超大断面隧道在双层初期支护下的拆撑安全性研究
(1西南交通大学交通隧道工程教育部重点实验室,成都 610031;2中铁西南科学研究院有限公司,成都 611731;3中铁第四勘察设计院集团有限公司,武汉 430063)
On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2 China Railway Southwest Research Institute Co., Ltd., Chengdu 611731; 3 China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063)
Download: PDF (4471KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 目前多线隧道及超大断面隧道的修建呈发展趋势。但在施作二次衬砌时,临时支撑的拆除将是整个结构受力转换的薄弱点,故保证拆撑过程中的结构安全具有重要意义。鉴于目前国内外关于超大断面隧道双层初期支护下的拆撑安全性分析仍缺乏系统的研究,文章结合实际工程,采用以数值分析为主,现场实测印证为辅的方式,对新考塘隧道拆撑时两层初期支护的内力演变以及各自的安全性进行了分析,初步证明了双层初期支护对于拆撑过程安全性的控制效果。研究结果表明:(1)在支护厚度和纵向一次性拆撑长度保持不变时,拆撑前后的安全系数表现为:双层初期支护下的二次初期支护>双层初期支护下的一次初期支护>单层初期支护。安全系数的变化幅度表现为:双层初期支护下的一次初期支护<单层初期支护<双层初期支护下的二次初期支护;(2)在支护形式相同时,随着一次性拆撑长度的增加,其安全系数呈现先增大后减小的趋势。根据各工况计算结果,该工程合理的一次性拆撑长度为 9 m左右。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: More and more multiple-track tunnels and super-large section tunnels have been built, and disman? tling of temporary strut is a weak point of the whole structure during force transfer when the secondary lining is constructed. It is significant to guarantee structure safety during dismantling of temporary strut. Little systematic research on safety in dismantling of temporary strut of the super-large section tunnel with double-layer primary support has been conducted, so the internal force and security of the two-layer primary support of the Xinkaotang tunnel were analyzed by a numerical analysis and site measurement, and it proves the effect of two-layer primary support on the safety during strut dismantling. The research results indicate that: (1) with constant support thickness and one-time longitudinal dismantling length, the safety factor of secondary primary support is larger than that of the first primary support, and the safety factor of the first primary support is larger than that of the single layer primary support. Change range of safety factor for the first primary support is smaller than that of the single-layer primary support, and the safe factor for the single-layer primary support is smaller than that of the secondary primary support; (2) with the same support pattern, the safety factors increase firstly and then decrease with an increase of the onetime dismantling length. The calculated results of various cases show that the reasonable one-time dismantling length for this project is about 9 m.
KeywordsSuper-large section tunnel,   Double-layer primary support,   Dismantling of temporary strut,   Safety fac? tor,   Dismantled length     
基金资助:

基金项目:国家自然科学基金(51378435);中铁第四勘察设计院集团有限公司科研项目(2014K46).

作者简介: 作者简介:张俊儒(1978-),男,博士,副教授,主要从事隧道围岩稳定性及其支护理论的研究,E-mail:swjtuzhjr@126.com.
引用本文:   
.超大断面隧道在双层初期支护下的拆撑安全性研究[J]  现代隧道技术, 2018,V55(6): 108-116
.On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(6): 108-116
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I6/108
 
没有本文参考文献
[1] 刘飞香 1,2.SCDZ133智能型隧道多功能作业台车及其施工技术[J]. 现代隧道技术, 2019,56(4): 1-7
[2] 周文波 吴惠明 赵 峻.泥岩地层常压刀盘盾构的掘进策略与分析[J]. 现代隧道技术, 2019,56(4): 8-15
[3] 陈卓立 1,2 朱训国 1,2 赵德深 1,2 王云平 1,2.深埋隧洞让压支护结构的锚固机理探究[J]. 现代隧道技术, 2019,56(4): 16-22
[4] 王全胜.矩形盾构法隧道管片分块案例分析及分块原则[J]. 现代隧道技术, 2019,56(4): 23-29
[5] 张 恒 1 朱亦墨 1 林 放 1 陈寿根 1 杨家松 2.基于Q系统的地下洞库中台阶最佳开挖高度研究[J]. 现代隧道技术, 2019,56(4): 30-37
[6] 李 好.大断面岩溶隧道贯通段地质情况的无线电波透视试验探测[J]. 现代隧道技术, 2019,56(4): 38-42
[7] 岑培山 1 田坤云 2 王喜民 3.蒙华铁路阳山隧道瓦斯危害性评估研究[J]. 现代隧道技术, 2019,56(4): 43-49
[8] 朱建峰 1 宫全美 2.软土地层盾构隧道长期沉降离心试验研究[J]. 现代隧道技术, 2019,56(4): 49-55
[9] 陈柚州 1 任 涛 2 邓 朋 2 王 斌 3.基于人工蜂群优化小波神经网络的隧道沉降预测[J]. 现代隧道技术, 2019,56(4): 56-61
[10] 王登茂 滕振楠 田志宇 陈志学.桃园至巴中高速公路八庙隧道非常规岩爆段病害处治与设计反思[J]. 现代隧道技术, 2019,56(4): 62-68
[11] 吴树元 1 程 勇 1 谢全敏 2 刘继国 1 陈必光 1.西藏米拉山隧道围岩大变形成因分析[J]. 现代隧道技术, 2019,56(4): 69-73
[12] 王 睢 1,2,3 钟祖良 3 刘新荣 3 吴 波 1,2,4 赵勇博 1,2 李占涛 1,2.基于D-P准则有压圆形衬砌隧洞弹塑性解[J]. 现代隧道技术, 2019,56(4): 74-80
[13] 李 明 严松宏 潘春阳 张旭斌.富水大断面黄土隧道开挖流固耦合效应分析[J]. 现代隧道技术, 2019,56(4): 81-88
[14] 张 凯 1 陈寿根 2 霍晓龙 3 谭信荣 4.岩溶地区隧道涌水风险的可拓评价模型及应用[J]. 现代隧道技术, 2019,56(4): 89-96
[15] 李 杰 1 张 斌 1 付 柯 1 马 超 1 郭京波 1 牛得草 2.基于现场掘进数据的复合地层盾构掘进性能预测方法研究[J]. 现代隧道技术, 2019,56(4): 97-104