 孙红斌 2.利用废弃红砂岩制备盾构同步注浆材料研究[J]. 现代隧道技术, 2021,58(6): 251-256
[15] 高鹏鹏 1 徐 方 1 宋普涛 2 王宁宁 3 张 伟 4.高性能同步注浆材料对富水砂层盾构施工参数的影响研究[J]. 现代隧道技术, 2021,58(6): 244-250
Copyright 2010 by 现代隧道技术