[an error occurred while processing this directive]
 
       首 页  |  期刊介绍  |  编委会  |  投稿指南  |  期刊订阅  |  广告合作  |  留言板  |  联系我们 |  English
现代隧道技术 2019, Vol. 56 Issue (5) :1-12    DOI:
特约稿 最新目录 | 下期目录 | 过刊浏览 | 高级检索 << [an error occurred while processing this directive] | [an error occurred while processing this directive] >>
超特长隧洞集群TBM试掘进阶段存在的问题与施工技术发展方向
(1新疆额尔齐斯河流域开发工程建设管理局,乌鲁木齐 830000;2北京交通大学土木建筑工程学院,北京100044)
Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology
(1 Xinjiang Erqis River Basin Development and Construction Administration Bureau, Urumqi 830000;2 School of Civil Engineering,Beijing Jiaotong University, Beijing 100044)
Download: PDF (5208KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 北疆供水二期工程总长540 km,其中隧洞段长度516 km。隧洞采用以TBM为主并结合钻爆法进行施工,其中支洞施工采用 2 台 TBM,正洞施工采用 18 台 TBM 和 3 台盾构。单台掘进长度均超过 15 km,最长掘进 26km。TBM施工面临着集群掘进、不良地质及极硬岩穿越、超长距离施工等风险和难题,对隧洞的设计与施工技术提出了新的挑战。通过试掘进阶段的工作总结与分析,为进一步提高TBM的安全高效掘进技术水平,文章提出了超特长隧洞TBM施工今后发展的几个研究方向:1)适应TBM快速掘进的实时超前地质预报技术;2)地质适应性更强的TBM装备;3)智能化掘进技术;4)设备状态实时监测技术;5)围岩分级方法及相应的支护体系;6)辅助破岩技术;7)超长距离隧洞独头高压通风技术;8)超长距离皮带运输技术。通过改进TBM设备性能、优化隧洞设计和施工技术,从而提高设备对各种地质的适应能力,实现超长隧洞TBM的安全高效掘进。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
邓铭江 1 谭忠盛 2
关键词:   
Abstract: The total length of the water transfer project phase Ⅱ is 540 km in the northern area of Xinjiang Uygur Autonomous Region of China, of which the total length of tunnels is about 516 km. The tunnel boring machine (TBM) and drilling & blasting method were adopted for the tunnel construction, the main tunnels include 18 TBM tunnelling sections and 3 shield tunnelling sections, and the branch tunnels include 2 TBM tunnelling sections. The tunnelling length of single TBM is more than 15 km, and the maximum tunnelling distance is up to 26 km. It poses unprecedented challenges on the tunnel design and construction technique due to the group driving, adverse geology and extreme hard rock, long tunnelling distance by TBM and other construction risks and difficulties. Based on the summary and analysis of the TBM performance in the trial tunnelling, several aspects on the development directions of TBM construction of super-long tunnels were put forward to improve the technical level of safe and efficient TBM tunnelling. Namely, real-time advance geological prediction technique for rapid TBM excavation should be studied;developing of the TBM equipment with better geologic adaptability should be conducted; the intelligent TBM tunnelling technique should be studied; the real-time monitoring technique for TBM equipment state should be studied;the surrounding rock classification and corresponding supporting system should be studied; the auxiliary rock breaking technique should be developed; the one-end high-pressure ventilation technique for the super-long tunnel should be studied; the belt conveyor transportation technique should be developed for the super-long tunnel. By improving performance of TBM equipment and optimizing tunnel design and construction method, the adaptability of TBM equipment to various geological conditions is increased and safe and efficient TBM tunnelling for super-long tunnels is realized.
KeywordsSuper-long tunnel,   TBM advance,   Real-time geological prediction,   Intelligent driving,   Rock mass clas? sification for the TBM tunnel,   Auxiliary rock breaking,   High-pressure ventilation     
作者简介: 作者简介:邓铭江(1960-),男,博士,教授级高级工程师,中国工程院院士,主要从事水利工程建设和水资源研究工作,E-mail: xjdmj@163.com. 通讯作者:谭忠盛(1963-),男,博士,教授,博士生导师,主要从事隧道及地下工程方面的研究工作,E-mail:zstan@vip.sina.com.
引用本文:   
邓铭江 1 谭忠盛 2 .超特长隧洞集群TBM试掘进阶段存在的问题与施工技术发展方向[J]  现代隧道技术, 2019,V56(5): 1-12
DENG Mingjiang1 TAN Zhongsheng2 .Some Issues during TBM Trial Advance of Super-long Tunnel Group and Development Direction of Construction Technology[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 1-12
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I5/1
 
没有本文参考文献
[1] 范 磊.高地温深埋特长隧道热害综合防治关键技术研究[J]. 现代隧道技术, 2019,56(6): 1-10
[2] 高菊茹 1 张 博 1 王 耀 1 渠浩波 1 姚志军 2.高海拔特长公路隧道施工作业环境改善关键技术研究[J]. 现代隧道技术, 2019,56(6): 11-18
[3] 柳 献 1 李海涛 1 管攀峰 2 杨志豪 2.快速接头盾构隧道衬砌结构设计参数研究[J]. 现代隧道技术, 2019,56(6): 19-26
[4] 李 强 1 甘鹏路 2,3 钟小春 4.盾构隧道管片壁后注浆厚度对隧道抗浮影响研究[J]. 现代隧道技术, 2019,56(6): 27-35
[5] 李荣欣 1 陈骅伟 2 周松元 1 刘新平 1.含油气隧道瓦斯成因分析与安全治理[J]. 现代隧道技术, 2019,56(6): 36-40
[6] 唐 斌.成都地铁龙泉山隧道浅层天然气分布特征及运移规律研究[J]. 现代隧道技术, 2019,56(6): 41-46
[7] 秦 良 1 张庆朝 2.瞬变电磁法隧道超前地质预报物理模拟[J]. 现代隧道技术, 2019,56(6): 47-51
[8] 张民庆 黎 庶 刘俊成.横向内置加劲型中埋式橡胶止水带研制[J]. 现代隧道技术, 2019,56(6): 52-56
[9] 麻世垄 吴明颖 姚兆明.人工冻土蠕变试验及损伤经验模型分析[J]. 现代隧道技术, 2019,56(6): 57-62
[10] 马 莉 1 李 盛 2 王起才 2 于本田 2 刘亚朋 2 王庆石 2.高填黄土矩形、拱形明洞减载结构土压力差异性规律研究[J]. 现代隧道技术, 2019,56(6): 63-69
[11] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
[12] 刘明才.隧道超欠挖下锚喷支护系统的稳定性分析[J]. 现代隧道技术, 2019,56(6): 78-84
[13] 于建新 1 刘焕春 2 魏海霞 1 陈 晨 1.近邻隧道爆破施工相互动力影响研究[J]. 现代隧道技术, 2019,56(6): 85-92
[14] 谢立广 1 杨 群 2 盛 湧 1 唐富军 1.关于公路隧道健康状况均衡评估模型的探索[J]. 现代隧道技术, 2019,56(6): 93-98
[15] 孙浩轩 1 李培现 1 崔希民 1 姚德华 2 肖 武 3.巴岳山隧道受煤矿采动影响分析[J]. 现代隧道技术, 2019,56(6): 99-106
Copyright 2010 by 现代隧道技术