超大断面隧道在双层初期支护下的拆撑安全性研究
(1西南交通大学交通隧道工程教育部重点实验室,成都 610031;2中铁西南科学研究院有限公司,成都 611731;3中铁第四勘察设计院集团有限公司,武汉 430063)
On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support
(1 Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, Chengdu 610031; 2 China Railway Southwest Research Institute Co., Ltd., Chengdu 611731; 3 China Railway Siyuan Survey and Design Institute Group Co., Ltd., Wuhan 430063)
Download: PDF (4471KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 目前多线隧道及超大断面隧道的修建呈发展趋势。但在施作二次衬砌时,临时支撑的拆除将是整个结构受力转换的薄弱点,故保证拆撑过程中的结构安全具有重要意义。鉴于目前国内外关于超大断面隧道双层初期支护下的拆撑安全性分析仍缺乏系统的研究,文章结合实际工程,采用以数值分析为主,现场实测印证为辅的方式,对新考塘隧道拆撑时两层初期支护的内力演变以及各自的安全性进行了分析,初步证明了双层初期支护对于拆撑过程安全性的控制效果。研究结果表明:(1)在支护厚度和纵向一次性拆撑长度保持不变时,拆撑前后的安全系数表现为:双层初期支护下的二次初期支护>双层初期支护下的一次初期支护>单层初期支护。安全系数的变化幅度表现为:双层初期支护下的一次初期支护<单层初期支护<双层初期支护下的二次初期支护;(2)在支护形式相同时,随着一次性拆撑长度的增加,其安全系数呈现先增大后减小的趋势。根据各工况计算结果,该工程合理的一次性拆撑长度为 9 m左右。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
关键词:   
Abstract: More and more multiple-track tunnels and super-large section tunnels have been built, and disman? tling of temporary strut is a weak point of the whole structure during force transfer when the secondary lining is constructed. It is significant to guarantee structure safety during dismantling of temporary strut. Little systematic research on safety in dismantling of temporary strut of the super-large section tunnel with double-layer primary support has been conducted, so the internal force and security of the two-layer primary support of the Xinkaotang tunnel were analyzed by a numerical analysis and site measurement, and it proves the effect of two-layer primary support on the safety during strut dismantling. The research results indicate that: (1) with constant support thickness and one-time longitudinal dismantling length, the safety factor of secondary primary support is larger than that of the first primary support, and the safety factor of the first primary support is larger than that of the single layer primary support. Change range of safety factor for the first primary support is smaller than that of the single-layer primary support, and the safe factor for the single-layer primary support is smaller than that of the secondary primary support; (2) with the same support pattern, the safety factors increase firstly and then decrease with an increase of the onetime dismantling length. The calculated results of various cases show that the reasonable one-time dismantling length for this project is about 9 m.
KeywordsSuper-large section tunnel,   Double-layer primary support,   Dismantling of temporary strut,   Safety fac? tor,   Dismantled length     
基金资助:

基金项目:国家自然科学基金(51378435);中铁第四勘察设计院集团有限公司科研项目(2014K46).

作者简介: 作者简介:张俊儒(1978-),男,博士,副教授,主要从事隧道围岩稳定性及其支护理论的研究,E-mail:swjtuzhjr@126.com.
引用本文:   
.超大断面隧道在双层初期支护下的拆撑安全性研究[J]  现代隧道技术, 2018,V55(6): 108-116
.On Safety in Dismantling Temporary Strut of Super-large Tunnels with Double-layer Primary Support[J]  MODERN TUNNELLING TECHNOLOGY, 2018,V55(6): 108-116
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2018/V55/I6/108
 
没有本文参考文献
[1] 李瑞俊1 宋宗莹2 李 琛1 王文斌2 任育珍3,4 蔡建华3,4 张家旭3,4.重载铁路梁家山隧道病害多源融合诊断与处置对策[J]. 现代隧道技术, 2025,62(4): 301-308
[2] 张小龙.桩基荷载作用下地铁盾构隧道结构力学响应分析[J]. 现代隧道技术, 2025,62(4): 82-89
[3] 李克玺1,2 党建东3 张 见3 叶光祥4 王晓军1,2 陈青林1,2 曹世荣2 张 河1,2.基于声发射特征参数的不同类型砂岩破裂特征研究[J]. 现代隧道技术, 2025,62(4): 26-36
[4] 周彩荣1 易黎明1 马山青2 周 蠡3 于金弘4,5.三点加载下高性能纤维混凝土顶管承载特性及配筋方案研究[J]. 现代隧道技术, 2025,62(4): 50-60
[5] 郭永军1 李 超2 郑建国3 于永堂4 朱才辉5.地面堆载对西安黄土地层中既有盾构管片影响研究[J]. 现代隧道技术, 2025,62(4): 61-72
[6] 王永刚1 崔翌堃1 吴九七2,3 黄 俊4 沈 翔2,3 杨 奎4 苏 栋2,3.考虑不同磨损形式下的滚刀受力与磨损对比分析[J]. 现代隧道技术, 2025,62(4): 73-81
[7] 冯冀蒙1,2 宋佳黛1,2 王圣涛3 李艺飞1,2 张俊儒1,2 王好明4 汪 波1,2.填海地层特大断面隧道超长管棚变形控制 效能研究[J]. 现代隧道技术, 2025,62(4): 155-162
[8] 徐才坚1 陈星宇1 雷明林1 张兴龙2 孙怀远2 李晓军2.隧道施工掌子面前方围岩富水性数字孪生与风险决策[J]. 现代隧道技术, 2025,62(4): 90-99
[9] 杨 颖1 倪 凯1 葛 林2 张明飞3 王晓睿4.弱光条件下基于改进Unet模型的隧道渗水病害图像分割[J]. 现代隧道技术, 2025,62(4): 100-110
[10] 苏开春1 付 锐2,3 曾弘锐2,3 冷希乔4 郭 春2,3.基于DBO-A-LSTM的公路隧道短时多步交通量预测[J]. 现代隧道技术, 2025,62(4): 111-121
[11] 熊 颖1,2 张俊儒1,2 范子焱1,2 陈佳豪1,2 马荐驰1,2 陈鹏涛1,2 谭瑞锋3,4.层状软岩中爆破应力波传播与振动衰减特性研究[J]. 现代隧道技术, 2025,62(4): 122-131
[12] 刘 杨1 邵泽楷2 田浩帆2 张汝溪1 郑 波3 王峥峥2.高速公路隧道下穿房柱式煤矿采空区爆破施工煤柱 损伤规律研究[J]. 现代隧道技术, 2025,62(4): 132-144
[13] 罗志洋1 张春瑜2,3 王立川1,2,4,5 徐 烁1 李利平4 王倩倩5 刘志强6.TBM裂隙岩体隧洞涌水机制及注浆堵水研究[J]. 现代隧道技术, 2025,62(4): 145-154
[14] 周弋力1 封 坤1 郭文琦1 张亮亮2 李春林3.超大直径盾构隧道管片纵缝抗弯力学行为与损伤过程研究[J]. 现代隧道技术, 2025,62(4): 163-173
[15] 易 丹1 薛皓匀2 杨绍毅2 喻 波1 封 坤2 林 刚1.盾构隧道管片结构螺栓失效对横向地震响应的影响分析[J]. 现代隧道技术, 2025,62(4): 174-181
Copyright 2010 by 现代隧道技术