浅埋超大断面组合矩形顶管左右密贴顶进施工姿态控制技术研究
(1.中国水利水电第十一工程局有限公司,郑州 450001;2.中电建南方建设投资有限公司,深圳 518055; 3.深圳大学土木与交通工程学院,深圳 518060;4.中铁路安工程咨询有限公司,天津 300171; 5.深圳市地铁集团有限公司,深圳 518026)
Research on Construction Posture Control Technology for Shallow Buried Extra-large Section Combined Rectangular Pipe Jacking with Tight Gaps
(1. Sinohydro Bureau 11 Co.,Ltd.,Zhengzhou 450001; 2. China Power Construction South Construction Investment Co., Ltd.,Shenzhen 518055; 3. School of Civil and Transportation Engineering, Shenzhen University, Shenzhen 518060; 4. China Railway Safety Engineering Consulting Co.,Ltd.,Tianjin 300171; 5. Shenzhen Metro Group Co., Ltd., Shenzhen 518026)
Download: PDF (4268KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要  为更好地解决矩形顶管左右密贴施工时姿态控制及纠偏难题,以深圳地铁12号线沙三站矩形顶管施工为工程背景,研制新型防滚转装置,设计上下多螺旋输送机控制土压,设置可拆卸式洞门钢环作为左右两次密贴顶进施工的洞门结构,结合铰接油缸纠偏、刀盘控制纠偏、打土纠偏等姿态控制技术完成超大断面组合矩形顶管密贴顶进。现场实测数据表明:顶管顶推完成后,左右线管节的水平、垂直偏差在设计控制值以内,满足规范要求,顶管轴线的控制精度较好;分析二次顶进密贴施工对顶管姿态的影响,发现右线顶管姿态与左线顶管姿态拟合良好,左右线顶管密贴间距控制合理,未出现挤碰现象,顶管间距虽比设定值大15%,但仍符合整体顶推施工要求。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
金郑星1 郭 平2 周文朋1 胡 桥4 苏 栋3 赵佳鑫1 孙 波5
关键词超大断面   矩形顶管   密贴施工   姿态分析   姿态控制   纠偏技术     
Abstract: To better address the issues of posture control and deviation correction during construction of rectangular pipe jacking with tight gaps, this study takes the Shasan Station project of Shenzhen Metro Line 12 as a case study.A new anti-rolling device was developed, the upper and lower multi-screw conveyors for controlling soil pressure was designed, and a detachable steel ring as the tunnel portal structure was installed for left and right pipe jacking with tight gaps. Posture control technologies such as hinged hydraulic cylinder correction, cutterhead control correction, and soil grouting correction were combined to complete the jacking of extra-large section combined rectangular pipes with tight gaps. On-site measurement data show that after the pipe jacking was completed, the horizontal and vertical deviations of the pipe segments in both the left and right lines were within the design control values, meeting the specification requirements, with good control of the jacking pipe axis. The impact of secondary jacking with tight gaps on the posture of the pipe was analyzed, and it was found that the posture of the right line pipe fit well with the left line pipe. The lateral fit distance between the left and right pipes was reasonable, with no collision phenomenon observed. Although the distance between the jacking pipes was 15% larger than the set value, it still met the overall jacking construction requirements.
KeywordsExtra-large section,   Rectangular pipe jacking,   Construction with tight gaps,   Posture analysis,   Posture control,   Deviation correction technology     
作者简介: 金郑星(1992-),女,硕士,工程师,主要从事地下工程顶管施工技术等方面的工作,E-mail: 1392271092@qq.com. 通讯作者:周文朋(1988-),男,硕士,工程师,主要从事地下工程及隧道技术管理工作,E-mail:1213012947@qq.com.
引用本文:   
金郑星1 郭 平2 周文朋1 胡 桥4 苏 栋3 赵佳鑫1 孙 波5 .浅埋超大断面组合矩形顶管左右密贴顶进施工姿态控制技术研究[J]  现代隧道技术, 2025,V62(1): 259-266
JIN Zhengxing1 GUO Ping2 ZHOU Wenpeng1 HU Qiao? SU Dong3 ZHAO Jiaxin1 SUN Bo? .Research on Construction Posture Control Technology for Shallow Buried Extra-large Section Combined Rectangular Pipe Jacking with Tight Gaps[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(1): 259-266
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I1/259
 
没有本文参考文献
[1] 薛青松.大断面矩形顶管上跨地铁隧道施工变形分布特征及控制措施[J]. 现代隧道技术, 2024,61(6): 148-161
[2] 崔光耀1 戴艾蒙1 麻建飞2 宁茂权3,4.矩形顶管隧道施工碳排放计算方法及影响因素研究[J]. 现代隧道技术, 2024,61(4): 126-134
[3] 朱雁飞1 郭 彦1 王金一1 马建峰2 潘伟强1.全断面顶管法在饱和软土地层静安寺站地铁工程的研究与应用[J]. 现代隧道技术, 2024,61(2): 263-271
[4] 吴忠坦1 吴贤国2 刘 俊2 陈虹宇3 肖宏笛2,4 覃亚伟2,4.基于随机森林-NSGA-Ⅲ的盾构姿态优化控制[J]. 现代隧道技术, 2023,60(5): 48-57
[5] 陈锡武 1 卿伟宸 1 刘国强 2.高地应力断层带超大断面隧道施工设计[J]. 现代隧道技术, 2023,60(4): 204-212
[6] 许有俊 1,2,3 康佳旺 1 张 朝 1,2,3 黄正东 1 张 旭 1,2,3.矩形顶管隧道F型承插接头剪切破坏机制[J]. 现代隧道技术, 2023,60(3): 189-198
[7] 崔光耀 1 麻建飞 2 宁茂权 3,4 唐再兴 3,4 刘顺水 3,4 田宇航 1.软弱地层超大矩形顶管盾构隧道近接施工加固方案优选研究[J]. 现代隧道技术, 2023,60(2): 178-184
[8] 徐 宏 1 叶 飞 2 刘 奇 1 田黎明 1 安 欢 1.大断面矩形顶管施工地层变形及顶进参数控制研究[J]. 现代隧道技术, 2022,59(6): 97-105
[9] 甄 亮 1 张显裕 2,3 李晓军 2,3.浅埋矩形顶管整体背土效应判别方法应用与处理措施[J]. 现代隧道技术, 2022,59(2): 167-171
[10] 肖尊群 1,2,3 曹童童 1 许彩云 1 杨 凯 2 董琼英 1 姜亦男 1 耿星月 1 舒志鹏 1.基于叠加原理的大尺寸矩形截面竖向曲线顶管顶进力数值估算方法[J]. 现代隧道技术, 2021,58(6): 68-76
[11] 许有俊 1,2 黄正东 1,2 张 旭 1,2 张 朝 1,2 康佳旺 1,2 周 薇 1.大断面土压平衡矩形顶管多刀盘实测扭矩参数研究[J]. 现代隧道技术, 2021,58(5): 96-103
[12] 吴 波 1,2 彭逸勇 1,2 蒙国往 1,2 濮松权 3.软土地层大断面矩形顶管施工引起切口前方地表隆起分析[J]. 现代隧道技术, 2021,58(2): 86-92
[13] 杨 林 1,2 江 鸿 1,3 陈培帅 1,4 袁 青 1,3.浅埋大断面公路隧道塌方处治措施及效果分析[J]. 现代隧道技术, 2020,57(6): 207-213
[14] 尚友磊 1 谭 准 2.广州地铁流花路站超大断面暗挖工法优化[J]. 现代隧道技术, 2019,56(3): 177-185
[15] 张俊儒 1 欧小强 1,2 郑 强 1 龚彦峰 3.超大断面隧道在双层初期支护下的拆撑安全性研究[J]. 现代隧道技术, 2018,55(6): 108-116
Copyright 2010 by 现代隧道技术