九度地震区公路隧道二次衬砌结构抗震综合措施研究
(1云南省交通投资建设集团有限公司,昆明 650100;2苏交科集团股份有限公司,南京 210019;3北京交通大学,北京 100044)
Study on the Comprehensive Aseismic Measures for the Secondary Lining Structure of Highway Tunnels in Nine-degree Seismic Region
(1 Yunnan Communications Investment & Construction Group Co., Ltd., Kunming 650100;2 JSTI Group, Nanjing 210019;3 Beijing Jiaotong University, Beijing 100044)
Download: PDF (1614KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 为对九度地震区公路隧道二次衬砌结构抗震措施的研究提供参考和借鉴,文章基于Hilber-HughesTaylor时间积分法及等效粘弹性单元动力边界条件,以穿越九度区的公路隧道为研究对象,从实际工程设计受力的角度对公路隧道的四种抗震措施,即增加二次衬砌的配筋量,增大二次衬砌的厚度,将马蹄形断面优化为圆形断面,在初期支护与二次衬砌之间增设橡胶减震层,进行了具体抗震计算和分析,得到了四种抗震措施的实际抗震效果及其优缺点。为了将抗震措施的优点利用最大化,提出了通过适当增加配筋和在初期支护与二次衬砌之间设置适当厚度减震层的抗震综合措施。利用上述研究成果,根据九度区可能出现的不同峰值加速度(0.1g~0.9g)的地震波作用下二次衬砌的受力情况,分别提出了针对性的抗震措施,以达到既经济又显著的抗震效果。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
王秋懿 1 杨 奎 2 毛金龙 2 杨清源 3 赵伯明 3
关键词:   
Abstract: To provide reference of the seismic countermeasures for the secondary lining structure of highway tunnels in the earthquake area with nine-degree seismic intensity, based on Hilber-Hughes-Taylor′s time integration method and dynamic boundary condition of equivalent viscous-spring element, the following four aseismic measures were proposed from the aspect of designed force, by taking the highway tunnel passing through the area with nine-degree seismic intensity as the background, specifically the four measures include increase of reinforcement of secondary lining,increase of the thickness of secondary lining, optimization of horseshoe section to the round section and addition of rubber absorption layer between the primary support and secondary lining. Through aseismic calculation and analysis, the actual aseismic effect, the advantages and disadvantages of the four countermeasures were understood. To maximize the advantages of the aseismic measures, a combining countermeasure of increase of reinforcement and addition of shock absorption layer between primary support and secondary lining was put forward. Based on the research achievements, the corresponding aseismic measures were proposed in light of the force on secondary lining under the effect of seismic wave with different peak accelerations (0.1g-0.9g)in the area with nine-degree seismic intensity.
KeywordsHighway tunnel,   Seismic region with nine-degree intensity,   Comprehensive earthquake resistance,   Aseismic measure     
作者简介: 作者简介:王秋懿(1977-),男,高级工程师,主要从事铁路、公路工程建设项目技术管理工作,E-mail:951549901@qq.com. 通讯作者:杨 奎(1983-),男,硕士,工程师,主要从事岩土工程、隧道及地下工程相关设计和研究工作,E-mail:yk60@jsti.com.
引用本文:   
王秋懿 1 杨 奎 2 毛金龙 2 杨清源 3 赵伯明 3 .九度地震区公路隧道二次衬砌结构抗震综合措施研究[J]  现代隧道技术, 2019,V56(5): 42-49
WANG Qiuyi1 YANG Kui2 MAO Jinlong2 YANG Qingyuan3 ZHAO Boming3 .Study on the Comprehensive Aseismic Measures for the Secondary Lining Structure of Highway Tunnels in Nine-degree Seismic Region[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 42-49
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I5/42
 
没有本文参考文献
[1] 范 磊.高地温深埋特长隧道热害综合防治关键技术研究[J]. 现代隧道技术, 2019,56(6): 1-10
[2] 高菊茹 1 张 博 1 王 耀 1 渠浩波 1 姚志军 2.高海拔特长公路隧道施工作业环境改善关键技术研究[J]. 现代隧道技术, 2019,56(6): 11-18
[3] 柳 献 1 李海涛 1 管攀峰 2 杨志豪 2.快速接头盾构隧道衬砌结构设计参数研究[J]. 现代隧道技术, 2019,56(6): 19-26
[4] 李 强 1 甘鹏路 2,3 钟小春 4.盾构隧道管片壁后注浆厚度对隧道抗浮影响研究[J]. 现代隧道技术, 2019,56(6): 27-35
[5] 李荣欣 1 陈骅伟 2 周松元 1 刘新平 1.含油气隧道瓦斯成因分析与安全治理[J]. 现代隧道技术, 2019,56(6): 36-40
[6] 唐 斌.成都地铁龙泉山隧道浅层天然气分布特征及运移规律研究[J]. 现代隧道技术, 2019,56(6): 41-46
[7] 秦 良 1 张庆朝 2.瞬变电磁法隧道超前地质预报物理模拟[J]. 现代隧道技术, 2019,56(6): 47-51
[8] 张民庆 黎 庶 刘俊成.横向内置加劲型中埋式橡胶止水带研制[J]. 现代隧道技术, 2019,56(6): 52-56
[9] 麻世垄 吴明颖 姚兆明.人工冻土蠕变试验及损伤经验模型分析[J]. 现代隧道技术, 2019,56(6): 57-62
[10] 马 莉 1 李 盛 2 王起才 2 于本田 2 刘亚朋 2 王庆石 2.高填黄土矩形、拱形明洞减载结构土压力差异性规律研究[J]. 现代隧道技术, 2019,56(6): 63-69
[11] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
[12] 刘明才.隧道超欠挖下锚喷支护系统的稳定性分析[J]. 现代隧道技术, 2019,56(6): 78-84
[13] 于建新 1 刘焕春 2 魏海霞 1 陈 晨 1.近邻隧道爆破施工相互动力影响研究[J]. 现代隧道技术, 2019,56(6): 85-92
[14] 谢立广 1 杨 群 2 盛 湧 1 唐富军 1.关于公路隧道健康状况均衡评估模型的探索[J]. 现代隧道技术, 2019,56(6): 93-98
[15] 孙浩轩 1 李培现 1 崔希民 1 姚德华 2 肖 武 3.巴岳山隧道受煤矿采动影响分析[J]. 现代隧道技术, 2019,56(6): 99-106
Copyright 2010 by 现代隧道技术