泥质粉砂岩地层中后行盾构隧道近接施工对大断面矿山法隧道的影响研究
(西南交通大学土木工程学院,交通隧道工程教育部重点实验室,成都 610031)
Study on the Influence of Approaching Construction of the Trailing Shielddriven Tunnel on the Large-section Mined Tunnel in Argillaceous Siltstone Stratum
(Key Laboratory of Transportation Tunnel Engineering of Ministry of Education; School of Civil Engineering, Southwest Jiaotong University, Chengdu 610031)
Download: PDF (5227KB)   HTML (1KB)   Export: BibTeX or EndNote (RIS)      Supporting Info
摘要 两条以上隧道近距离施工时,将导致既有隧道与新建隧道结构的受力变化,带来工法、工序与施工对策优化等问题。文章以长沙轨道交通3号线盾构隧道近接大断面矿山法隧道施工为工程依托,针对泥质粉砂岩地层,采用数值模拟和模型试验的手段,研究盾构隧道近接矿山法隧道施工的影响规律,并基于地表沉降准则提出影响分区。研究表明:盾构法隧道施工中,盾构开挖距离研究断面1倍洞径至研究断面完成管片拼装这一过程,是引起对应地表沉降增加及既有矿山法结构附加位移增长的主要阶段;对矿山法隧道结构的影响以竖向附加变形为主,具体表现为矿山法隧道整体上浮,越靠近盾构隧道的结构受影响越大;内力影响表现为矿山法隧道结构内力不均匀变化,靠近盾构隧道一侧结构受压加强,远离盾构隧道一侧结构易发生受拉破坏。
Service
把本文推荐给朋友
加入我的书架
加入引用管理器
Email Alert
RSS
作者相关文章
张俊儒 叶 伦 严丛文 刘丁丁 崔 耀 冯冀蒙
关键词:   
Abstract: Adjacent construction of more than two tunnels will cause force changes of both existing and new tun? nels, and it′ s necessary to consider optimization issues of construction method, procedure, countermeasures and so on. Based on the construction of the shield-driven tunnel approaching the large-section mined tunnel of Changsha metro line 3, the numerical simulation and model test methods were adopted to study the effect of shield-driven tunnelling on adjacent mined tunnel in argillaceous siltstone stratum, and a concept of influence zoning was proposed in light of the criterion of ground surface settlement. Research results show that increase of corresponding surface settlement and additional displacement of existing mined tunnel are mainly caused during the process of shield driving which starts from 1 time tunnel diameter away from the studied section and finishes at completion of segment erection at the studied section ; in terms of the effect on the mined tunnel, vertical additional deformation is of the main form and it presents as overall tunnel heaving, the closer the existing tunnel structure to the shield-driven tunnel, the greater the influence; regarding the influence on internal force, it is manifested in uneven change of internal force of the existing mined tunnel structure, the existing tunnel structure near the shield-driven tunnel is more compressed and it is liable to occur tensile failure at the side far away from the shield-driven tunnel.
KeywordsShield-driven tunnel,   Large-section mined tunnel,   Argillaceous siltstone,   Approaching construction,   Influence zoning,   Construction influence     
基金资助:基金项目:中国中铁股份有限公司科技开发计划重点项目(2017-重点-14)
作者简介: 作者简介:张俊儒(1978-),男,副教授,博士生导师,主要从事隧道围岩稳定性和支护理论方面的研究工作,E-mail: jrzh@swjtu.edu.cn. 通讯作者:冯冀蒙(1986-),男,讲师,硕士生导师,主要从事复杂条件下隧道施工关键技术研究工作,E-mail: fengjm@swjtu.edu.cn.
引用本文:   
张俊儒 叶 伦 严丛文 刘丁丁 崔 耀 冯冀蒙 .泥质粉砂岩地层中后行盾构隧道近接施工对大断面矿山法隧道的影响研究[J]  现代隧道技术, 2019,V56(5): 122-132
ZHANG Junru YE Lun YAN Congwen LIU Dingding CUI Yao FENG Jimeng .Study on the Influence of Approaching Construction of the Trailing Shielddriven Tunnel on the Large-section Mined Tunnel in Argillaceous Siltstone Stratum[J]  MODERN TUNNELLING TECHNOLOGY, 2019,V56(5): 122-132
链接本文:  
http://www.xdsdjs.com/CN/      或     http://www.xdsdjs.com/CN/Y2019/V56/I5/122
 
没有本文参考文献
[1] 范 磊.高地温深埋特长隧道热害综合防治关键技术研究[J]. 现代隧道技术, 2019,56(6): 1-10
[2] 高菊茹 1 张 博 1 王 耀 1 渠浩波 1 姚志军 2.高海拔特长公路隧道施工作业环境改善关键技术研究[J]. 现代隧道技术, 2019,56(6): 11-18
[3] 柳 献 1 李海涛 1 管攀峰 2 杨志豪 2.快速接头盾构隧道衬砌结构设计参数研究[J]. 现代隧道技术, 2019,56(6): 19-26
[4] 李 强 1 甘鹏路 2,3 钟小春 4.盾构隧道管片壁后注浆厚度对隧道抗浮影响研究[J]. 现代隧道技术, 2019,56(6): 27-35
[5] 李荣欣 1 陈骅伟 2 周松元 1 刘新平 1.含油气隧道瓦斯成因分析与安全治理[J]. 现代隧道技术, 2019,56(6): 36-40
[6] 唐 斌.成都地铁龙泉山隧道浅层天然气分布特征及运移规律研究[J]. 现代隧道技术, 2019,56(6): 41-46
[7] 秦 良 1 张庆朝 2.瞬变电磁法隧道超前地质预报物理模拟[J]. 现代隧道技术, 2019,56(6): 47-51
[8] 张民庆 黎 庶 刘俊成.横向内置加劲型中埋式橡胶止水带研制[J]. 现代隧道技术, 2019,56(6): 52-56
[9] 麻世垄 吴明颖 姚兆明.人工冻土蠕变试验及损伤经验模型分析[J]. 现代隧道技术, 2019,56(6): 57-62
[10] 马 莉 1 李 盛 2 王起才 2 于本田 2 刘亚朋 2 王庆石 2.高填黄土矩形、拱形明洞减载结构土压力差异性规律研究[J]. 现代隧道技术, 2019,56(6): 63-69
[11] 郭 健 1,2 杨治国 1,2 康逢学 3.基于向量投影响应面法的隧道围岩变形稳定可靠度分析[J]. 现代隧道技术, 2019,56(6): 70-77
[12] 刘明才.隧道超欠挖下锚喷支护系统的稳定性分析[J]. 现代隧道技术, 2019,56(6): 78-84
[13] 于建新 1 刘焕春 2 魏海霞 1 陈 晨 1.近邻隧道爆破施工相互动力影响研究[J]. 现代隧道技术, 2019,56(6): 85-92
[14] 谢立广 1 杨 群 2 盛 湧 1 唐富军 1.关于公路隧道健康状况均衡评估模型的探索[J]. 现代隧道技术, 2019,56(6): 93-98
[15] 孙浩轩 1 李培现 1 崔希民 1 姚德华 2 肖 武 3.巴岳山隧道受煤矿采动影响分析[J]. 现代隧道技术, 2019,56(6): 99-106