[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2025, Vol. 62 Issue (3) :40-49    DOI:
理论研究与探讨 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
不同形式拱架初期支护变形规律实测与数值研究
(1.四川省公路规划勘察设计研究院有限公司,成都 610041;2.石家庄铁道大学土木工程学院,石家庄 050043;3.中铁西南科学研究院有限公司,成都 611731)
Field Measurement and Numerical Study on Deformation Behavior of Initial Supports with Different Arch Types
(1. Sichuan Highway Planning, Survey, Design and Research Institute Co., Ltd., Chengdu 610041; 2.School of Civil Engineering, Shijiazhuang Tiedao University, Shijiazhuang 050043; 3.China Railway Southwest Research Institute Co., Ltd., Chengdu 611731)
Download: PDF (7699KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为研究软弱松散围岩隧道中不同形式拱架结构的受力及变形特征,以乐西高速公路毕莫园隧道为工程背景,采用现场试验与数值模拟相结合的方法,对比分析?159×5 mm、?140×6 mm、120 mm×120 mm×5 mm钢管混凝土拱架以及I20b型钢拱架在隧道开挖后的力学响应。研究结果表明:与I20b型钢拱架相比,钢管混凝土拱架的用钢量减少36.2%~41.9%,喷射混凝土用量降低15%~30%,监测位移减少63.08%~72.31%,且拱顶处监测应力值更大,围岩塑性区范围更小;4种拱架支护下,围岩在边墙及拱脚处易发生剪切和张拉破坏,拱架竖向最大位移均发生在拱底,中心点隆起值为11.28~11.8 mm。钢管混凝土拱架兼具材料的经济性与高刚度和高强度的支护性,但在边墙、拱脚处仍存在较大范围的围岩塑性区,建议通过注浆加固或优化锚杆支护参数等措施提高围岩稳定性。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2
关键词钢管混凝土   隧道支护   结构变形   现场试验   数值模拟     
Abstract: :To investigate the mechanical and deformation characteristics of different arch support structures in tun? nels with weak and loose surrounding rock, the Bimoyuan Tunnel on the Leshan-Xichang Expressway was selected as the engineering background. A combined approach of field tests and numerical simulations was employed to compare the mechanical responses of four types of initial support arches after tunnel excavation: ?159×5 mm, ?140×6 mm,and 120 mm×120 mm×5 mm concrete-filled steel tube (CFST) arches, and I20b steel arches. Results show that compared with the I20b steel arches, the CFST arches reduce steel consumption by 36.2%~41.9%, shotcrete volume by15%~30%, and measured displacement by 63.08%~72.31%. However, the maximum monitored stress values were observed in CFST arches, and the range of the surrounding rock plastic zone was significantly smaller. Under all four arch support types, shear and tensile failures were more likely to occur at the sidewalls and arch feet, and the maximum vertical displacement of the arches occurred at the arch bottom, with central uplift values ranging from 11.28 mm to 11.8 mm. Therefore, CFST arches offer a favorable combination of material efficiency, high stiffness, and strong support capacity. Nevertheless, substantial plastic zones still exist at the sidewalls and arch feet. It is recommended to improve the stability of the surrounding rock by grouting reinforcement or optimizing rock bolt support parameters.
KeywordsConcrete-filled steel tube (CFST),   Tunnel support,   Structural deformation,   Field testing,   Numerical simulation     
作者简介: 葛正辉(1986-),男,硕士研究生,高级工程师,主要从事隧道与地下工程结构方面的研究工作,E-mail: 236415308@qq.com. 通讯作者:郑建国(1979-),男,硕士研究生,正高级工程师,主要从事公路隧道勘察设计及科研工作,E-mail:65224545@qq.com.
引用本文:   
葛正辉1 郑建国1 李新志2 陈 鹏3 宁志玮2 王鹏程2 .不同形式拱架初期支护变形规律实测与数值研究[J]  现代隧道技术, 2025,V62(3): 40-49
GE Zhenghui ZHENG Jianguo1 LI Xinzhi CHEN Peng3 NING Zhiwei WANG Pengcheng2 .Field Measurement and Numerical Study on Deformation Behavior of Initial Supports with Different Arch Types[J]  MODERN TUNNELLING TECHNOLOGY, 2025,V62(3): 40-49
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2025/V62/I3/40
 
没有本文参考文献
[1] 胡云进1,,2,3 朱铭伟1,2,3 郜会彩1,2,3 任智豪1,2,3.地下水渗流对能源盾构隧道换热性能的影响[J]. 现代隧道技术, 2025,62(3): 50-59
[2] 李玉华1 高亚伟1 钟秋锋1 秦丽绚2 李俊杰2 程志明2 黄永辉2.不同掏槽孔角度下隧道楔形掏槽爆破效果研究[J]. 现代隧道技术, 2025,62(3): 108-116
[3] 李瀚源1,2 冯 劲1 郭洪雨1 谢雄耀2 周红升1 孙 飞1.海底盾构隧道双层衬砌结构联合承载力学特性研究[J]. 现代隧道技术, 2025,62(3): 126-138
[4] 苏 恒1 王士民1 朱旭红2 秦善良3.考虑空间效应的盾构刀具切削桩基主筋力学特征研究[J]. 现代隧道技术, 2025,62(3): 139-150
[5] 王帅帅1 傅一帆2,3 徐 勇1 史经峰1 郭 春2,3.通过接力风机进行风量分配的隧道施工风仓式通风参数研究[J]. 现代隧道技术, 2025,62(3): 240-248
[6] 李 敬1 罗禄森1 张柏林2 胡浩然2.辅助隧道封闭后隧道内瓦斯运移富集规律研究[J]. 现代隧道技术, 2025,62(2): 201-211
[7] 郭 盈 彭文庆 陈世强 张 琼 王佳伟.隧道行车道通风模型试验当量长度计算方法与验证[J]. 现代隧道技术, 2025,62(2): 230-240
[8] 易壮鹏 王申奥 唐新超 陈志威.基于CFD的多车道宽幅悬浮隧道管体涡激振动特性研究[J]. 现代隧道技术, 2025,62(1): 92-102
[9] 沐海星1 封 坤1 郭文琦1 杨绍毅1 张亮亮2.超大直径盾构隧道管片结构力学行为与破坏特征研究[J]. 现代隧道技术, 2025,62(1): 125-134
[10] 万东兴1 张 迪2 孙 峰2 潘辰昕3 朱振伟1 徐晓峰1 何 超1 申屠琪1.超大直径浅埋盾构隧道施工期管片结构力学响应研究[J]. 现代隧道技术, 2025,62(1): 135-146
[11] 陈 旺1 彭焱锋1 刘维正2 张思宇2 陈常辉1.三孔顶管上穿施工对既有隧道与地表变形影响分析[J]. 现代隧道技术, 2025,62(1): 170-182
[12] 张成友1 汪 波1 杜泽昊1 高筠涵1 谭力豪2.不同锚杆支护体系防岩爆适宜性分析与锚杆参数优化研究[J]. 现代隧道技术, 2024,61(6): 64-73
[13] 匡 亮1 粟 威1 陶伟明1 田四明2 申玉生3 黎 旭2 汪辉武1.跨走滑断层隧道结构影响分区及设防范围研究[J]. 现代隧道技术, 2024,61(6): 45-54
[14] 邱 伟1 曾庆成1 欧阳剑1 沐海星2 郭文琦2 封 坤2 胡大伟3.盾构隧道凹凸榫-斜螺栓构造环缝抗剪力学性能研究[J]. 现代隧道技术, 2024,61(6): 129-138
[15] 王圣涛1 张俊儒2 彭 波1 燕 波3.拱隧一体结构跨越巨型溶洞段处治技术研究[J]. 现代隧道技术, 2024,61(5): 263-273
Copyright 2010 by 现代隧道技术